Elevator apt, semi-fireproof with stores
44 COMMERCIAL STREET
BROOKLYN · BIN 3429914
💬 Discuss this project
2024Year Built
5Stories
D7Building Class
M1-2/R6Zoning
42,786 sfGross Floor Area
13Units
0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: RIMANI REALTY LLC · 12,300 sf lot · 3.48 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction56p · 1 filing · 20 docs
Floor 5Under Construction59p · 1 filing · 20 docs
Floor 4Under Construction51p · 1 filing · 20 docs
Floor 3Under Construction55p · 1 filing · 20 docs
Floor 2Under Construction57p · 1 filing · 20 docs
Floor 1Under Construction58p · 1 filing · 20 docs
CellarUnder Construction23p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY804/09/2026
RIMANI GROUP1003/22/2026
RIMANI REALTY703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
T.F. CUSANELLI & FILLETTI ARCH1507/22/2026
ASHRAF CORP203/15/2025
EJC ENGINEERING, PLLC303/14/2025
LANGAN ENGINEERING, ENVIRONMENTAL,104/18/2024
SH ENGINEERING PLLC503/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
T F CUSANELLI FILLETTI ARCHITECT803/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARISTA PLBG & HTG CORPPlumbing2607/08/2026
RIMANI GROUP INCGeneral Contractor2007/08/2026
ALL STATE 12 GENERAL CONTRACTINGGeneral Contractor307/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor304/09/2026
DDS MECHANICAL FPS CORPFire Protection205/29/2026
SAFETY PLMBG & HTG LLCPlumbing203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171807/22/2026
TRIANGLE INSPECTION & TES7495303/21/2024
Building Lifecycle
All (189)Filed (25)Permit Issued (24)Signed Off (10)Violation (12)Inspection (7)Objection (78)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
08/19/2026
Special inspection requirement — Interior lighting power
Maxim Korngold
08/19/2026
Special inspection requirement — Subgrade Inspections
Maxim Korngold
08/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
Maxim Korngold
08/19/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Maxim Korngold
08/19/2026
Special inspection requirement — Protection of exposed foundation insulation
Maxim Korngold
08/19/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MIKHAIL ZEYGMAN
08/19/2026
Special inspection requirement — Concrete - Cast-In-Place
Maxim Korngold
08/19/2026
Special inspection requirement — Masonry
Maxim Korngold
08/19/2026
Special inspection requirement — Preliminary
Maxim Korngold
08/19/2026
Special inspection requirement — Lighting controls
Maxim Korngold
08/19/2026
Special inspection requirement — Air barrier - visual inspection
Maxim Korngold
08/19/2026
Special inspection requirement — Metering
Maxim Korngold
08/19/2026
Special inspection requirement — Sprayed fire-resistant materials
Maxim Korngold
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Maxim Korngold
08/19/2026
Special inspection requirement — Lighting in dwelling units
Maxim Korngold
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Maxim Korngold
08/19/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Maxim Korngold
08/19/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Maxim Korngold
08/19/2026
Special inspection requirement — Air barrier — testing
Maxim Korngold
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Maxim Korngold
08/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Maxim Korngold
08/19/2026
Special inspection requirement — Fenestration air leakage
Maxim Korngold
08/19/2026
Special inspection requirement — Exterior lighting power
Maxim Korngold
08/19/2026
Special inspection requirement — Insulation placement and R values
Maxim Korngold
08/19/2026
Special inspection requirement — Fenestration areas
Maxim Korngold
08/19/2026
Special inspection requirement — Electrical motors and elevators
Maxim Korngold
08/19/2026
Special inspection requirement — Maintenance information
Maxim Korngold
07/22/2026
Filed — New Building
Mechanical work filed in conjunction with NB B00596151
B00596151-A5
07/01/2026
Permit issued — General Construction
B00596151-Z4-GC
04/21/2026
Permit issued — Curb Cut
B00596151-S7-CC
04/21/2026
Violation issued (ECB, closed)
Construction
04/21/2026
Violation issued (ECB, closed)
Construction
04/09/2026
Signed off — New Building
Mechanical work filed in conjunction with NB B00596151
B00596151-Z3
04/08/2026
Filed — New Building
Mechanical work filed in conjunction with NB B00596151
B00596151-A4
03/30/2026
Filed — New Building
Mechanical work filed in conjunction with NB B00596151
B00596151-A3
03/30/2026
Permit issued — Construction Fence
B00596151-Z3-FN
03/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2026
Special inspection requirement — Concrete - Cast-In-Place
MIKHAIL ZEYGMAN
03/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
MIKHAIL ZEYGMAN
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
03/26/2026
Signed off — New Building
Mechanical work filed in conjunction with NB B00596151
B00596151-S9
03/19/2026
Objection raised — Other
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection raised — Zoning
03/19/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Other
03/18/2026
Objection resolved — Addressed
03/17/2026
Filed — New Building
Mechanical work filed in conjunction with NB B00596151
B00596151-A2
03/16/2026
Signed off — New Building
Mechanical work filed in conjunction with NB B00596151
B00596151-Z1
03/11/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01080977-I1
02/17/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/13/2026
Permit issued — General Construction
B00596151-I1-GC
02/04/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/04/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
01/06/2026
Objection raised — Structural
01/06/2026
Objection raised — Admin
12/24/2025
Filed — New Building
Mechanical work filed in conjunction with NB B00596151
B00596151-A1
11/07/2025
Signed off — Alteration
PROPOSE UNDERPINNING WORK OF ADJACENT FOOTING IN CONJUNCTION WITH G/C FILING # 321387995
B00732916-I1
11/06/2025
Signed off — Alteration
PROPOSE UNDERPINNING WORK OF ADJACENT FOOTING IN CONJUNCTION WITH G/C FILING # 321387995
B00732916-S1
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRIMANI GROUP INC07/01/2026
DOB NOWCurb CutPermit IssuedRIMANI GROUP INC04/21/2026
DOB NOWConstruction FenceSigned-offRIMANI GROUP INC03/30/2026
DOB NOWGeneral ConstructionPermit IssuedRIMANI GROUP INC02/13/2026
DOB NOWGeneral ConstructionPermit IssuedRIMANI GROUP INC10/29/2025
DOB NOWMechanical SystemsSigned-offRIMANI GROUP INC10/27/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC08/18/2025
DOB NOWGeneral ConstructionPermit IssuedRIMANI GROUP INC07/16/2025
DOB NOWStandpipeSigned-offARISTA PLBG & HTG CORP05/23/2025
DOB NOWPlumbingSigned-offDDS MECHANICAL FPS CORP05/23/2025
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP05/23/2025
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC03/21/2025
DOB NOWConstruction FenceSigned-offRIMANI GROUP INC03/05/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC08/12/2024
DOB NOWStructuralSigned-offRIMANI GROUP INC08/09/2024
DOB NOWGeneral ConstructionPermit IssuedRIMANI GROUP INC08/02/2024
DOB NOWSprinklersSigned-offARISTA PLBG & HTG CORP06/12/2024
DOB NOWEarth WorkPermit IssuedRIMANI GROUP INC06/04/2024
DOB NOWFoundationSigned-offRIMANI GROUP INC05/07/2024
DOB NOWSupport of ExcavationSigned-offRIMANI GROUP INC03/20/2024
DOB NOWConstruction FenceSigned-offRIMANI GROUP INC02/28/2024
DOB NOWFoundationPermit IssuedALL STATE 12 GENERAL CONT06/11/2022
DOB NOWSupport of ExcavationSigned-offALL STATE 12 GENERAL CONT06/09/2022
DOB NOWConstruction FenceSigned-offALL STATE 12 GENERAL CONT05/28/2022
1 project · most recent 07/22/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/22/2026Permit IssuedRIMANI GROUP INCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ2 36,000 BTU · Condensing Unit ×20
SUZ-KA24NAHZ 22,000 BTU · Condensing Unit ×12
Model#PURY-EP120TNV-A1 240,000 BTU · Vrf Outdoor ×1
Model3PURY-EP120TNU-A1 96,000 BTU · Vrf Outdoor ×1
PUHY-HP96TNU-A1 24,000 BTU · Vrf Outdoor ×1
Heating
Indeeco WLI 934U02000C 5,110 BTU · Electric Heater ×11
WLI 934U02000V 8,553 BTU · Electric Heater ×6
Ventilation
Greenheck ERV-10-20L-VG 400 CFM · Erv ×1
1 project · most recent 07/22/2026
Sprinkler System
FiledStatusContractorScope
07/22/2026Signed-offDDS MECHANICAL FPS CORPSprinkler System
1 project · most recent 07/22/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/22/2026Signed-offARISTA PLBG & HTG CORPStorm, Water/Sanitary
3 projects · most recent 02/12/2025
General Wiring
FiledStatusContractorScope
02/12/2025CompleteNION ELECTRIC CORPGeneral Wiring
09/26/2024CompleteTF ELECTRICAL CORPGeneral Wiring
07/22/2024CompleteILLUMINOUS ELECTRIC CORP.—
1 project · most recent 07/22/2026
Steel Concrete Masonry
FiledStatusContractorScope
07/22/2026Permit IssuedRIMANI GROUP INCSteel, Concrete, Masonry
1 project · most recent 07/22/2026
Fence
FiledStatusContractorScope
07/22/2026Permit IssuedRIMANI GROUP INCFence
1 project · most recent 07/22/2026
Earthwork
FiledStatusContractorScope
07/22/2026Permit IssuedRIMANI GROUP INCEarthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/17/2026Fail-Final CND-Occupancy InspectionFailView ↗
02/04/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/04/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/02/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/19/2026Fenestration and door U-factor and product ratingsMaxim Korngoldenergy_progress
08/19/2026Fenestration air leakageMaxim Korngoldenergy_progress
08/19/2026Lighting controlsMaxim Korngoldenergy_progress
08/19/2026Air barrier — testing Maxim Korngoldenergy_progress
08/19/2026Lighting in dwelling unitsMaxim Korngoldenergy_progress
08/19/2026Exterior lighting powerMaxim Korngoldenergy_progress
08/19/2026Insulation placement and R valuesMaxim Korngoldenergy_progress
08/19/2026Air barrier - visual inspectionMaxim Korngoldenergy_progress
08/19/2026Fenestration areasMaxim Korngoldenergy_progress
08/19/2026Electrical motors and elevatorsMaxim Korngoldenergy_progress
08/19/2026MeteringMaxim Korngoldenergy_progress
08/19/2026Protection of exposed foundation insulationMaxim Korngoldenergy_progress
08/19/2026Maintenance informationMaxim Korngoldenergy_progress
08/19/2026Interior lighting powerMaxim Korngoldenergy_progress
08/19/2026Sprayed fire-resistant materialsMaxim Korngoldspecial
08/19/2026Wall Panels, Curtain Walls, and VeneersMaxim Korngoldspecial
08/19/2026Fire-Resistant Penetrations and JointsMaxim Korngoldspecial
08/19/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMIKHAIL ZEYGMANspecial
08/19/2026Subgrade InspectionsMaxim Korngoldspecial
08/19/2026Structural Stability – Alterations of existing buildingsMaxim Korngoldspecial
08/19/2026Concrete - Cast-In-PlaceMaxim Korngoldspecial
08/19/2026Exterior Insulation and Finish Systems (EIFS)Maxim Korngoldspecial
08/19/2026Mastic and Intumescent Fire-resistant CoatingsMaxim Korngoldspecial
08/19/2026MasonryMaxim Korngoldspecial
08/19/2026Fire-Resistance Rated ConstructionMaxim Korngoldprogress
Latest 25 of 150.
▾Documents — 343 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/29/2026B00733037-I1Request digital key ↗
08/29/2026B00732916-P2Request digital key ↗
08/29/2026B00732916-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits8
▸DOB NOWDEP Stormwater Construction Permit3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
02/04/2026322123493Open ↗
09/12/2023340899754Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
03/05/2024340899754Open ↗
03/05/2024340899754Open ↗
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZoning Exhibit form (1-5)6
08/17/2026B00596151-A5Open ↗
08/17/2026B00596151-A3Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram6
08/17/2026B00596151-A3Open ↗
08/17/2026B00596151-A5Open ↗
Showing 2 of 6 on file for this type
▸Seals & Professional Certifications161
▸DOB NOWProgress Inspector Seal & Signature71
09/30/2026B00596151-S5Open ↗
09/23/2026B00596151-I1Open ↗
09/01/2026B00596151-Z1Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature62
09/30/2026B00596151-S5Open ↗
09/30/2026B00596151-S5Open ↗
09/30/2026B00596151-S5Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/29/2026B00732916-S1Open ↗
08/29/2026B00732916-P1Open ↗
08/29/2026B00732916-P2Open ↗
Showing 3 of 26 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/12/2023340899754Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/12/2023340899754Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/17/2026B00596151-A3Open ↗
Showing 1 of 6 on file for this type
▸Safety & Tenant Protection26
▸DOB NOWHPD-1: Anti-Harassment Area Checklist14
08/29/2026B00732916-S1Open ↗
08/29/2026B00732916-I1Open ↗
08/17/2026B00596151-A3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWStreet Tree Checklist7
08/17/2026B00596151-A5Open ↗
08/17/2026B00596151-A3Open ↗
08/15/2026B00596151-P6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
09/12/2023340899754Open ↗
▸BISSTREET TREE CHECKLIST1
03/05/2024340899754Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos42
▸DOB NOWOER: Notice to Proceed25
08/29/2026B00732916-P2Open ↗
08/29/2026B00732916-I1Open ↗
08/29/2026B00732916-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWOER: Notice of Satisfaction16
08/29/2026B00732916-S1Open ↗
08/29/2026B00732916-I1Open ↗
08/29/2026B00732916-I1Open ↗
Showing 3 of 16 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
09/12/2023340899754Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports15
▸DOB NOWSOIL REPORT8
08/29/2026B00732916-P2Open ↗
08/29/2026B00732916-I1Open ↗
08/29/2026B00732916-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram4
08/29/2026B00732916-I1Open ↗
08/29/2026B00732916-S1Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWTR5 Test Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION1
03/05/2024340899754Open ↗
▸BISBOROUGH INTAKE FORM1
02/04/2026322123493Open ↗
▸BISEFILING COVER SHEET1
02/04/2026322123493Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/12/2023340899754Open ↗
▸Other Documents42
▸DOB NOWSite Survey: Initial7
08/17/2026B00596151-A3Open ↗
08/17/2026B00596151-A5Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation7
08/17/2026B00596151-A4Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/17/2026B00596151-A5Open ↗
08/17/2026B00596151-A3Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board7
08/17/2026B00596151-A4Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWProperty Ownership Certification6
08/17/2026B00596151-A3Open ↗
08/17/2026B00596151-A5Open ↗
08/15/2026B00596151-P6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification3
08/29/2026B00732916-I1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWWaiver Document2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWGeotechnical Peer Review Report (BC 1818)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type