← Back
Walk-up apt, over six families with stores
44 MACOMBS PLACE
MANHATTAN · BIN 1084154
💬 Discuss this project
1936Year Built
5Stories
C7Building Class
R7-2Zoning
176,165 sfGross Floor Area
398Units
LL97 CoveredRent Stabilized6 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: HARLEM RIVER PRESERVATION HDFC · 227,608 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof9p · 1 filing · 20 docs
Bulkhead4p · 2 filings · 20 docs
Floor 15p · 1 filing · 20 docs
Basement8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SETTLEMENT HOUSING FUND4607/08/2026
NYCHA 99203/22/2026
HARLEM RIVER PRESERVATION LLC203/22/2026
NY CITY HOUSING AUTHORITY103/21/2026
NYCHA1303/21/2026
NEW YORK CITY HOUSING AUTHORITY603/21/2026
NYC HOUSING AUTHORITY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CURTIS + GINSBERG ARCHITECTS LLP1410/02/2025
URBAN INTEGRATIONS105/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SKYLINE ACCESS103/21/2026
JM ZONING, LLC.2803/21/2026
PREEMPTIVE SOLUTIONS & CONSULTING L203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIVER CITY BUILDERS LLCGeneral Contractor1207/08/2026
SNS ORGNIZATION LTDGeneral Contractor407/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
DUAL FUEL PLUBING & HTINGPlumbing207/08/2026
CAPONE ELECL CONTRS CORPElectrical103/22/2026
INPRO PLUMBING CORPPlumbing107/08/2026
FRANCIS RICHARDSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266606/05/2025
COASTAL CONSTRUCTION SERV3827104/11/2024
Building Lifecycle
All (82)Filed (16)Permit Issued (14)Signed Off (8)Violation (25)Inspection (7)Special Inspection (12)
08/19/2026
Violation issued (HPD, open)
B
05/20/2026
Signed off — Alteration
M01144905-I1
05/13/2026
Permit issued — Suspended Scaffold
M01144905-I1-SC
12/02/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-S2
11/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/02/2025
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-P8
10/01/2025
Permit issued — Plumbing
M00447176-S2-PL
08/26/2025
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-P7
07/30/2025
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-P6
07/10/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-S1
07/08/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-I1
07/07/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-S5
06/24/2025
Special inspection requirement — Final
Peter Varsalona
06/24/2025
Special inspection requirement — Mechanical Systems
Peter Varsalona
06/17/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-S4
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Monroe
06/16/2025
Special inspection requirement — Post-installed Anchors
John Monroe
06/16/2025
Special inspection requirement — Final
matthew melody
06/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
John Monroe
06/16/2025
Special inspection requirement — Masonry
John Monroe
06/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
06/12/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/06/2025
Violation issued (HPD, closed)
C
06/05/2025
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-P4
06/05/2025
Permit issued — Mechanical Systems
M00447176-S1-MS
05/29/2025
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-P5
05/20/2025
Violation issued (HPD, closed)
C
05/20/2025
Violation issued (HPD, closed)
C
03/14/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-S3
02/28/2025
Permit issued — General Construction
M00447176-I1-GC
01/02/2025
Filed — Alteration
M01144905-I1
12/10/2024
Permit issued — Mechanical Systems
M00447176-S5-MS
11/18/2024
Violation issued (HPD, closed)
A
11/18/2024
Violation issued (HPD, closed)
B
11/18/2024
Violation issued (HPD, closed)
A
09/28/2024
Violation issued (HPD, closed)
C
07/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
06/06/2024
Permit issued — Plumbing
M00447176-S3-PL
05/13/2024
Violation issued (HPD, closed)
B
05/10/2024
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-P3
05/07/2024
Permit issued — General Construction
M00447176-I1-GC
04/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/11/2024
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-S5
03/27/2024
Special inspection requirement — Chimneys and vents
Peter Varsalona
03/27/2024
Special inspection requirement — Final
Peter Varsalona
03/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH FREGLETTE
03/27/2024
Special inspection requirement — Mechanical Systems
Peter Varsalona
03/25/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
02/20/2024
Filed — Alteration
INSTALLATION OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK IN A 5-STORY NYCHA MULTIPLE DWELLING IN CONJUNCTION WITH BUILDING WIDE RENOVATIONS: NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED. FILED SUBSEQUENT TO GENERAL CONSTRUCTION FILING M00447176.
M00447176-P2
12/15/2023
Permit issued — General Construction
M00447176-I1-GC
08/01/2023
Signed off — Alteration
M00743919-I1
06/07/2023
Permit issued — Plumbing
M00447176-S3-PL
05/26/2023
Permit issued — Sidewalk Shed
M00743919-I1-SH
03/30/2023
Violation issued (HPD, closed)
A
01/19/2023
Permit issued — General Construction
M00447176-I1-GC
01/04/2023
Violation issued (HPD, closed)
C
01/04/2023
Violation issued (HPD, closed)
C
11/03/2022
Violation issued (HPD, closed)
I
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC05/13/2026
DOB NOWPlumbingSigned-offINPRO PLUMBING CORP10/01/2025
DOB NOWMechanical SystemsSigned-offSNS ORGNIZATION LTD06/05/2025
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/28/2025
DOB NOWMechanical SystemsSigned-offSNS ORGNIZATION LTD12/10/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING06/06/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC05/07/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC12/15/2023
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING06/07/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC05/26/2023
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC01/19/2023
DOB NOWCurb CutSigned-offRIVER CITY BUILDERS LLC09/23/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC05/26/2022
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/14/2022
BISFPISSUEDALLIED FIRE CONTROL SVCS05/01/2018
BISOTISSUEDROCKMORE CONTRACTING CORP07/29/2016
BISOTISSUEDROCKMORE CONTRACTING CORP05/13/2016
BISEQISSUEDROCKMORE CONTRACTING CORP04/16/2016
BISEQISSUEDROCKMORE CONTRACTING CORP02/29/2016
BISEQISSUEDROCKMORE CONTRACTING CORP02/19/2016
BISEQISSUEDROCKMORE CONTRACTING CORP02/18/2016
BISEQISSUEDROCKMORE CONTRACTING CORP03/09/2015
BISEQISSUEDROCKMORE CONTRACTING CORP02/17/2015
BISEQISSUEDROCKMORE CONTRACTING CORP02/17/2015
BISFPISSUEDALLIED FIRE CTR SVCS INC01/12/2012
BISPLISSUEDMJM PLUMBING INC08/19/2011
BISOTISSUEDPYTHAGORAS GC CORP08/16/2007
BISOTRE-ISSUEDPYTHANGORAS GC CORP08/16/2007
BISPLRE-ISSUEDPYTHAGORAS GC CORP08/16/2007
BISOTISSUEDPYTHAGORAS GC CORP08/16/2007
BISPLISSUEDPYTHAGORAS GC GROUP08/16/2007
BISOTISSUEDPYTHAGRAS GC CORP07/25/2007
BISPLISSUEDPYTHAGORAS GC CORP07/25/2007
BISPLISSUEDPYTHAGORAS GC CORP07/25/2007
BISOTISSUEDPYTHAGRAS GC CORP07/25/2007
BISPLISSUEDPYTHAGORAS GC CORP07/25/2007
BISOTISSUEDPYTHAGRAS GC CORP07/25/2007
2 projects · most recent 03/11/2026
General Wiring
FiledStatusContractorScope
03/11/2026CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
06/01/2022CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
04/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/24/2025FinalPeter Varsalonaprogress
06/24/2025Mechanical SystemsPeter Varsalonaspecial
06/16/2025Fire-Resistant Penetrations and JointsJohn Monroespecial
06/16/2025Post-installed AnchorsJohn Monroespecial
06/16/2025Finalmatthew melodyprogress
06/16/2025Fire-Resistance Rated ConstructionJohn Monroeprogress
06/16/2025MasonryJohn Monroespecial
06/16/2025Structural Stability – Alterations of existing buildingsJohn Monroespecial
03/27/2024Chimneys and ventsPeter Varsalonaspecial
03/27/2024FinalPeter Varsalonaprogress
03/27/2024Tenant Protection Plan ComplianceJOSEPH FREGLETTEspecial
03/27/2024Mechanical SystemsPeter Varsalonaspecial
▾Documents — 173 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch13
09/04/2026M00447176-S4Request digital key ↗
09/04/2026M00447176-S2Request digital key ↗
09/04/2026M00447176-S1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00447176-P1Request digital key ↗
09/04/2026M00447176-I1Request digital key ↗
09/04/2026M00447176-P5Request digital key ↗
▸Applications & Permits29
▸DOB NOWLPC Approval/Permit13
09/04/2026M00447176-S2Open ↗
09/04/2026M00447176-S1Open ↗
09/04/2026M00447176-P8Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION10
05/02/2018120528857Open ↗
08/09/2016140217441Open ↗
05/26/2016140217441Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
04/14/2016140483395Open ↗
03/25/2015122342704Open ↗
02/25/2015122272076Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/04/2026M00447176-P1Open ↗
09/04/2026M00447176-S3Open ↗
09/04/2026M00447176-S2Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
12/15/2016122342704Open ↗
12/15/2016140483395Open ↗
12/15/2016122272076Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/14/2016140483395Open ↗
03/25/2015122342704Open ↗
02/25/2015122272076Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/30/2026M00447176-S1Open ↗
08/24/2026M00447176-I1Open ↗
08/24/2026M00447176-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026M00447176-S1Open ↗
08/24/2026M00447176-I1Open ↗
08/23/2026M00447176-S5Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/25/2015122342704Open ↗
02/25/2015122272076Open ↗
02/25/2015122272183Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/14/2016140483395Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/17/2014140217441Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/14/2016140483395Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
01/17/2012120528857Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan Attachments/Drawings3
09/04/2026M00447176-P5—
08/13/2026M00447176-P1—
08/13/2026M00447176-I1—
▸BISTENANT PROTECTION PLAN AND NOTES1
04/14/2016140483395Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/04/2026M00447176-S1Open ↗
09/04/2026M00447176-P1Open ↗
09/04/2026M00447176-S3Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
12/13/2016140217441Open ↗
12/13/2016140217441Open ↗
12/13/2016140217441Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/25/2015122342704Open ↗
01/17/2012120528857Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/17/2012120528857Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/13/2016140217441Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/13/2016140217441Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/17/2014140217441Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/14/2016140483395Open ↗
07/17/2014140217441Open ↗
▸Approvals, Objections & Sign-offs35
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/04/2026M00447176-S4Open ↗
09/04/2026M00447176-P1Open ↗
09/04/2026M00447176-S3Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
12/15/2016122342704Open ↗
12/15/2016140483395Open ↗
12/15/2016122272076Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
05/02/2018120528857Open ↗
12/13/2016140217441Open ↗
12/13/2016140217441Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL4
12/13/2016140217441Open ↗
12/07/2016140217441Open ↗
04/14/2016140483395Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
09/04/2026M00447176-S4Open ↗
08/13/2026M00743919-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/17/2012120528857Open ↗
▸BISSHED LETTER1
03/07/2016122272076Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
09/04/2026M00447176-S4Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
12/13/2016140217441Open ↗
07/17/2014140217441Open ↗
01/17/2012120528857Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION7
06/09/2015122272076Open ↗
03/25/2015122342704Open ↗
03/19/2015122272076Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
03/25/2015122342704Open ↗
02/25/2015122272076Open ↗
01/17/2012120528857Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
04/14/2016140483395Open ↗
07/17/2014140217441Open ↗
02/25/2015122272183Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
05/26/2016140217441Open ↗
03/16/2015122342704Open ↗
02/20/2015122272183Open ↗
Showing 3 of 4 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION1
04/14/2016140483395Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01144905-I1Open ↗