← Back
BuildNYC
Multi-story retail building (2+)
44-35 DOUGLASTON PARKWAY
QUEENS · BIN 4453377
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
R1-2Zoning
24,630 sfGross Floor Area
24Units
8 Active Violations 1 unresolved · 7 paperwork only 1 likely answered ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: Douglaston Corner · 18,414 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofKimchi2p · 2 filings · 17 docs
Floor 1Kimchi12p · 3 filings · 20 docs
CellarKimchi1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Douglaston Corner1403/21/2026
Ridge Realty403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BKH Architect107/21/2026
JKM Architecture208/03/2025
SY Engineering808/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
C Plus Design Group2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CK Plumbing & MechanicalPlumbing307/08/2026
C Plus Design GroupGeneral Contractor107/08/2026
Unique Mechanicalspecialty_contractor107/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BKH Architect6255107/21/2026
JKM Architecture8906107/21/2025
SY Engineering5149408/17/2021
Building Lifecycle
All (54)Filed (11)Permit Issued (5)Signed Off (3)Violation (5)Special Inspection (30)
08/05/2026
Signed off — Alteration
DIRECT REPLACE 2 HVAC (10 TOTAL) RTU ON ROOF THAT SERVE FIRST & SECOND FLOOR UNITS OF: 44-35/44-39 DOUGLASTON PARKWAY
Q01433394-I1
07/23/2026
Permit issued — General Construction
Q01433394-I1-GC-CX
07/21/2026
Filed — Alteration
DIRECT REPLACE 2 HVAC (10 TOTAL) RTU ON ROOF THAT SERVE FIRST & SECOND FLOOR UNITS OF: 44-35/44-39 DOUGLASTON PARKWAY
Q01433394-I1
07/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Brandon Hamchuk
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brandon Hamchuk
07/20/2026
Special inspection requirement — Mechanical Systems
Brandon Hamchuk
07/20/2026
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
Brandon Hamchuk
07/20/2026
Special inspection requirement — Maintenance information
Brandon Hamchuk
07/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Brandon Hamchuk
07/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Brandon Hamchuk
07/20/2026
Special inspection requirement — Air barrier - visual inspection
Brandon Hamchuk
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Brandon Hamchuk
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Brandon Hamchuk
07/20/2026
Special inspection requirement — Final
Brandon Hamchuk
08/03/2025
Filed — Alteration
INSTALLATION OF BBQ SYSTEM, INCLUDING EXHAUST DUCT AND FAN. NO CHANGE IN USE, OCCUPANCY CLASSIFICATION AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01246687-S1
07/25/2025
Permit issued — Mechanical Systems
Q01246687-I1-MS
07/21/2025
Filed — Alteration
INSTALLATION OF BBQ SYSTEM, INCLUDING EXHAUST DUCT AND FAN. NO CHANGE IN USE, OCCUPANCY CLASSIFICATION AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01246687-I1
06/26/2025
Special inspection requirement — Duct leakage testing, insulation and design
YOUNGSAM YU
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Min
06/25/2025
Special inspection requirement — Mechanical Systems
John Min
06/25/2025
Special inspection requirement — Final
John Min
06/01/2023
Violation issued (FDNY_ORDER, closed)
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/08/2021
Signed off — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURE AND COOKING EQUIPMENT. THIS APPLICATION IS IN CONJUNCTION WITH APPLICATION# 421805026.
Q00312849-I1
12/08/2021
Signed off — Alteration
INSTALLATION OF (2)GAS BOILER. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q00442289-I1
08/19/2021
Special inspection requirement — Maintenance information
SUNGBOM YI
08/19/2021
Special inspection requirement — Shutoff dampers
SUNGBOM YI
08/19/2021
Special inspection requirement — HVAC and service water heating equipment
SUNGBOM YI
08/19/2021
Special inspection requirement — HVAC and service water heating system controls
SUNGBOM YI
08/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
08/17/2021
Filed — Alteration
INSTALLATION OF (2)GAS BOILER. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q00442289-P3
05/19/2021
Filed — Alteration
INSTALLATION OF (2)GAS BOILER. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q00442289-P2
03/22/2021
Special inspection requirement — Shutoff dampers
SUNGBOM YI
03/22/2021
Special inspection requirement — HVAC and service water heating system controls
SUNGBOM YI
03/22/2021
Special inspection requirement — Maintenance information
SUNGBOM YI
03/22/2021
Special inspection requirement — HVAC and service water heating equipment
SUNGBOM YI
03/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
02/19/2021
Filed — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURE AND COOKING EQUIPMENT. THIS APPLICATION IS IN CONJUNCTION WITH APPLICATION# 421805026.
Q00312849-P3
02/05/2021
Filed — Alteration
INSTALLATION OF (2)GAS BOILER. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q00442289-P1
02/05/2021
Permit issued — Plumbing
Q00312849-I1-PL
02/03/2021
Permit issued — Boiler Equipment
Q00442289-I1-BE
01/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
01/30/2021
Special inspection requirement — HVAC and service water heating system controls
SUNGBOM YI
01/30/2021
Special inspection requirement — Maintenance information
SUNGBOM YI
01/30/2021
Special inspection requirement — Shutoff dampers
SUNGBOM YI
01/30/2021
Special inspection requirement — HVAC and service water heating equipment
SUNGBOM YI
01/11/2021
Filed — Alteration
INSTALLATION OF (2)GAS BOILER. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q00442289-I1
12/14/2020
Filed — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURE AND COOKING EQUIPMENT. THIS APPLICATION IS IN CONJUNCTION WITH APPLICATION# 421805026.
Q00312849-P2
07/08/2020
Violation issued (ECB, closed)
Unknown
02/24/2020
Filed — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURE AND COOKING EQUIPMENT. THIS APPLICATION IS IN CONJUNCTION WITH APPLICATION# 421805026.
Q00312849-P1
02/12/2020
Permit issued — Plumbing
Q00312849-I1-PL
02/10/2020
Filed — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURE AND COOKING EQUIPMENT. THIS APPLICATION IS IN CONJUNCTION WITH APPLICATION# 421805026.
Q00312849-I1
04/03/2017
Violation issued (FDNY_NOV, closed)
08/12/1992
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offUnique Mechanical07/23/2026
DOB NOWMechanical SystemsPermit IssuedC Plus Design Group07/25/2025
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical02/05/2021
DOB NOWBoiler EquipmentSigned-offCK Plumbing & Mechanical02/03/2021
DOB NOWPlumbingSigned-offCK Plumbing & Mechanical02/12/2020
BISOTISSUEDWorldkor Construction10/07/2021
BISOTISSUEDWorldkor Construction07/06/2020
BISOTISSUEDWorldkor Construction01/09/2020
BISEQISSUEDB H & B Construction05/05/2014
BISFPISSUEDNY Fire12/24/2013
BISPLISSUEDDyckman Plumbing and Heating11/27/2013
BISMHISSUEDHai Hong Construction11/21/2013
BISFPISSUEDIdeal Fire Safety Systems04/21/2009
BISMHISSUEDDual Purpose05/18/2006
BISFPISSUEDFire Command Co10/24/2005
BISMHISSUEDGeorge Perotto Associates09/26/2003
BISMHRE-ISSUEDSparaco's PLG and Heating09/25/2002
BISMHISSUEDRusso Enterprises03/05/2001
BISPLISSUEDTri City Mechanical Group03/01/2001
BISOTISSUEDRusso Enterprises02/21/2001
BISFPISSUEDSentienel Fire Control07/27/2000
2 projects · most recent 07/21/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2026Signed-offUnique MechanicalHeating and Air Conditioning Systems
Heat / Cool
Carrier 48GEEM05A2A3-A0A0 48,000 BTU · Rooftop Unit ×2
08/03/2025Permit IssuedC Plus Design GroupVentilation Systems—
1 project · most recent 03/05/2020
General Wiring Lighting
FiledStatusContractorScope
03/05/2020Permit IssuedY.S. ElectricGeneral Wiring, Lighting
1 project · most recent 07/21/2026
FiledStatusContractorScope
07/21/2026Signed-offUnique Mechanical1 scope_items
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/20/2026Structural Stability – Alterations of existing buildingsBrandon Hamchukspecial
07/20/2026Fire-Resistant Penetrations and JointsBrandon Hamchukspecial
07/20/2026Mechanical SystemsBrandon Hamchukspecial
07/20/2026Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsBrandon Hamchukspecial
07/20/2026Maintenance informationBrandon Hamchukenergy_progress
07/20/2026HVAC-R and service water heating equipmentBrandon Hamchukenergy_progress
07/20/2026HVAC-R and service water heating system controlsBrandon Hamchukenergy_progress
07/20/2026Air barrier - visual inspectionBrandon Hamchukenergy_progress
07/20/2026HVAC-R and service water piping design and insulationBrandon Hamchukenergy_progress
07/20/2026Energy Code Compliance InspectionsBrandon Hamchukprogress
07/20/2026FinalBrandon Hamchukprogress
06/26/2025Duct leakage testing, insulation and designYOUNGSAM YUenergy_progress
06/25/2025Fire-Resistant Penetrations and JointsJohn Minspecial
06/25/2025Mechanical SystemsJohn Minspecial
06/25/2025FinalJohn Minprogress
08/19/2021Maintenance informationSUNGBOM YIenergy_progress
08/19/2021Shutoff dampersSUNGBOM YIenergy_progress
08/19/2021HVAC and service water heating equipment SUNGBOM YIenergy_progress
08/19/2021HVAC and service water heating system controls SUNGBOM YIenergy_progress
08/19/2021Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
03/22/2021Shutoff dampersSUNGBOM YIenergy_progress
03/22/2021HVAC and service water heating system controls SUNGBOM YIenergy_progress
03/22/2021Maintenance informationSUNGBOM YIenergy_progress
03/22/2021HVAC and service water heating equipment SUNGBOM YIenergy_progress
03/22/2021Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
Latest 25 of 30.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
KimchiRestaurant / Food ServiceCellar, Floor 1, Roof
Project Q01246687 Alteration · Permit Entire · 07/21/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Plumbing4
08/28/2026Q00312849-I1Request digital key ↗
08/15/2026Q00312849-P3Request digital key ↗
08/15/2026Q00312849-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
08/27/2026Q00442289-P2Request digital key ↗
08/27/2026Q00442289-I1Request digital key ↗
08/15/2026Q00442289-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch3
08/19/2026Q01246687-I1Request digital key ↗
08/19/2026Q01246687-S1Request digital key ↗
08/16/2026Q01433394-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION8
10/19/2021421802026Open ↗
10/12/2021421802026Open ↗
01/15/2020421802026Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION7
01/15/2020421802026Open ↗
05/04/2014440141222Open ↗
01/06/2014420925921Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/19/2026Q01246687-S1Open ↗
08/19/2026Q01246687-I1Open ↗
08/16/2026Q01433394-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026Q00442289-I1Open ↗
09/01/2026Q01246687-I1Open ↗
09/01/2026Q01246687-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026Q00442289-I1Open ↗
09/01/2026Q01246687-I1Open ↗
09/01/2026Q01246687-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
01/15/2020421802026Open ↗
03/04/2014420924548Open ↗
11/26/2013420925921Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/15/2020421802026Open ↗
05/04/2014440141222Open ↗
11/25/2013420924548Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/04/2014440141222Open ↗
10/26/2013440112334Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/04/2014440141222Open ↗
10/26/2013440112334Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/15/2020421802026Open ↗
11/25/2013420924548Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
02/13/2014420924548Open ↗
01/08/2014420924548Open ↗
▸BISSCHEDULE B - PLUMBING1
11/25/2013420924548Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026Q00442289-I1Open ↗
08/13/2026Q00442289-P1Open ↗
08/13/2026Q00312849-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
01/15/2020421802026Open ↗
11/26/2013420925921Open ↗
11/25/2013420924548Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/07/2009420003196Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/15/2020421802026Open ↗
04/08/2014440112334Open ↗
03/27/2014420924548Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/13/2021421802026Open ↗
10/26/2013440112334Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/04/2014420924548Open ↗
04/08/2014440112334Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/26/2013440112334Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/13/2021421802026Open ↗
▸BISNYCECC ANALYSIS1
10/26/2013440112334Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/13/2021421802026Open ↗
05/04/2014440141222Open ↗
10/26/2013440112334Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/15/2021421802026Open ↗
04/08/2014440112334Open ↗
03/27/2014420924548Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/08/2014440112334Open ↗
03/27/2014420924548Open ↗
03/04/2014420925921Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
11/26/2013420925921Open ↗
11/25/2013420924548Open ↗
04/07/2009420003196Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
01/15/2020421802026Open ↗
03/04/2014420925921Open ↗
03/04/2014420924548Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/13/2021421802026Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
01/15/2020421802026Open ↗
11/26/2013420925921Open ↗
11/25/2013420924548Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/04/2014440141222Open ↗
10/26/2013440112334Open ↗
▸BISADDITIONAL INFORMATION2
10/19/2021421802026Open ↗
05/04/2014440141222Open ↗
▸Other Documents5
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS4
03/04/2014420925921Open ↗
03/04/2014420924548Open ↗
02/13/2014420924548Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/15/2021421802026Open ↗