← Back
Miscellaneous two family
44 INDIA STREET
BROOKLYN · BIN 3064381
💬 Discuss this project
1910Year Built
2Stories
B9Building Class
R6BZoning
1,680 sfGross Floor Area
2Units
Miscellaneous two family · Owner of record: SCOZZARI LLC · 2,300 sf lot · 0.73 FAR built · Flood zone AE
Locations of Work
StructuralMechanicalFire Protection
Roof1p · 1 filing · 2 docs
Bulkhead4p · 3 filings · 13 docs
Floor 41p · 1 filing · 7 docs
Floor 33p · 2 filings · 6 docs
Floor 21p · 1 filing · 7 docs
Floor 11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SCOZZARI LLC1303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/06/2020$1.8M—— → —$1,042/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADSEN CONSULTING ENGINEERING, PLLC208/24/2023
EP ENGINEERING LLC311/16/2022
CHOSHIELDS STUDIO108/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SATWIN ARCHITECT, PC1203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MACIA INSPECTION & TESTIN402608/24/2023
Building Lifecycle
All (48)Filed (6)Objection (12)Special Inspection (30)
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/29/2023
Objection raised — Other
08/29/2023
Objection resolved — Addressed
08/24/2023
Filed — Alteration
FOUNDATION WORK FOR NEW FOUR STORY NON-COMBUSTIBLE RESIDENTIAL BUILDING WITH STEEL FRAMES AND STEEL FLOOR BEAMS WITH CONCRETE ON METAL DECK SLABS.
B07994397-I1
08/23/2023
Objection raised — Other
08/23/2023
Objection raised — Other
08/23/2023
Objection raised — Other
08/23/2023
Objection raised — Other
08/23/2023
Objection raised — Other
08/11/2023
Filed — Alteration
STRUCTURAL WORK FOR A NEW 4-STORY NON-COMBUSTIBLE RESIDENTIAL BUILDING WITH STEEL FRAMES AND STEEL FLOOR BEAMS WITH CONCRETE ON METAL DECK SLABS.
B07994389-I1
06/05/2023
Special inspection requirement — Masonry
Jeffrey Stones
11/16/2022
Filed — Alteration
B07994331-I1
11/09/2022
Filed — Alteration
B07994340-I1
11/09/2022
Filed — Alteration
B07994335-I1
10/31/2022
Special inspection requirement — Concrete - Cast-In-Place
Jeffrey Stones
10/31/2022
Special inspection requirement — Post-installed Anchors
Jeffrey Stones
10/31/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Jeffrey Stones
10/31/2022
Special inspection requirement — Structural Steel - Welding
Jeffrey Stones
10/31/2022
Special inspection requirement — Post-installed Anchors
Jeffrey Stones
10/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
10/31/2022
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Jeffrey Stones
08/31/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
B00793156-I1
08/29/2022
Special inspection requirement — Structural Steel - Details
Jeffrey Stones
08/28/2022
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
08/28/2022
Special inspection requirement — Metering
Jeffrey Stones
08/28/2022
Special inspection requirement — Lighting controls
Jeffrey Stones
08/28/2022
Special inspection requirement — Lighting in dwelling units
Jeffrey Stones
08/28/2022
Special inspection requirement — Exterior lighting power
Jeffrey Stones
08/26/2022
Special inspection requirement — Sprinkler Systems
Jeffrey Stones
08/26/2022
Special inspection requirement — Final
Jeffrey Stones
08/15/2022
Special inspection requirement — Fenestration areas
Jeffrey Stones
08/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
08/15/2022
Special inspection requirement — Permanent certificate
Jeffrey Stones
08/15/2022
Special inspection requirement — Insulation placement and R values
Jeffrey Stones
08/15/2022
Special inspection requirement — Protection of exposed foundation insulation
Jeffrey Stones
08/15/2022
Special inspection requirement — Fenestration air leakage
Jeffrey Stones
08/15/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Jeffrey Stones
08/15/2022
Special inspection requirement — Concrete - Cast-In-Place
Jeffrey Stones
08/15/2022
Special inspection requirement — Air barrier - visual inspection
Jeffrey Stones
08/15/2022
Special inspection requirement — Masonry
Jeffrey Stones
08/15/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Stones
08/15/2022
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
08/15/2022
Special inspection requirement — Air barrier — testing
Jeffrey Stones
08/15/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeffrey Stones
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDDC BUILDING SERVICES INC06/06/2007
BIS—ISSUEDALMO GROUP CORPORATION04/09/2007
BIS—ISSUEDALMO GROUP CORPORATION12/04/2006
BIS—ISSUEDALMO GROUP CORPORATION03/22/2005
2 projects · most recent 08/24/2023
Steel Concrete Masonry
FiledStatusContractorScope
08/24/2023——1 scope_items
08/11/2023——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
06/05/2023MasonryJeffrey Stonesspecial
10/31/2022Concrete - Cast-In-PlaceJeffrey Stonesspecial
10/31/2022Post-installed AnchorsJeffrey Stonesspecial
10/31/2022Structural Steel - High Strength BoltingJeffrey Stonesspecial
10/31/2022Structural Steel - WeldingJeffrey Stonesspecial
10/31/2022Post-installed AnchorsJeffrey Stonesspecial
10/31/2022Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
10/31/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Jeffrey Stonesspecial
08/29/2022Structural Steel - DetailsJeffrey Stonesspecial
08/28/2022Fire-Resistance Rated ConstructionJeffrey Stonesprogress
08/28/2022MeteringJeffrey Stonesenergy_progress
08/28/2022Lighting controlsJeffrey Stonesenergy_progress
08/28/2022Lighting in dwelling unitsJeffrey Stonesenergy_progress
08/28/2022Exterior lighting powerJeffrey Stonesenergy_progress
08/26/2022Sprinkler SystemsJeffrey Stonesspecial
08/26/2022FinalJeffrey Stonesprogress
08/15/2022Fenestration areasJeffrey Stonesenergy_progress
08/15/2022Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
08/15/2022Permanent certificateJeffrey Stonesenergy_progress
08/15/2022Insulation placement and R valuesJeffrey Stonesenergy_progress
08/15/2022Protection of exposed foundation insulationJeffrey Stonesenergy_progress
08/15/2022Fenestration air leakageJeffrey Stonesenergy_progress
08/15/2022Exterior Insulation and Finish Systems (EIFS)Jeffrey Stonesspecial
08/15/2022Concrete - Cast-In-PlaceJeffrey Stonesspecial
08/15/2022Air barrier - visual inspectionJeffrey Stonesenergy_progress
Latest 25 of 31.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B00793156-I1Request digital key ↗
08/28/2026B07994335-I1Request digital key ↗
08/28/2026B07994340-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00793156-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B07994335-I1Open ↗
08/28/2026B07994340-I1Open ↗
08/28/2026B07994331-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026B07994335-I1Open ↗
08/28/2026B07994335-I1Open ↗
08/25/2026B00793156-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026B00793156-I1Open ↗
08/25/2026B00793156-I1Open ↗
08/25/2026B00793156-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00793156-I1Open ↗
▸Safety & Tenant Protection2
▸BISBPP: STREET TREES SITE PLAN1
03/08/2023340880504Open ↗
▸BISSTREET TREE CHECKLIST1
03/08/2023340880504Open ↗
▸Environmental & Asbestos6
▸DOB NOWOER: Notice to Proceed3
08/13/2026B00793156-I1Open ↗
08/13/2026B07994397-I1Open ↗
08/13/2026B07994389-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B07994389-I1Open ↗
08/13/2026B00793156-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026B07994397-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B07994397-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B07994397-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B00793156-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00793156-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00793156-I1Open ↗