Hospital, sanitarium, mental institution
44-22 PARSONS BOULEVARD
QUEENS · BIN 4117368
💬 Discuss this project
1958Year Built
5Stories
I1Building Class
R4Zoning
131,000 sfGross Floor Area
1Units
LL97 Covered78 Open Violations 32 unresolved · 46 paperwork only ▸
Hospital, sanitarium, mental institution · Owner of record: FLUSHING HOSPITAL & MEDICAL CENTER · 154,250 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 7 docs
Floor 6Under Construction65p · 7 filings · 20 docs
Floor 5Under Construction1p · 1 filing · 7 docs
Floor 410p · 2 filings · 11 docs
Floor 328p · 3 filings · 12 docs
Floor 217p · 4 filings · 20 docs
Floor 11p · 1 filing · 4 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FLUSHING HOSPITAL MEDI7009/09/2026
JAMAICA HOSPITAL307/08/2026
FLUSHING HOSPITAL CENTER203/22/2026
WELCOME PARKING INC103/22/2026
FLUGHING HOSPITAL MEDI103/22/2026
FLUSHING HOSPITAL103/22/2026
FL. HOSPITAL MED. CENT103/22/2026
JAMAICA HOSPITAL MEDICAL CENTER303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FAVIO MARIA BARRIONUEVO2003/21/2026
XPDITE GROUP LLC (104)903/21/2026
JAM CONSULTANTS, INC.203/21/2026
JAMAICA HOSPITAL103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EESON CONSTRUCTION TSG LLGeneral Contractor1509/09/2026
ARIANA CONTRACTING INCFire Protection207/08/2026
AVON PLBG & HTG INCFire Protection207/08/2026
ASKO ELEC CONST & MAIN INElectrical203/22/2026
ARIANA CONTRACTING INCPlumbing207/08/2026
AVON PLBG & HTG INCPlumbing207/08/2026
JAMAICA HOSPITAL MEDICALGeneral Contractor206/28/2026
GALVIN BROTHERS INCGeneral Contractor107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID KATZ, P.E.6087901/27/2026
AK ENGINEERING PC678109/04/2024
LEDER-LUIS ARCHITECTURAL1553508/17/2023
Building Lifecycle
All (217)Filed (21)Permit Issued (21)Signed Off (5)Violation (60)Inspection (24)Objection (56)Special Inspection (30)
09/08/2026
Permit issued — Mechanical Systems
Q01219824-I1-MS
09/03/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/07/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/20/2026
Permit issued — General Construction
Q01221393-I1-GC
04/20/2026
Permit issued — General Construction
Q01219775-I1-GC
04/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/20/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/27/2026
Signed off — Alteration
FLUSHING HOSPITAL 1982 BUILDING REFLECTION CLINIC, PARTIAL 4TH FLOOR. DEMO EXIST & CONST OF NEW NON-BEARING INT PARTITIONS, SUSP CEILING & FINISHES TO CREATE OUTPATIENT MEDICAL OFFICES. MH, PL, SP, FA UNDER SEPARATE APPLICATIONS; NO STRUCT WORK.
Q01256283-I1
01/27/2026
Filed — Alteration
MODIFICATIONS OF EXISTING WET SPRINKLER SYSTEM THROUGHOUT THE PARTIAL 4TH FLOOR WORK AREA, FLUSHING HOSPITAL MEDICAL CENTER, 1982 BUILDING REFLECTION CLINIC, AS PER PLANS SUBMITTED.
Q01178747-P1
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Katz
12/23/2025
Special inspection requirement — Sprinkler Systems
David Katz
12/23/2025
Special inspection requirement — Post-installed Anchors
David Katz
12/09/2025
Permit issued — General Construction
Q01256283-I1-GC
11/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/03/2025
Permit issued — Plumbing
Q01221501-I1-PL
11/03/2025
Permit issued — Plumbing
Q01221547-I1-PL
11/03/2025
Permit issued — Sprinklers
Q01225894-I1-EW-SP
10/31/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/08/2025
Permit issued — Mechanical Systems
Q01221443-I1-MS
10/08/2025
Permit issued — Sprinklers
Q01178747-I1-EW-SP
10/07/2025
Permit issued — Mechanical Systems
Q01219824-I1-MS
09/11/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
08/29/2025
Objection resolved — Addressed
08/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
David Katz
08/12/2025
Objection raised — Scope
08/12/2025
Objection raised — Admin
08/12/2025
Objection raised — Admin
07/29/2025
Filed — Alteration
FLUSHING HOSPITAL 1982 BUILDING REFLECTION CLINIC, PARTIAL 4TH FLOOR. DEMO EXIST & CONST OF NEW NON-BEARING INT PARTITIONS, SUSP CEILING & FINISHES TO CREATE OUTPATIENT MEDICAL OFFICES. MH, PL, SP, FA UNDER SEPARATE APPLICATIONS; NO STRUCT WORK.
Q01256283-I1
07/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Katz
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
David Katz
07/15/2025
Special inspection requirement — Final
David Katz
07/15/2025
Special inspection requirement — Interior lighting power
David Katz
07/14/2025
Objection resolved — Addressed
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
David Katz
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/17/2025
Objection raised — Inspections
06/17/2025
Objection raised — Inspections
06/17/2025
Objection raised — Plumbing
06/17/2025
Objection raised — Energy
06/17/2025
Objection raised — Admin
06/17/2025
Objection raised — Structural
06/17/2025
Objection raised — Energy
06/17/2025
Objection raised — Inspections
06/12/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
Latest 60 of 217 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedEESON CONSTRUCTION TSG LL09/08/2026
DOB NOWGeneral ConstructionPermit IssuedJAMAICA HOSPITAL MEDICAL04/20/2026
DOB NOWGeneral ConstructionPermit IssuedJAMAICA HOSPITAL MEDICAL04/20/2026
DOB NOWGeneral ConstructionSigned-offEESON CONSTRUCTION TSG LL12/09/2025
DOB NOWPlumbingPermit IssuedAVON PLBG & HTG INC11/03/2025
DOB NOWPlumbingPermit IssuedAVON PLBG & HTG INC11/03/2025
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC11/03/2025
DOB NOWMechanical SystemsPermit IssuedEESON CONSTRUCTION TSG LL10/08/2025
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC10/08/2025
DOB NOWMechanical SystemsPermit IssuedEESON CONSTRUCTION TSG LL10/07/2025
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC11/06/2024
DOB NOWConstruction FenceSigned-offGALVIN BROTHERS INC11/01/2024
DOB NOWGeneral ConstructionPermit IssuedEESON CONSTRUCTION TSG LL12/06/2023
DOB NOWSprinklersSigned-offARIANA CONTRACTING INC10/31/2022
DOB NOWPlumbingSigned-offARIANA CONTRACTING INC10/31/2022
DOB NOWPlumbingSigned-offARIANA CONTRACTING INC10/26/2022
DOB NOWSprinklersSigned-offARIANA CONTRACTING INC10/26/2022
DOB NOWMechanical SystemsPermit IssuedEESON CONSTRUCTION TSG LL10/24/2022
DOB NOWGeneral ConstructionSigned-offEESON CONSTRUCTION TSG LL10/05/2022
DOB NOWGeneral ConstructionPermit IssuedEESON CONSTRUCTION TSG LL10/05/2022
DOB NOWMechanical SystemsPermit IssuedEESON CONSTRUCTION TSG LL09/27/2022
BISOTISSUEDJAMAICA HOSPITAL MEDICAL10/22/2018
BISPLISSUEDSPARACO'S P&H CORP09/06/2012
BIS—ISSUEDJAMAICA HOSPITAL MEDICAL09/04/2012
BISPLISSUEDALJER PLBG & HTG CORP09/05/1995
BISSPISSUEDDURNEY PLG07/18/1995
BISMHISSUEDALEXANDER WOLF AND SON06/14/1995
BISMHISSUEDALEXANDER WOLF AND SON02/08/1995
BISPLISSUEDNA03/22/1993
BISPLISSUEDN/A10/22/1992
BISOTISSUEDFLUSHING HOSPITAL MEDICAL CENTER10/15/1992
BISFPISSUEDRELIABLE FIORE PROTECTION12/11/1991
BISMHISSUEDMATCO SERVICE CORP11/27/1991
BISMHISSUEDJUSTIN TIME09/27/1989
3 projects · most recent 05/27/2025
Heating and Air Conditioning Systems Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
05/27/2025Permit IssuedEESON CONSTRUCTION TSG LLHeating and Air Conditioning Systems
Heat / Cool
Iec CPY06 485 CFM · Fan Coil Indoor ×3
CPY10 695 CFM · Fan Coil Indoor ×2
CPY12 900 CFM · Fan Coil Indoor ×2
CPY03 280 CFM · Fan Coil Indoor ×1
05/27/2025Permit IssuedEESON CONSTRUCTION TSG LLHeating and Air Conditioning Systems
Heat / Cool
Iec CPY10 790 CFM · Fan Coil Indoor ×8
CPY06 480 CFM · Fan Coil Indoor ×3
CPY12 910 CFM · Fan Coil Indoor ×3
CPY03 270 CFM · Fan Coil Indoor ×1
CPY08 510 CFM · Fan Coil Indoor ×1
Aaon RNA-013-B-A-8-00E0G-J0EP0:00-0FEAH-E00-00000-00000-DC-CB0A-00-00-0-AN0-EB-DA0A-00-000-AA0A00-00000B-000000B 220,300 BTU · Rooftop Unit ×1
07/26/2022Permit IssuedEESON CONSTRUCTION TSG LLAir Conditioning Systems, Associated Ducts and Piping
Ducts & Piping
Trane FCCB030, FCCB040, FCCB060, FCCB080, FCCB120 485,160 BTU · Fan Coil Indoor ×20
4 projects · most recent 01/27/2026
FiledStatusContractorScope
01/27/2026Permit IssuedAVON PLBG & HTG INC308 heads
05/27/2025Permit IssuedAVON PLBG & HTG INC103 heads
07/26/2022Signed-offARIANA CONTRACTING INC—
07/26/2022Signed-offARIANA CONTRACTING INC—
3 projects · most recent 05/27/2025
Water/Sanitary Storm
FiledStatusContractorScope
05/27/2025Permit IssuedAVON PLBG & HTG INCStorm, Water/Sanitary
05/27/2025Permit IssuedAVON PLBG & HTG INCStorm, Water/Sanitary
07/27/2022Signed-offARIANA CONTRACTING INCWater/Sanitary
8 projects · most recent 08/01/2023
General Wiring
FiledStatusContractorScope
08/01/2023CompleteASKO ELEC CONST & MAIN INGeneral Wiring
03/14/2023CompleteASKO ELEC CONST & MAIN INGeneral Wiring
11/11/2022CompleteASKO ELEC CONST & MAIN IN—
11/11/2022CompleteASKO ELEC CONST & MAIN IN—
10/14/2022CompleteWMS ELECTRICAL CONTNG LTD—
09/24/2021CompleteWMS ELECTRICAL CONTNG LTD—
06/29/2021CompleteWMS ELECTRICAL CONTNG LTD—
02/05/2020Permit IssuedJAMAICA HOSPITAL MED CTR—
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
09/03/2026Pass-Final General Construction Non-Directive 14PassView ↗
08/07/2026Fail-Final General Construction Non-Directive 14FailView ↗
06/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Fail-Final General Construction Non-Directive 14FailView ↗
11/14/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/15/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/10/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/29/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
12/23/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
12/23/2025Sprinkler SystemsDavid Katzspecial
12/23/2025Post-installed AnchorsDavid Katzspecial
08/18/2025Fire-Resistance Rated ConstructionDavid Katzprogress
07/17/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
07/16/2025Energy Code Compliance InspectionsDavid Katzprogress
07/15/2025FinalDavid Katzprogress
07/15/2025Interior lighting powerDavid Katzenergy_progress
07/14/2025Energy Code Compliance InspectionsDavid Katzprogress
05/22/2025Interior lighting powerDavid Katzenergy_progress
05/21/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
05/06/2025HVAC-R and service water piping design and insulationDavid Katzenergy_progress
05/06/2025Mechanical SystemsDavid Katzspecial
05/06/2025FinalDavid Katzprogress
05/06/2025Maintenance informationDavid Katzenergy_progress
05/06/2025HVAC-R and service water piping design and insulationDavid Katzenergy_progress
05/06/2025Shutoff dampersDavid Katzenergy_progress
05/06/2025HVAC-R and service water heating system controlsDavid Katzenergy_progress
05/06/2025HVAC-R and service water heating equipmentDavid Katzenergy_progress
05/06/2025FinalDavid Katzprogress
05/06/2025HVAC-R and service water piping design and insulationDavid Katzenergy_progress
05/02/2025HVAC-R and service water heating system controlsDavid Katzenergy_progress
05/02/2025Shutoff dampersDavid Katzenergy_progress
05/02/2025Maintenance informationDavid Katzenergy_progress
05/02/2025HVAC-R and service water piping design and insulationDavid Katzenergy_progress
Latest 25 of 36.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Tjh ClinicsMedical / HealthcareFloor 3
Project Q00758638 Alteration · Permit Entire · 07/26/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 217 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/26/2026Q00758638-I1Request digital key ↗
08/26/2026Q00758633-I1Request digital key ↗
08/26/2026Q00758128-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION22
10/28/2017421464631Open ↗
10/13/2017421464631Open ↗
02/07/2015420866897Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION4
11/19/2018421464631Open ↗
10/17/2012420583808Open ↗
09/11/2012420583808Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY3
02/07/2015420866897Open ↗
05/14/2014420866897Open ↗
09/13/2013420866897Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION2
09/23/2013420866897Open ↗
09/23/2013420866897Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/08/2013420583808Open ↗
▸Seals & Professional Certifications53
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/26/2026Q00758468-I1Open ↗
08/26/2026Q00758359-I1Open ↗
08/21/2026Q01113772-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026Q01221501-I1Open ↗
09/01/2026Q01221501-I1Open ↗
08/31/2026Q01221393-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
11/19/2018421464631Open ↗
11/08/2018421464631Open ↗
11/09/2017421464631Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026Q01221393-I1Open ↗
08/29/2026Q00758638-I1Open ↗
08/28/2026Q01178747-P1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING4
07/27/2013420583808Open ↗
07/18/2013420583808Open ↗
04/19/2013420583808Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
02/14/2014420583808Open ↗
02/14/2014420583808Open ↗
10/07/2013420583808Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
10/02/2013420583808Open ↗
08/30/2013420583808Open ↗
08/26/2013420583808Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
10/02/2013420583808Open ↗
08/29/2013420583808Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/16/2014420908003Open ↗
▸BISEQUIPMENT USE PERMITS1
02/14/2014420583808Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/21/2012420583808Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/26/2026Q00758468-I1Open ↗
08/26/2026Q00758359-I1Open ↗
08/20/2026Q01221393-I1Open ↗
Showing 3 of 16 on file for this type
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/08/2018421464631Open ↗
11/09/2017421464631Open ↗
11/07/2013420583808Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections2
10/02/2013420583808Open ↗
09/23/2013420866897Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/02/2013420583808Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00758128-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01104615-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01104615-I1Open ↗
▸Approvals, Objections & Sign-offs45
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/26/2026Q00758468-I1Open ↗
08/17/2026Q01178747-I1Open ↗
08/17/2026Q01178747-P1Open ↗
Showing 3 of 21 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
01/15/2015420583808Open ↗
11/20/2013420583808Open ↗
09/11/2013420583808Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
01/15/2015420583808Open ↗
09/16/2014420583808Open ↗
05/22/2014420583808Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
11/09/2017421464631Open ↗
10/13/2017421464631Open ↗
01/15/2015420583808Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/30/2013420908003Open ↗
06/21/2012420583808Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT5
04/16/2014420908003Open ↗
11/02/2013420583808Open ↗
10/30/2013420908003Open ↗
Showing 3 of 5 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
10/13/2017421464631Open ↗
10/02/2013420583808Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION10
01/17/2014420583808Open ↗
10/29/2013420583808Open ↗
10/29/2013420583808Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET3
10/13/2017421464631Open ↗
10/30/2013420908003Open ↗
06/21/2012420583808Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM3
11/16/2013420583808Open ↗
10/02/2013420583808Open ↗
08/31/2012420583808Open ↗