0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Roof20p · 1 filing · 20 docs
Penthouse17p · 1 filing · 20 docs
Floor 419p · 1 filing · 20 docs
Floor 321p · 1 filing · 20 docs
Floor 221p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Cellar21p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACER CONSTRUCTION103/22/2026
HABITAT ON GARFIELD 1203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/09/2022$3.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC502/17/2025
JIMENEZ BUILDING CONSULTING LLC411/06/2024
JIAN ENGINEERING PLLC312/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor1407/08/2026
ACER CONSTRUCTION INCGeneral Contractor807/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection207/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing207/08/2026
ERIC & NG ELEC'L, INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WELLDONE INSPECTION INC.86281002/17/2025
Building Lifecycle
All (89)Filed (12)Permit Issued (14)Signed Off (4)Violation (1)Inspection (10)Objection (18)Special Inspection (30)
06/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/29/2025
Signed off — Alteration CO
PROPOSED MECHANICAL WORK ON CELLAR, 1st TO 3rd FLOOR, STAIR BULKHEAD & ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B08049525. AS PER PLAN. NO CHANGE USE, EGRESS OR OCCUPANCY.
B08049846-S3
03/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/21/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/17/2025
Filed — Alteration CO
PROPOSED MECHANICAL WORK ON CELLAR, 1st TO 3rd FLOOR, STAIR BULKHEAD & ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B08049525. AS PER PLAN. NO CHANGE USE, EGRESS OR OCCUPANCY.
B08049846-P8
02/09/2025
Signed off — Alteration CO
PROPOSED MECHANICAL WORK ON CELLAR, 1st TO 3rd FLOOR, STAIR BULKHEAD & ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B08049525. AS PER PLAN. NO CHANGE USE, EGRESS OR OCCUPANCY.
B08049846-S1
02/05/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/23/2024
Signed off — Alteration CO
PROPOSED MECHANICAL WORK ON CELLAR, 1st TO 3rd FLOOR, STAIR BULKHEAD & ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B08049525. AS PER PLAN. NO CHANGE USE, EGRESS OR OCCUPANCY.
B08049846-S4
11/27/2024
Objection resolved — Addressed
11/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
QIUFAN JIANG
11/22/2024
Special inspection requirement — Maintenance information
QIUFAN JIANG
11/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
QIUFAN JIANG
11/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
QIUFAN JIANG
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
11/22/2024
Special inspection requirement — Sprinkler Systems
QIUFAN JIANG
11/22/2024
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
11/12/2024
Permit issued — Mechanical Systems
B08049846-S4-MS
11/06/2024
Filed — Alteration CO
PROPOSED MECHANICAL WORK ON CELLAR, 1st TO 3rd FLOOR, STAIR BULKHEAD & ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B08049525. AS PER PLAN. NO CHANGE USE, EGRESS OR OCCUPANCY.
B08049846-P6
10/31/2024
Signed off — Alteration
B00833874-I1
10/30/2024
Objection raised — Other
10/22/2024
Filed — Alteration CO
PROPOSED MECHANICAL WORK ON CELLAR, 1st TO 3rd FLOOR, STAIR BULKHEAD & ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B08049525. AS PER PLAN. NO CHANGE USE, EGRESS OR OCCUPANCY.
B08049846-S4
10/22/2024
Filed — Alteration CO
PROPOSED MECHANICAL WORK ON CELLAR, 1st TO 3rd FLOOR, STAIR BULKHEAD & ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B08049525. AS PER PLAN. NO CHANGE USE, EGRESS OR OCCUPANCY.
B08049846-P7
10/18/2024
Special inspection requirement — Fenestration air leakage
QIUFAN JIANG
10/18/2024
Special inspection requirement — Insulation placement and R values
QIUFAN JIANG
10/18/2024
Special inspection requirement — Lighting in dwelling units
QIUFAN JIANG
10/18/2024
Special inspection requirement — Lighting controls
QIUFAN JIANG
10/18/2024
Special inspection requirement — Exterior lighting power
QIUFAN JIANG
10/18/2024
Special inspection requirement — Fenestration areas
QIUFAN JIANG
10/18/2024
Special inspection requirement — Metering
QIUFAN JIANG
10/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIUFAN JIANG
10/18/2024
Special inspection requirement — Interior lighting power
QIUFAN JIANG
10/18/2024
Special inspection requirement — Concrete - Cast-In-Place
QIUFAN JIANG
10/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
QIUFAN JIANG
10/18/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
QIUFAN JIANG
10/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
10/18/2024
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
10/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
QIUFAN JIANG
10/18/2024
Special inspection requirement — Maintenance information
QIUFAN JIANG
10/18/2024
Special inspection requirement — Air barrier - visual inspection
QIUFAN JIANG
10/09/2024
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
10/09/2024
Special inspection requirement — Sprinkler Systems
QIUFAN JIANG
10/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
QIUFAN JIANG
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
10/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
QIUFAN JIANG
10/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
QIUFAN JIANG
09/12/2024
Violation issued (ECB, closed)
Unknown
09/04/2024
Permit issued — Plumbing
B08049846-S1-EW-SP
09/04/2024
Permit issued — Sprinklers
B08049846-S1-PL
05/14/2024
Permit issued — Construction Fence
B00833874-I1-SH
04/25/2024
Permit issued — General Construction
B08049846-I1-GC
04/24/2024
Permit issued — Construction Fence
B00833874-I1-FN
04/18/2024
Permit issued — General Construction
B08049846-I1-GC
04/01/2024
Permit issued — General Construction
B08049846-I1-GC
02/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/01/2024
Filed — Alteration CO
PROPOSED MECHANICAL WORK ON CELLAR, 1st TO 3rd FLOOR, STAIR BULKHEAD & ROOF. IN CONJUNCTION WITH DOB NOW GC JOB NO:B08049525. AS PER PLAN. NO CHANGE USE, EGRESS OR OCCUPANCY.
B08049846-P5
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offACER CONSTRUCTION INC11/12/2024
DOB NOWPlumbingSigned-offCITYWIDE PLBG, HTG &SPRKL09/04/2024
DOB NOWSprinklersSigned-offCITYWIDE PLBG HTG & SPKLS09/04/2024
DOB NOWConstruction FenceSigned-offACER CONSTRUCTION INC05/14/2024
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC04/25/2024
DOB NOWConstruction FenceSigned-offACER CONSTRUCTION INC04/24/2024
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC04/18/2024
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC04/01/2024
DOB NOWStructuralSigned-offLXC CONSTRUCTION INC09/12/2023
DOB NOWSprinklersSigned-offCITYWIDE PLBG HTG & SPKLS08/16/2023
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL08/16/2023
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC03/03/2023
DOB NOWConstruction FenceSigned-offLXC CONSTRUCTION INC03/02/2023
DOB NOWConstruction FenceSigned-offLXC CONSTRUCTION INC03/02/2023
1 project · most recent 02/17/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/17/2025Signed-offACER CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ-U1 48,000 BTU · Heat Pump Outdoor ×16
MXZ-SM42NAMHZ-U1 42,000 BTU · Heat Pump Outdoor ×4
PUZ-HA24NHA1 24,000 BTU · Heat Pump Outdoor ×4
1 project · most recent 02/17/2025
Sprinkler System
FiledStatusContractorScope
02/17/2025Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 02/17/2025
Storm Water/Sanitary
FiledStatusContractorScope
02/17/2025Signed-offDYNAMIC PLBG & SPRKLR CORStorm, Water/Sanitary
1 project · most recent 03/19/2025
General Wiring
FiledStatusContractorScope
03/19/2025CompleteERIC & NG ELEC'L, INC.General Wiring
1 project · most recent 02/17/2025
Steel Concrete
FiledStatusContractorScope
02/17/2025Signed-offACER CONSTRUCTION INCSteel, Concrete
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/21/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/05/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
11/22/2024Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
11/22/2024HVAC-R and service water piping design and insulationQIUFAN JIANGenergy_progress
11/22/2024Energy Code Compliance InspectionsQIUFAN JIANGprogress
11/22/2024Sprinkler SystemsQIUFAN JIANGspecial
11/22/2024HVAC-R and service water heating equipmentQIUFAN JIANGenergy_progress
11/22/2024HVAC-R and service water heating system controlsQIUFAN JIANGenergy_progress
11/22/2024Maintenance informationQIUFAN JIANGenergy_progress
10/18/2024Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
10/18/2024Construction Operations Influencing Adjacent StructuresQIUFAN JIANGspecial
10/18/2024Concrete - Cast-In-PlaceQIUFAN JIANGspecial
10/18/2024Fenestration air leakageQIUFAN JIANGenergy_progress
10/18/2024Fenestration and door U-factor and product ratingsQIUFAN JIANGenergy_progress
10/18/2024Interior lighting powerQIUFAN JIANGenergy_progress
10/18/2024MeteringQIUFAN JIANGenergy_progress
10/18/2024Fire-Resistance Rated ConstructionQIUFAN JIANGprogress
10/18/2024Energy Code Compliance InspectionsQIUFAN JIANGprogress
10/18/2024Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
10/18/2024Air barrier - visual inspectionQIUFAN JIANGenergy_progress
10/18/2024Maintenance informationQIUFAN JIANGenergy_progress
10/18/2024Insulation placement and R valuesQIUFAN JIANGenergy_progress
10/18/2024Fenestration areasQIUFAN JIANGenergy_progress
10/18/2024Lighting in dwelling unitsQIUFAN JIANGenergy_progress
10/18/2024Lighting controlsQIUFAN JIANGenergy_progress
10/18/2024Exterior lighting powerQIUFAN JIANGenergy_progress
10/09/2024Sprinkler SystemsQIUFAN JIANGspecial
Latest 25 of 70.
▾Documents — 181 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/27/2026B00833874-I1Request digital key ↗
08/23/2026B08049846-S1Request digital key ↗
08/23/2026B08049846-P8Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits4
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
10/15/2024322119364Open ↗
10/11/2024322119364Open ↗
10/11/2024322119364Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/16/2024322119364Open ↗
▸Zoning, Tax Lot & Property Records35
▸DOB NOWRestrictive Declaration/Easement 210
08/23/2026B08049846-S3Open ↗
08/23/2026B08049846-P5Open ↗
08/15/2026B08049846-P7Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWRestrictive Declaration/Easement 110
08/23/2026B08049846-S3Open ↗
08/23/2026B08049846-P5Open ↗
08/15/2026B08049846-P7Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/23/2026B08049846-P5Open ↗
08/15/2026B08049846-P7Open ↗
08/15/2026B08049846-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/23/2026B08049846-P5Open ↗
08/15/2026B08049846-P7Open ↗
08/15/2026B08049846-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/11/2024322119364Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/11/2024322119364Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
10/11/2024322119364Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/11/2024322119364Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B08049846-I1Open ↗
▸Seals & Professional Certifications71
▸DOB NOWProgress Inspector Seal & Signature39
09/18/2026B08049846-P5Open ↗
09/18/2026B08049846-P5Open ↗
09/18/2026B08049846-P5Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/18/2026B08049846-P5Open ↗
09/18/2026B08049846-P5Open ↗
09/18/2026B08049846-P5Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026B00833874-I1Open ↗
08/23/2026B08049846-I1Open ↗
08/23/2026B08049846-S1Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist8
08/23/2026B08049846-S3Open ↗
08/23/2026B08049846-P1Open ↗
08/23/2026B08049846-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/23/2026B08049846-S3Open ↗
08/15/2026B08049846-I1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/23/2026B08049846-S3Open ↗
08/15/2026B08049846-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026B08049846-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/23/2026B08049846-P1Open ↗
08/23/2026B08049846-S1Open ↗
08/23/2026B08049846-S3Open ↗
Showing 3 of 11 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/23/2026B08049846-S3Open ↗
08/13/2026B08049846-P3Open ↗
08/13/2026B08049846-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/23/2026B08049846-S3Open ↗
▸Other Documents31
▸DOB NOWSite Survey: Initial8
08/23/2026B08049846-S3Open ↗
08/23/2026B08049846-P5Open ↗
08/15/2026B08049846-P7Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/23/2026B08049846-S3Open ↗
08/23/2026B08049846-P5Open ↗
08/15/2026B08049846-P7Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlot Diagram8
08/23/2026B08049846-S3Open ↗
08/23/2026B08049846-P5Open ↗
08/15/2026B08049846-P7Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification5
08/23/2026B08049846-P8Open ↗
08/23/2026B08049846-P5Open ↗
08/23/2026B08049846-P2Open ↗
Showing 3 of 5 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
10/15/2024322119364Open ↗
▸DOB NOWFinal Survey1
08/15/2026B08049846-I1Open ↗