← Back
BuildNYC
Condo, residential unit in elevator building
The Vantage at Purvis Condominium
44-27 PURVES STREET · BIN 4534900
💬 Discuss this project
2006Year Built
15Stories
R4Building Class
M1-5/R9Zoning
63,519 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized0 Active Violations 1 likely answered ▸FISP: SWARMPFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: The Vantage at Purvis Condominium · 7,500 sf lot · 8.47 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolstice Residential Group1p · 1 filing · 6 docs
Floor 1Pipe scaffolding2p · 1 filing · 3 docs
CellarSolstice Residential Group18p · 4 filings · 20 docs
Site & exteriorSidewalk shed for material storage14p · 3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Purves St Associates3403/21/2026
Solstice Residential Group1507/08/2026
Vantage at Jackson703/21/2026
50 Franklin Street Condominium Associates103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Robert Germain Jr. PE101/06/2025
Ashraf208/02/2023
SW Engineering Company507/20/2023
Cowley Engineering107/14/2023
Tohfaz Uddin PE204/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design203/21/2026
Theresa Voltaggio103/21/2026
Municipal Building Consultants503/21/2026
Spring Scaffolding403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Purves Street AssociatesGeneral Contractor703/21/2026
Prat EnterprisesScaffold407/08/2026
Spring ScaffoldingScaffold407/08/2026
The Metro GroupGeneral Contractor303/21/2026
Prat EnterprisesGeneral Contractor303/21/2026
All Safe HeightGeneral Contractor203/21/2026
Champion Combustionspecialty_contractor203/21/2026
Crossland Mechanicalspecialty_contractor203/21/2026
B H Plumbing & HeatingPlumbing103/21/2026
Broadtrade Plumbing & HeatingPlumbing103/21/2026
Broadtrade PLG HeatingPlumbing103/21/2026
Champ Plumbing & HeatingPlumbing107/08/2026
Interstate ElectricElectrical103/21/2026
M&G Plumbing and HeatingPlumbing107/08/2026
Itkin ElectricElectrical103/22/2026
The Metro Group ElectricElectrical203/22/2026
Skyline RestorationGeneral Contractor103/21/2026
First Class WreckingGeneral Contractor305/12/2004
NYC Sprinkler SystemsFire Protection109/08/2006
Peuves St AssociatesGeneral Contractor204/06/2005
Xinos ConstructionGeneral Contractor111/21/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Robert F. Germain Jr. PE5100101/06/2025
SW Engineering Company, P1832307/20/2023
SWL Engineering Inspectio6912507/20/2023
Cowley Engineering186107/14/2023
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/09/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/29/2026
Elevator Category 1 inspection report filed
07/31/2026
Apartment 4A sold
10/16/2025
Boiler inspection report filed
Initial · no defects · Accepted
203 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offThe Metro Group01/13/2025
DOB NOWMechanical SystemsSigned-offCrossland Mechanical08/07/2024
DOB NOWBoiler EquipmentSigned-offM&G Plumbing and Heating07/11/2024
DOB NOWGeneral ConstructionSigned-offPrat Enterprises08/11/2023
DOB NOWProtection and Mechanical MethodsSigned-offPrat Enterprises08/03/2023
DOB NOWSidewalk ShedSigned-offPrat Enterprises08/02/2023
DOB NOWMechanical SystemsPermit IssuedChampion Combustion07/29/2022
DOB NOWPlumbingSigned-offChamp Plumbing & Heating07/29/2022
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding04/30/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding04/30/2021
BISOTISSUEDSkyline Restoration03/01/2021
BISOTISSUEDSkyline Restoration10/16/2020
BISOTISSUEDXinos Construction11/21/2016
BISOTISSUEDGene Kaufman Architect02/01/2008
BISPLISSUEDDC Building Services06/19/2007
BISEQISSUEDPurves Street Associates04/12/2007
BIS—ISSUEDPurves Street Associates04/10/2007
BISEQISSUEDAll Safe Height03/31/2007
BISEQISSUEDAll Safe Height03/31/2007
BISBLISSUEDDC Building Services03/15/2007
BISEQISSUEDAll Safe Height09/19/2006
BISSPISSUEDFull Capacity Fire09/08/2006
BISEQISSUEDAll Safe Height07/28/2006
BISPLISSUEDDC Building Services04/20/2006
BISEQISSUEDPurves Street Associates04/06/2006
BIS—ISSUEDPurves Street Associates04/06/2006
BISEQISSUEDPurves Street Associates01/12/2006
BISEQISSUEDPurves Street Associates04/06/2005
BISOTISSUEDPeuves St Associates04/06/2005
BIS—ISSUEDPurves Street Associates04/05/2005
BISPLISSUEDB.H. Plumbing & Heating03/07/2005
BISEQISSUEDPurves Street Associates10/20/2004
BIS—ISSUEDPurves Street Associates10/20/2004
BISOTISSUEDPeuves St Associates10/01/2004
BIS—ISSUEDFirst Class Wrecking05/12/2004
BISEQISSUEDFirst Class Wrecking05/12/2004
BISEQISSUEDFirst Class Wrecking05/12/2004
5 projects · most recent 11/26/2024
General Wiring Boiler Controls
FiledStatusContractorScope
11/26/2024Permit IssuedThe Metro Group Electric—
11/14/2024CompleteInterstate ElectricGeneral Wiring
08/18/2023CompleteAUR0RA Electrical Contg—
11/09/2022CompleteItkin ElectricBoiler Controls
10/15/2020CompleteTop Shelf Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/12/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
12/31/2024Tenant Protection Plan ComplianceRobert Germain Jr.special
12/26/2024FinalRobert Germain Jr.progress
12/26/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/26/2024Chimneys and ventsRobert Germain Jr.special
07/11/2023Tenant Protection Plan ComplianceEric Cowleyspecial
06/19/2023Post-installed AnchorsEric Cowleyspecial
06/19/2023FinalEric Cowleyprogress
06/19/2023MasonryEric Cowleyspecial
06/09/2023Post-installed AnchorsJOSHUA LUCKRITZspecial
06/08/2023Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
06/06/2023HVAC-R and service water heating equipmentEDWARD SIMONIELLOenergy_progress
06/06/2023HVAC-R and service water piping design and insulationEDWARD SIMONIELLOenergy_progress
06/06/2023HVAC-R and service water heating system controlsEDWARD SIMONIELLOenergy_progress
06/06/2023Maintenance informationEDWARD SIMONIELLOenergy_progress
06/06/2023Heating SystemsEDWARD SIMONIELLOspecial
06/02/2023Mechanical SystemsEDWARD SIMONIELLOspecial
06/02/2023Chimneys and ventsEDWARD SIMONIELLOspecial
06/02/2023Fire-Resistant Penetrations and JointsJOSHUA LUCKRITZspecial
06/02/2023Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
06/02/2023Energy Code Compliance InspectionsEDWARD SIMONIELLOprogress
06/02/2023FinalEDWARD SIMONIELLOprogress
11/15/2022Post-installed AnchorsJOSHUA LUCKRITZspecial
11/15/2022HVAC-R and service water heating equipmentEDWARD SIMONIELLOenergy_progress
11/15/2022Maintenance informationEDWARD SIMONIELLOenergy_progress
11/15/2022HVAC-R and service water piping design and insulationEDWARD SIMONIELLOenergy_progress
Latest 25 of 33.
90 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account