← Back
Four families
44 1 PLACE
BROOKLYN · BIN 3005104
💬 Discuss this project
1910Year Built
3Stories
C3Building Class
R6BZoning
3,672 sfGross Floor Area
4Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Four families · 2,400 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Bulkhead1p · 2 filings · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/14/2026$4.8M—Private party → 44 FIRST PLACE LLC$1,314/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN STUDIO ASSOCIATES205/15/2026
Building Lifecycle
All (51)Filed (1)Violation (19)Objection (20)Special Inspection (11)
07/31/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Open
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
06/02/2026
Objection raised — Other
06/02/2026
Objection raised — Other
06/02/2026
Objection raised — Other
06/02/2026
Objection raised — Other
06/02/2026
Objection raised — Other
06/02/2026
Objection raised — Other
05/28/2026
Objection raised — Other
05/28/2026
Objection raised — Admin
05/28/2026
Objection raised — Scope
05/28/2026
Objection raised — Other
05/15/2026
Filed — Alteration
Horizontal Enlargement & Renovation of Existing Four (4) Story & Cellar, Four (4) Family Dwelling
B01402147-I1
05/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/14/2026
Special inspection requirement — Concrete - Cast-In-Place
05/14/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/14/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/14/2026
Special inspection requirement — Masonry
05/14/2026
Special inspection requirement — Open-web Steel Joists and Joist Girders
05/14/2026
Special inspection requirement — Subgrade Inspections
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
04/30/2026
Violation issued (HPD, open)
A
03/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/16/2024
Violation issued (HPD, closed)
B
01/16/2024
Violation issued (HPD, open)
B
01/16/2024
Violation issued (HPD, open)
B
11/22/2023
Violation issued (HPD, closed)
I
10/23/2023
Violation issued (HPD, open)
C
10/23/2023
Violation issued (HPD, open)
C
03/17/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
07/07/2012
Violation issued (HPD, closed)
B
07/31/1992
Violation issued (FDNY_NOV, closed)
09/20/1989
Violation issued (FDNY_NOV, closed)
Nothing on file for this building.
2 projects · most recent 05/15/2026
Sprinkler System
FiledStatusContractorScope
05/15/2026——Sprinkler System
———Sprinkler System
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/14/2026Fire-Resistance Rated Construction—progress
05/14/2026Structural Stability – Alterations of existing buildings—special
05/14/2026Concrete - Cast-In-Place—special
05/14/2026Excavations - Sheeting, Shoring, and Bracing—special
05/14/2026Exterior Insulation and Finish Systems (EIFS)—special
05/14/2026Fire-Resistant Penetrations and Joints—special
05/14/2026Masonry—special
05/14/2026Open-web Steel Joists and Joist Girders—special
05/14/2026Subgrade Inspections—special
05/14/2026Energy Code Compliance Inspections—progress
03/30/2026Structural Stability – Alterations of existing buildings—special
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/03/2026B01380233-I1Request digital key ↗
08/15/2026B01402147-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01402147-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/03/2026B01380233-I1Open ↗
08/17/2026B01402147-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026B01402147-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial2
09/03/2026B01380233-I1Open ↗
08/15/2026B01402147-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026B01402147-I1Open ↗
▸DOB NOWPlot Diagram1
08/15/2026B01402147-I1Open ↗