Condo, residential tower (mixed-use, multi-family elevator) [derived]
44 East 67th Street Condominium
44 EAST 67 STREET · BIN 1076286
💬 Discuss this project
1941Year Built
13Stories
RMBuilding Class
R8BZoning
60,242 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized76 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 8,033 sf lot · 7.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 3 filings · 20 docs
PenthouseUnder Construction17p · 2 filings · 20 docs
Floor 13Under Construction5p · 2 filings · 15 docs
Floor 1212p · 1 filing · 20 docs
Floor 1113p · 2 filings · 20 docs
Floor 10Under Construction17p · 2 filings · 20 docs
Floor 9Under Construction15p · 1 filing · 6 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Under Construction12p · 2 filings · 20 docs
Floor 2
Floor 1
Cellar2p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL SYSTEMS903/22/2026
MICHAEL SCERBO 1103/22/2026
KANARIS CONTRACTING103/22/2026
OWNER OF 44 EAST 67 ST103/22/2026
RIVER BANK AMERICATES103/22/2026
AUGUST CONSTRUCTION GROUP103/22/2026
44 EAST 67 ST. CONDOMINIUM3003/21/2026
MAXWELL KATES603/21/2026
HARLEY 67TH STREET GROUP LLC C O403/21/2026
44 EAST 67TH STREET303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOUTH PACIFIC GENERALGeneral Contractor2707/08/2026
WYNNE PLBG & HEATING CORPPlumbing507/08/2026
KANARIS CONTRACTING CORPGeneral Contractor407/08/2026
LCS RESTORATION CORPGeneral Contractor303/21/2026
PNA CONTRACTING CORPGeneral Contractor307/08/2026
STEEL SYSTEMS LLCGeneral Contractor303/21/2026
REYES ENTERPRISE, INCGeneral Contractor207/08/2026
M&M PLUMBING & HEATING INPlumbing207/08/2026
UNITED ELITE GROUP INCGeneral Contractor203/21/2026
NU-WAY HEATING & COOLINGGeneral Contractor203/21/2026
BARMOR REHAB INCElectrical103/21/2026
ALAN E. ROSENBERG, INC.Plumbing107/08/2026
CITY GAS HTG SVC CO INCPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
LRL CONSTRUCTION INCGeneral Contractor107/08/2026
BENJAMIN DREBINElectrical103/21/2026
FRIEDMAN, LASZLOElectrical103/21/2026
JESUS CORPORANElectrical103/21/2026
LEONARD, JOSEPHElectrical103/21/2026
PRINCIPAL ELECTRICAL CORPElectrical103/22/2026
VOVK, YURIIElectrical103/21/2026
CLEARCUT GROUP CORPGeneral Contractor107/08/2026
DUTCHESS CABINETS OF NY *General Contractor104/09/2026
LINK RENOVATIONGeneral Contractor108/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEP INSPECTIONS, INC1102509/08/2026
SH PROJECTS LLC4144204/09/2026
INM ARCHITECT, P.C.3351110/26/2025
CROSSCHECK INSPECTION SER544803/20/2025
ANJIE CHO ARCHITECT3954210/07/2024
VINCENT J. LIOTTA P. E.1974210/07/2024
CHEN ENGINEERING SERVICES1826104/29/2024
JOSEPH K. BLUM CO. LLP1741111/03/2023
DOMANI INSPECTION SERVICE843111/01/2023
IDA GALEA, ARCHITECT838207/28/2023
Building Lifecycle
All (300)Filed (45)Permit Issued (37)Signed Off (16)Facade (FISP) (9)Violation (55)Inspection (28)Objection (80)Special Inspection (30)
09/11/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
09/08/2026
Filed — Alteration
Combination and Renovation of two existing apartments. Window and door replacement proposed. Lower sills of three windows and combine two existing windows into one bay window. There will be no change to use, occupancy and egress.
M00956626-P2
09/01/2026
Special inspection requirement — Final
Nicolas Crosetto
09/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
09/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/06/2026
Permit issued — General Construction
M01437590-I1-GC
07/31/2026
Filed — Alteration
Renovation of an existing duplex apartment. Work includes new kitchen, bathrooms finishes and fixtures,
M01437590-I1
07/28/2026
Special inspection requirement — Final
MICHAEL RODRIGUEZ
07/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL RODRIGUEZ
07/06/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/22/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/02/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 3A ON THE 003 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01264447-S2
05/22/2026
Special inspection requirement — Final
Ryan Churchward
05/22/2026
Special inspection requirement — Post-installed Anchors
DAVID HOFMANN
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID HOFMANN
05/06/2026
Violation issued (HPD, open)
B
05/06/2026
Violation issued (HPD, closed)
C
05/06/2026
Violation issued (HPD, open)
B
04/30/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/09/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 3A ON THE 003 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01264447-P2
04/09/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 3A ON THE 003 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01264447-P1
03/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/19/2026
Special inspection requirement — Post-installed Anchors
DAVID HOFMANN
03/19/2026
Special inspection requirement — Final
Ryan Churchward
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID HOFMANN
03/03/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/11/2026
Signed off — Alteration
THE PROPOSED SCOPE OF WORK IS FOR FLOOR REPLACEMENT AT THE 11D & 11E TERRACES ONLY. NO INTERIOR WORK OR CHANGE IN OCCUPANCY, USE OR EGRESS.
M01280066-I1
01/23/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/21/2026
Permit issued — Plumbing
M01264447-S1-PL
01/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2026
Permit issued — General Construction
M01264447-I1-GC
01/06/2026
Permit issued — General Construction
M01280066-I1-GC
12/01/2025
Permit issued — Mechanical Systems
M00956641-I1-MS
12/01/2025
Permit issued — General Construction
M00956626-I1-GC
12/01/2025
Permit issued — Structural
M01002757-I1-ST
11/21/2025
Signed off — Alteration
Plumbing Modifications to unit 11D as indicated on the plans. No change to use, egress or occupancy.
M00513164-I1
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/10/2025
Objection raised — Scope
11/10/2025
Objection raised — Admin
11/10/2025
Objection raised — Cost
11/10/2025
Objection raised — Admin
10/26/2025
Filed — Alteration
THE PROPOSED SCOPE OF WORK IS FOR FLOOR REPLACEMENT AT THE 11D & 11E TERRACES ONLY. NO INTERIOR WORK OR CHANGE IN OCCUPANCY, USE OR EGRESS.
M01280066-I1
10/24/2025
Special inspection requirement — Final
Nikola Martinovic
10/24/2025
Special inspection requirement — Insulation placement and R values
Nikola Martinovic
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nikola Martinovic
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Nikola Martinovic
10/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
Nikola Martinovic
09/17/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 3A ON THE 003 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01264447-S1
09/17/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 3A ON THE 003 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01264447-I1
09/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Nicolas Crosetto
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
09/11/2025
Special inspection requirement — Final
Nicolas Crosetto
09/05/2025
Objection raised — Admin
09/05/2025
Objection resolved — Addressed
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLINK RENOVATION08/06/2026
DOB NOWPlumbingPermit IssuedCITY GAS HTG SVC CO INC01/21/2026
DOB NOWGeneral ConstructionPermit IssuedDUTCHESS CABINETS OF NY *01/12/2026
DOB NOWGeneral ConstructionSigned-offLCS RESTORATION CORP01/06/2026
DOB NOWMechanical SystemsPermit IssuedSOUTH PACIFIC GENERAL12/01/2025
DOB NOWGeneral ConstructionPermit IssuedSOUTH PACIFIC GENERAL12/01/2025
DOB NOWStructuralPermit IssuedSOUTH PACIFIC GENERAL12/01/2025
DOB NOWGeneral ConstructionSigned-offCLEARCUT GROUP CORP08/08/2025
DOB NOWPlumbingSigned-offWYNNE PLBG & HEATING CORP01/24/2025
DOB NOWPlumbingPermit IssuedWYNNE PLBG & HEATING CORP12/20/2024
DOB NOWMechanical SystemsPermit IssuedSOUTH PACIFIC GENERAL12/16/2024
DOB NOWStructuralPermit IssuedSOUTH PACIFIC GENERAL12/16/2024
DOB NOWGeneral ConstructionPermit IssuedSOUTH PACIFIC GENERAL12/12/2024
DOB NOWGeneral ConstructionPermit IssuedPNA CONTRACTING CORP11/21/2024
DOB NOWStructuralSigned-offSOUTH PACIFIC GENERAL11/14/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC09/19/2024
DOB NOWGeneral ConstructionPermit IssuedSOUTH PACIFIC GENERAL09/06/2024
DOB NOWGeneral ConstructionSigned-offUNITED ELITE GROUP INC08/29/2024
DOB NOWMechanical SystemsSigned-offSOUTH PACIFIC GENERAL07/15/2024
DOB NOWGeneral ConstructionSigned-offSOUTH PACIFIC GENERAL07/15/2024
DOB NOWGeneral ConstructionSigned-offKANARIS CONTRACTING CORP05/15/2024
DOB NOWGeneral ConstructionSigned-offKANARIS CONTRACTING CORP05/15/2024
DOB NOWGeneral ConstructionSigned-offSOUTH PACIFIC GENERAL03/28/2024
DOB NOWSuspended ScaffoldPermit IssuedPNA CONTRACTING CORP01/26/2024
DOB NOWPlumbingSigned-offM&M PLUMBING & HEATING IN10/05/2023
DOB NOWGeneral ConstructionSigned-offKANARIS CONTRACTING CORP08/29/2023
DOB NOWGeneral ConstructionPermit IssuedPNA CONTRACTING CORP08/09/2023
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC06/28/2023
DOB NOWPlumbingSigned-offWYNNE PLBG & HEATING CORP03/21/2023
DOB NOWPlumbingSigned-offM&M PLUMBING & HEATING IN03/17/2023
DOB NOWGeneral ConstructionSigned-offSOUTH PACIFIC GENERAL03/06/2023
DOB NOWGeneral ConstructionSigned-offLRL CONSTRUCTION INC03/18/2022
DOB NOWMechanical SystemsSigned-offNU-WAY HEATING & COOLING03/11/2022
DOB NOWGeneral ConstructionSigned-offSOUTH PACIFIC GENERAL02/24/2022
DOB NOWPlumbingSigned-offALAN E. ROSENBERG, INC.08/25/2020
DOB NOWMechanical SystemsSigned-offREYES ENTERPRISE, INC12/17/2019
DOB NOWStructuralSigned-offREYES ENTERPRISE, INC12/17/2019
BISPLISSUEDFIVE STAR P AND H CO, INC05/10/2022
BISOTISSUEDALPET BUILDING & REMODELING10/27/2020
BISOTISSUEDAUGUST CONSTRUCTION GROUP08/20/2020
+ 47 more permits on file
1 project · most recent 11/03/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/03/2023Signed-offSOUTH PACIFIC GENERALHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZSM48 1 BTU · Heat Pump Outdoor ×1
2 projects · most recent 06/02/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/02/2026Permit IssuedCITY GAS HTG SVC CO INCWater/Sanitary
03/13/2025——Gas, Water/Sanitary
17 projects · most recent 08/10/2026
General Wiring
FiledStatusContractorScope
08/10/2026Permit IssuedAKAY ELECTRIC CORPORATIONGeneral Wiring
01/30/2026CompleteBNH ELECTRICAL CORP—
01/27/2026Permit IssuedACCURATE ELEC'L CORP.General Wiring
10/30/2025CompleteEMPIRE LIC ELECL CONTRS51 meters, 50 new_meters
08/11/2025CompleteACCURATE ELEC'L CORP.General Wiring
05/28/2025Permit IssuedACCURATE ELEC'L CORP.46 meters, 1 new_meters
01/05/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
07/24/2024Permit IssuedFALCO ELEC'L SERVICES INCGeneral Wiring
12/11/2023CompleteIKAROS ELECTRICAL ENT INCGeneral Wiring
06/20/2023CompleteTOP SHELF ELECTRIC CORP—
02/23/2023CompleteACCURATE ELEC'L CORP.General Wiring
10/07/2022CompleteCENTENNIAL ELEVATOR INDUSGeneral Wiring
03/02/2022CompleteACCURATE ELEC'L CORP.General Wiring
03/10/2021CompletePRINCIPAL ELECTRICAL CORP1 meters
11/10/2020CompleteCENTENNIAL ELEVATOR INDUSGeneral Wiring
3 projects · most recent 06/02/2026
Steel Masonry Concrete
FiledStatusContractorScope
06/02/2026Permit IssuedCITY GAS HTG SVC CO INCSteel
08/09/2024Permit IssuedSOUTH PACIFIC GENERALSteel, Concrete, Masonry
11/03/2023Signed-offSOUTH PACIFIC GENERALSteel, Masonry
▾Field Inspections (DOB CAP) — 28
DateTypeResultReport
09/11/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/06/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/22/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
06/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/20/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/03/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/23/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 28.
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
09/01/2026FinalNicolas Crosettoprogress
09/01/2026Tenant Protection Plan Compliance—special
09/01/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
07/28/2026Fire-Resistance Rated ConstructionMICHAEL RODRIGUEZprogress
07/28/2026FinalMICHAEL RODRIGUEZprogress
05/22/2026Post-installed AnchorsDAVID HOFMANNspecial
05/22/2026Fire-Resistant Penetrations and JointsDAVID HOFMANNspecial
05/22/2026FinalRyan Churchwardprogress
03/19/2026Post-installed AnchorsDAVID HOFMANNspecial
03/19/2026FinalRyan Churchwardprogress
03/19/2026Fire-Resistant Penetrations and JointsDAVID HOFMANNspecial
10/24/2025Insulation placement and R valuesNikola Martinovicenergy_progress
10/24/2025Energy Code Compliance InspectionsNikola Martinovicprogress
10/24/2025Tenant Protection Plan ComplianceNikola Martinovicspecial
10/24/2025Fire-Resistant Penetrations and JointsNikola Martinovicspecial
10/24/2025FinalNikola Martinovicprogress
09/11/2025FinalNicolas Crosettoprogress
09/11/2025Tenant Protection Plan ComplianceNicolas Crosettospecial
09/11/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
08/14/2025Tenant Protection Plan Compliance—special
08/14/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
08/14/2025FinalNicolas Crosettoprogress
04/30/2025FinalAngelos Georgopoulosprogress
04/09/2025Maintenance informationFRANCISCO SANCHEZenergy_progress
04/09/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
Latest 25 of 92.
▾Documents — 735 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch39
09/01/2026M00729079-I1Request digital key ↗
08/30/2026M00884861-I1Request digital key ↗
08/30/2026M00894167-I1Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00451872-I1Request digital key ↗
09/03/2026M00451872-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00309616-I1Request digital key ↗
08/15/2026M00276675-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00272887-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00272849-I1Request digital key ↗
▸Applications & Permits160
▸BISPLAN / WORK APPROVAL APPLICATION64
12/11/2024103745707Open ↗
05/26/2022104714560Open ↗
04/06/2022104714560Open ↗
Showing 3 of 64 on file for this type
▸BISWORK PERMIT APPLICATION52
05/11/2022104714560Open ↗
10/27/2020140914492Open ↗
08/03/2020140925694Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWLPC Approval/Permit40
09/27/2026M00956626-P2Open ↗
09/05/2026M00272849-I1Open ↗
08/29/2026M00513192-P1Open ↗
Showing 3 of 40 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
07/30/2020140925694Open ↗
07/30/2020140925694Open ↗
07/30/2020140925694Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications204
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION56
03/20/2020122549144Open ↗
03/20/2020122549144Open ↗
03/20/2020122549144Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature45
09/27/2026M00956626-P2Open ↗
09/05/2026M00272849-I1Open ↗
09/01/2026M00729079-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWProgress Inspector Seal & Signature45
09/29/2026M00898671-I1Open ↗
09/29/2026M00898671-I1Open ↗
09/27/2026M00956626-P2Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/29/2026M00898671-I1Open ↗
09/27/2026M00956626-P2Open ↗
09/18/2026M00513192-S1Open ↗
Showing 3 of 38 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
04/21/2016122747698Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
08/01/2016140520407Open ↗
04/21/2016122747698Open ↗
04/21/2016122747698Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/31/2020140914492Open ↗
07/20/2020140925694Open ↗
08/01/2016140520407Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/31/2020140914492Open ↗
07/20/2020140925694Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/01/2016140520407Open ↗
▸Trade Schedules & Equipment39
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING12
05/26/2022104714560Open ↗
Showing 1 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
10/18/2017122549144Open ↗
04/21/2016122747698Open ↗
Showing 2 of 8 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
07/30/2020140925694Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection12
▸BISTENANT PROTECTION PLAN AND NOTES7
04/27/2022104714560Open ↗
07/30/2020140925694Open ↗
07/30/2020140925694Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00272849-I1Open ↗
Showing 1 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos66
▸DOB NOWDEP ACP-5: Asbestos Assessment Report42
09/27/2026M00956626-P2Open ↗
09/05/2026M00272849-I1Open ↗
09/01/2026M00729079-I1Open ↗
Showing 3 of 42 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
08/31/2020140914492Open ↗
07/30/2020140925694Open ↗
07/20/2020140925694Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
08/08/2016122816621Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
03/20/2020122549144Open ↗
03/20/2020122549144Open ↗
05/17/2017122816621Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
03/23/2022121932800Open ↗
04/22/2021140925694Open ↗
03/20/2020122549144Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/23/2022121932800Open ↗
04/27/2021140925694Open ↗
04/27/2021140925694Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/01/2016140520407Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
04/05/2022104714560Open ↗
04/05/2022104714560Open ↗
03/23/2022121932800Open ↗
Showing 3 of 10 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/05/2022104714560Open ↗
▸Approvals, Objections & Sign-offs55
▸BISLANDMARKS APPROVAL24
08/31/2020140914492Open ↗
07/20/2020140925694Open ↗
02/27/2019123250891Open ↗
Showing 3 of 24 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
06/02/2022104714560Open ↗
04/27/2021140925694Open ↗
03/20/2020122549144Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/11/2022104714560Open ↗
05/11/2022104714560Open ↗
03/31/2022121932800Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS SIGNOFF2
04/06/2022104714560Open ↗
04/22/2021140925694Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
03/23/2022121932800Open ↗
▸Cost, Insurance & Ownership40
▸BISCOST AFFIDAVIT36
03/23/2022121932800Open ↗
04/22/2021140925694Open ↗
08/31/2020140914492Open ↗
Showing 3 of 36 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/03/2022104714560Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
07/30/2020140925694Open ↗
▸Filing & Intake Forms55
▸BISEFILING COVER SHEET18
01/04/2019123250891Open ↗
01/04/2019123250891Open ↗
07/07/2016122816621Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION17
05/27/2022104714560Open ↗
04/09/2021140925694Open ↗
03/31/2021140925694Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM16
05/11/2022104714560Open ↗
04/29/2022104714560Open ↗
03/20/2020122549144Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/31/2020140914492Open ↗
07/20/2020140925694Open ↗
08/01/2016140520407Open ↗
Showing 3 of 4 on file for this type
▸Other Documents19
▸DOB NOWProof of Historic Building10
09/27/2026M00956626-P2Open ↗
08/27/2026M00956651-P1Open ↗
08/17/2026M01264447-P1Open ↗
Showing 3 of 10 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
04/04/2022140914492Open ↗
03/31/2022121932800Open ↗
08/31/2020140914492Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
04/06/2022104714560Open ↗
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type