← Back
BuildNYC
General warehouse
44-01 11TH STREET
QUEENS · BIN 4005226
💬 Discuss this project
1930Year Built
4Stories
E1Building Class
M1-4AZoning
36,000 sfGross Floor Area
1Units
LL97 Covered1 Active Violation ▸FDNY Report ↗
General warehouse · Owner of record: Metropolitan Lic · 9,000 sf lot · 4 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofVm 4401 LLCUnder Construction48p · 3 filings · 20 docs
BulkheadVm 4401 LLCUnder Construction2p · 1 filing · 20 docs
Floor 4Vm 4401 LLCUnder Construction44p · 1 filing · 20 docs
Floor 3Vm 4401 LLCUnder Construction46p · 1 filing · 20 docs
Floor 2Vm 4401 LLCUnder Construction46p · 1 filing · 20 docs
Floor 1Vm 4401 LLCUnder Construction49p · 4 filings · 20 docs
CellarRetro RecessUnder Construction12p · 2 filings · 20 docs
BasementRetro RecessUnder Construction25p · 2 filings · 20 docs
Sub-BasementRetro RecessUnder Construction44p · 4 filings · 20 docs
Site & exteriorVm 4401 LLCUnder Construction49p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VM5110/17/2026
Metropolitan Lic103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York403/21/2026
A1 Expediting Service603/21/2026
AO Consulting and Drafting403/21/2026
J.A.M. Associates1803/21/2026
K & M Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skyline Scaffolding GroupScaffold1007/08/2026
Mega Contracting GPScaffold303/21/2026
Skyline Scaffolding Groupspecialty_contractor303/21/2026
Mega Contracting GPGeneral Contractor307/08/2026
Magic MechanicalFire Protection207/08/2026
UpstrateGeneral Contractor207/08/2026
Vik XS ServicesScaffold203/21/2026
Magic MechanicalPlumbing207/08/2026
A & E PlumbingPlumbing107/08/2026
DDS Mechanical FPSFire Protection106/07/2026
Alpine Enterprises NYGeneral Contractor104/09/2026
Unitech DesignSign hanger107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
International Geotehcnica1795510/16/2026
Metric Consulting and Ins18031108/07/2026
Building Lifecycle
All (171)Filed (28)Permit Issued (20)Signed Off (7)Violation (33)Inspection (7)Objection (46)Special Inspection (30)
10/16/2026
Filed — Alteration
Q01344944-P2
10/15/2026
Objection resolved — Resolved
10/14/2026
Objection raised — Other
10/05/2026
Filed — Alteration CO
interior fit-out and change of use of an existing basement-level tenant space. The space is being converted from light industrial/manufacturing use (D-2) to an assembly use (F-4) for an arcade, bar, and dining establishment.
Q01354467-P1
10/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
10/02/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
09/21/2026
Objection raised — Energy
09/21/2026
Objection raised — Cost
09/16/2026
Signed off — Alteration
PLUMBING AND SPRINKLER WORK ASSOCIATED WITH RENOVATION AS PER PLANS FILED HEREWITH.
Q01042930-I1
09/16/2026
Objection resolved — Resolved
09/16/2026
Objection resolved — Resolved
09/14/2026
Objection raised — Structural
09/14/2026
Objection raised — Structural
08/24/2026
Signed off — Alteration
PLUMBING AND SPRINKLER WORK ASSOCIATED WITH RENOVATION AS PER PLANS FILED HEREWITH.
Q01042930-S2
08/12/2026
Filed — Alteration
INTERIOR RENOVATION OF FIRST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
Q01366565-S2
08/07/2026
Filed — Alteration
PLUMBING AND SPRINKLER WORK ASSOCIATED WITH RENOVATION AS PER PLANS FILED HEREWITH.
Q01042930-P7
07/29/2026
Objection resolved — Resolved
07/28/2026
Objection raised — Other
07/20/2026
Filed — Alteration
INTERIOR RENOVATION OF FIRST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
Q01366565-S1
07/13/2026
Special inspection requirement — Ventilation and air distribution system
07/13/2026
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/01/2026
Filed — Alteration
INTERIOR RENOVATION OF FIRST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
Q01366565-I1
07/01/2026
Permit issued — Sign
Q01418467-I1-SG
06/30/2026
Filed — Alteration
PROPOSED INSTALLATION OF 1 ILLUMINATED, DOUBLE FACED, NON FLASHING, ACCESSORY BUSINESS SIGN. WORDING "ARCADE BAR" "RETRO RECESS"
Q01418467-I1
06/25/2026
Special inspection requirement — Mechanical Systems
06/25/2026
Special inspection requirement — Final
06/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/25/2026
Special inspection requirement — Maintenance information
06/25/2026
Special inspection requirement — Shutoff dampers
06/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/25/2026
Special inspection requirement — Maintenance information
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/05/2026
Permit issued — Plumbing
Q01344946-I1-EW-SP
05/06/2026
Filed — Alteration
PLUMBING AND SPRINKLER WORK ASSOCIATED WITH RENOVATION AS PER PLANS FILED HEREWITH.
Q01042930-P2
04/13/2026
Permit issued — General Construction
Q01354467-I1-GC
04/13/2026
Permit issued — Mechanical Systems
Q01344944-I1-MS
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/03/2026
Filed — Alteration
General Construction / Demo work as shown on plans submitted herewith
Q01382123-I1
04/02/2026
Objection raised — Other
04/02/2026
Special inspection requirement — Final
03/18/2026
Permit issued — Sprinklers
Q01344946-I1-PL
03/17/2026
Objection raised — Other
03/10/2026
Filed — No Work
Q01354456-I1
03/03/2026
Special inspection requirement — Final
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/25/2026
Filed — Alteration
Plumbing and Sprinkler work as shown on plans submitted herewith. No change to use, occupancy or egress as of right.
Q01344946-I1
02/25/2026
Filed — Alteration
Q01344944-I1
02/24/2026
Filed — Alteration CO
interior fit-out and change of use of an existing basement-level tenant space. The space is being converted from light industrial/manufacturing use (D-2) to an assembly use (F-4) for an arcade, bar, and dining establishment.
Q01354467-I1
02/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
02/24/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
02/19/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offUnitech Design07/01/2026
DOB NOWSprinklersPermit IssuedDDS Mechanical FPS06/05/2026
DOB NOWGeneral ConstructionPermit IssuedUpstrate04/13/2026
DOB NOWMechanical SystemsPermit IssuedUpstrate04/13/2026
DOB NOWPlumbingPermit IssuedA & E Plumbing03/18/2026
DOB NOWPlumbingPermit IssuedMagic Mechanical10/30/2025
DOB NOWSprinklersPermit IssuedMagic Mechanical10/30/2025
DOB NOWConstruction FenceSigned-offMega Contracting GP04/15/2025
DOB NOWMechanical SystemsSigned-offAlpine Enterprises NY11/14/2024
DOB NOWGeneral ConstructionSigned-offMega Contracting GP10/28/2024
DOB NOWPlumbingPermit IssuedMagic Mechanical10/28/2024
DOB NOWStructuralSigned-offMega Contracting GP10/28/2024
DOB NOWGeneral ConstructionSigned-offMega Contracting GP10/28/2024
DOB NOWSprinklersPermit IssuedMagic Mechanical10/28/2024
DOB NOWSupported ScaffoldSigned-offSkyline Scaffolding Group10/03/2024
DOB NOWSupported ScaffoldPermit IssuedVik XS Services07/23/2024
DOB NOWSuspended ScaffoldPermit IssuedVik XS Services07/23/2024
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/10/2024
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/12/2023
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group10/14/2022
1 project · most recent 08/07/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/07/2026Signed-offAlpine Enterprises NYHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUHY-EP312TSNU-A1 350,000 BTU · Vrf Outdoor ×2
PUHY-EP336TSNU-A1 378,000 BTU · Vrf Outdoor ×2
PUHY-EP384TSNU-A1 430,000 BTU · Vrf Outdoor ×2
2 projects · most recent 08/07/2026
Sprinkler System
FiledStatusContractorScope
08/07/2026Permit IssuedMagic MechanicalSprinkler System
02/25/2026Permit IssuedDDS Mechanical FPS53 heads
3 projects · most recent 08/12/2026
Water/Sanitary Storm
FiledStatusContractorScope
08/12/2026——Water/Sanitary
08/07/2026Permit IssuedMagic MechanicalStorm, Water/Sanitary
02/25/2026Permit IssuedA & E PlumbingWater/Sanitary
6 projects · most recent 09/29/2026
General Wiring
FiledStatusContractorScope
09/29/2026Permit IssuedMajor ElectricGeneral Wiring
06/19/2026Permit IssuedAtmos Electric Svce—
05/06/2026Permit IssuedCMY ElectricalGeneral Wiring
12/11/2025CompleteMajor ElectricGeneral Wiring
02/18/2025CompleteTuxedo Electrical Contracting—
07/07/2022CompleteTop Shelf Electric—
1 project · most recent 10/28/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/28/2024Signed-offSkyline Scaffolding GroupScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/18/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/14/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
10/02/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
10/02/2026Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
07/13/2026Ventilation and air distribution system—energy_progress
07/13/2026Sprinkler SystemsSAMI HAJJAR P.Especial
07/13/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
06/25/2026Mechanical Systems—special
06/25/2026Final—progress
06/25/2026HVAC-R and service water heating system controls—energy_progress
06/25/2026Maintenance information—energy_progress
06/25/2026Shutoff dampers—energy_progress
06/25/2026HVAC-R and service water piping design and insulation—energy_progress
06/25/2026HVAC-R and service water heating equipment—energy_progress
06/25/2026HVAC-R and service water heating equipment—energy_progress
06/25/2026HVAC-R and service water heating system controls—energy_progress
06/25/2026Fire-Resistant Penetrations and Joints—special
06/25/2026HVAC-R and service water piping design and insulation—energy_progress
06/25/2026Maintenance information—energy_progress
06/25/2026Fire-Resistant Penetrations and Joints—special
04/02/2026Final—progress
03/03/2026Final—progress
03/03/2026Fire-Resistant Penetrations and Joints—special
02/24/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
02/24/2026Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
02/19/2026Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
02/19/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
Latest 25 of 56.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Retro RecessArts / Culture / EntertainmentCellar
Project Q01344946 Alteration · Permit Entire · 02/25/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
08/22/2026Q01042930-S2Request digital key ↗
08/22/2026Q01042930-P7Request digital key ↗
08/22/2026Q01042930-P6Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/17/2026Q01354456-I1Request digital key ↗
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature23
10/06/2026Q01354467-I1Open ↗
10/06/2026Q01354467-P1Open ↗
08/22/2026Q01042930-P7Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
10/06/2026Q01354467-I1Open ↗
10/06/2026Q01354467-P1Open ↗
09/29/2026Q01042930-P7Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
10/06/2026Q01354467-P1Open ↗
10/06/2026Q01354467-I1Open ↗
09/01/2026Q01042930-P4Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
10/06/2026Q01354467-I1Open ↗
10/06/2026Q01354467-P1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
10/06/2026Q01354467-I1Open ↗
10/06/2026Q01354467-P1Open ↗
08/17/2026Q01382123-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/22/2026Q01042930-S4Open ↗
08/22/2026Q01042930-S3Open ↗
08/22/2026Q01042930-S2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents10
▸DOB NOWProof of Historic Building6
10/06/2026Q01354467-P1Open ↗
08/13/2026Q01344944-I1Open ↗
08/13/2026Q01042930-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification2
10/06/2026Q01354467-I1Open ↗
10/06/2026Q01354467-P1Open ↗
▸DOB NOWCalculations1
08/13/2026Q00770643-S1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q00770643-S1Open ↗