← Back
Four families
44-53 64 STREET
QUEENS · BIN 4053637
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R4-1Zoning
2,400 sfGross Floor Area
4Units
Rent Stabilized27 Open Violations 25 unresolved · 2 paperwork only ▸
Four families · Owner of record: 64 STREET ALLIANCE LLC · 4,100 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
64 ST ALLIANCE LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.807/27/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OMEGA STUCCO CORPGeneral Contractor707/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177607/27/2024
Building Lifecycle
All (86)Filed (8)Permit Issued (4)Signed Off (3)Violation (43)Inspection (1)Objection (8)Special Inspection (19)
06/11/2025
Violation issued (HPD, closed)
A
03/04/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00830924
Q00830938-I1
03/04/2025
Signed off — Alteration
EXIST. 2 STORY W/ CELLAR, PRPO. REMOVE ILLEGAL PARTITIONS, SHOWER, RESIDENTIAL SINK AND GAS STOVE IN THE CELLAR AND TO RESOLVE ECB VIOLATIONS # 34571325Z AND 34571326K. INSTALL NEW STUCCO FINISH, REPAIR EXIST. EXTERIOR CONCRETE STEPS, NO CHANGE IN BULK
Q00830924-I1
02/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/10/2025
Signed off — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00830924. CAP AND REMOVE ILLEGAL GAS LINE FOR STOVE, WATER, AND WASTE WATER LINE IN THE CELLAR, RESOLVE ECB VIOLATION # 34571325Z AND 34571326K
Q00830933-I1
12/02/2024
Violation issued (HPD, closed)
I
08/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
07/27/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00830924. CAP AND REMOVE ILLEGAL GAS LINE FOR STOVE, WATER, AND WASTE WATER LINE IN THE CELLAR, RESOLVE ECB VIOLATION # 34571325Z AND 34571326K
Q00830933-P3
07/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
06/06/2024
Permit issued — General Construction
Q00830924-I1-GC
05/01/2024
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
05/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PIROOZ SOLTANIZADEH
05/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
05/01/2024
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
05/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
04/26/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00830924. CAP AND REMOVE ILLEGAL GAS LINE FOR STOVE, WATER, AND WASTE WATER LINE IN THE CELLAR, RESOLVE ECB VIOLATION # 34571325Z AND 34571326K
Q00830933-P2
04/26/2024
Filed — Alteration
EXIST. 2 STORY W/ CELLAR, PRPO. REMOVE ILLEGAL PARTITIONS, SHOWER, RESIDENTIAL SINK AND GAS STOVE IN THE CELLAR AND TO RESOLVE ECB VIOLATIONS # 34571325Z AND 34571326K. INSTALL NEW STUCCO FINISH, REPAIR EXIST. EXTERIOR CONCRETE STEPS, NO CHANGE IN BULK
Q00830924-P2
04/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
04/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PIROOZ SOLTANIZADEH
04/24/2024
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
04/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
04/24/2024
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
04/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
04/15/2024
Violation issued (HPD, closed)
A
03/11/2024
Permit issued — Plumbing
Q00830933-I1-PL
02/28/2024
Objection resolved — Addressed
02/23/2024
Objection raised — Scope
02/21/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00830924. CAP AND REMOVE ILLEGAL GAS LINE FOR STOVE, WATER, AND WASTE WATER LINE IN THE CELLAR, RESOLVE ECB VIOLATION # 34571325Z AND 34571326K
Q00830933-P1
02/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/29/2023
Objection resolved — Addressed
12/29/2023
Objection resolved — Addressed
12/15/2023
Objection raised — Scope
12/12/2023
Objection raised — Scope
12/04/2023
Filed — Alteration
EXIST. 2 STORY W/ CELLAR, PRPO. REMOVE ILLEGAL PARTITIONS, SHOWER, RESIDENTIAL SINK AND GAS STOVE IN THE CELLAR AND TO RESOLVE ECB VIOLATIONS # 34571325Z AND 34571326K. INSTALL NEW STUCCO FINISH, REPAIR EXIST. EXTERIOR CONCRETE STEPS, NO CHANGE IN BULK
Q00830924-P1
12/04/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
PIROOZ SOLTANIZADEH
12/04/2023
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
12/04/2023
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
12/04/2023
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
06/14/2023
Permit issued — Construction Fence
Q00830938-I1-FN
05/26/2023
Permit issued — General Construction
Q00830924-I1-GC
04/07/2023
Objection resolved — Addressed
04/04/2023
Objection raised — Scope
03/31/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00830924
Q00830938-I1
03/31/2023
Filed — Alteration
EXIST. 2 STORY W/ CELLAR, PRPO. REMOVE ILLEGAL PARTITIONS, SHOWER, RESIDENTIAL SINK AND GAS STOVE IN THE CELLAR AND TO RESOLVE ECB VIOLATIONS # 34571325Z AND 34571326K. INSTALL NEW STUCCO FINISH, REPAIR EXIST. EXTERIOR CONCRETE STEPS, NO CHANGE IN BULK
Q00830924-I1
03/31/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00830924. CAP AND REMOVE ILLEGAL GAS LINE FOR STOVE, WATER, AND WASTE WATER LINE IN THE CELLAR, RESOLVE ECB VIOLATION # 34571325Z AND 34571326K
Q00830933-I1
03/28/2023
Violation issued (HPD, closed)
A
03/03/2022
Violation issued (HPD, closed)
I
03/03/2022
Violation issued (HPD, closed)
A
04/14/2021
Violation issued (HPD, closed)
A
04/14/2021
Violation issued (HPD, closed)
I
11/01/2019
Violation issued (HPD, closed)
I
10/23/2018
Violation issued (HPD, closed)
I
11/17/2016
Violation issued (HPD, closed)
I
02/26/2015
Violation issued (HPD, closed)
I
04/14/2007
Violation issued (ECB, open)
Quality of Life
04/14/2007
Violation issued (ECB, open)
Quality of Life
10/28/2005
Violation issued (ECB, closed)
Quality of Life
10/28/2005
Violation issued (ECB, closed)
Unknown
07/12/2005
Violation issued (HPD, open)
B
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offOMEGA STUCCO CORP06/06/2024
DOB NOWPlumbingSigned-offPLBG P & H INC03/11/2024
DOB NOWConstruction FenceSigned-offOMEGA STUCCO CORP06/14/2023
DOB NOWGeneral ConstructionSigned-offOMEGA STUCCO CORP05/26/2023
1 project · most recent 01/06/2024
FiledStatusContractorScope
01/06/2024CompleteE D ELECTRICAL INC5 meters, 5 new_meters
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
08/08/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
07/27/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
05/01/2024PreliminaryPIROOZ SOLTANIZADEHprogress
05/01/2024Structural Stability – Alterations of existing buildingsPIROOZ SOLTANIZADEHspecial
05/01/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
05/01/2024Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
05/01/2024Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
04/24/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
04/24/2024Structural Stability – Alterations of existing buildingsPIROOZ SOLTANIZADEHspecial
04/24/2024Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
04/24/2024Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
04/24/2024PreliminaryPIROOZ SOLTANIZADEHprogress
04/24/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
02/20/2024Fire-Resistant Penetrations and Joints—special
12/04/2023Structural Stability – Alterations of existing buildingsPIROOZ SOLTANIZADEHspecial
12/04/2023Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
12/04/2023Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
12/04/2023PreliminaryPIROOZ SOLTANIZADEHprogress
12/04/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026Q00830938-I1Request digital key ↗
08/23/2026Q00830933-I1Request digital key ↗
08/23/2026Q00830933-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026Q00830933-I1Open ↗
08/23/2026Q00830933-P2Open ↗
08/23/2026Q00830933-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00830924-I1Open ↗
08/29/2026Q00830933-I1Open ↗
08/28/2026Q00830933-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q00830924-I1Open ↗
08/25/2026Q00830924-P2Open ↗
08/25/2026Q00830924-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026Q00830933-P2Open ↗
08/23/2026Q00830933-P3Open ↗
08/23/2026Q00830933-I1Open ↗
Showing 3 of 7 on file for this type