← Back
Stand-alone food establishment
44 MAIN STREET
STATEN ISLAND · BIN 5088623
💬 Discuss this project
1901Year Built
3Stories
K5Building Class
C3AZoning
5,969 sfGross Floor Area
1Units
14 Open Violations ▸FDNY Report ↗
Stand-alone food establishment · Owner of record: MELINDA MALERBA LLC · 14,282 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
44MAIN ST RICHOMOND LLC1103/22/2026
MELINDA MALERBA LLC303/22/2026
44 MAIN RICHMOND LLC103/22/2026
44 MAIN STREET1903/21/2026
ANGELINA'S203/21/2026
ANGELINAS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE3408/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
2D CONSTRUCTION CORPGeneral Contractor607/08/2026
RIGNEY REFRIGERATION HEATGeneral Contractor109/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THINK DESIGN ARCHITECTURA683106/10/2025
Building Lifecycle
All (133)Filed (34)Permit Issued (5)Signed Off (3)Violation (60)Objection (22)Special Inspection (9)
09/21/2026
Permit issued — Mechanical Systems
S01443272-I1-MS
08/23/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF (1) ONE ROOF TOP UNIT AT ROOF ON COVERED PORCH OF EXISTING COMMERCIAL BUILDING. NO CHANGE IN USE, OR OCCUPANCY UNDER THIS APPLICATION. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01443272-I1
08/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Martarella III
08/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
08/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
08/23/2026
Special inspection requirement — Shutoff dampers
Frank Martarella III
08/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
08/20/2026
Filed — No Work
S01439611-I1
08/10/2026
Special inspection requirement — Final
Frank Martarella III
08/10/2026
Special inspection requirement — Mechanical Systems
Frank Martarella III
06/11/2026
Filed — No Work
S01410067-I1
03/27/2026
Objection raised — Other
03/27/2026
Objection resolved — Addressed
03/26/2026
Signed off — Alteration
APPLICATION FILED TO SUPERSEDE APPLICATION #520320304 WHICH WAS FILED FOR ERECTION OF A FREE-STANDING TEMPORARY TENT STRUCTURE (PLACE OF ASSEMBLY) AT THE SIDE OF EXISTING THREE-STORY EATING AND DRINKING ESTABLISHMENT. NO CHANGE OF USE, EGRESS OR OCCUPANCY
S01367827-I1
03/26/2026
Filed — No Work
S01377403-I1
03/23/2026
Permit issued — General Construction
S01367827-I1-GC
03/18/2026
Filed — Alteration
APPLICATION FILED TO SUPERSEDE APPLICATION #520320304 WHICH WAS FILED FOR ERECTION OF A FREE-STANDING TEMPORARY TENT STRUCTURE (PLACE OF ASSEMBLY) AT THE SIDE OF EXISTING THREE-STORY EATING AND DRINKING ESTABLISHMENT. NO CHANGE OF USE, EGRESS OR OCCUPANCY
S01367827-I1
03/11/2026
Special inspection requirement — Final
Frank Martarella III
01/07/2026
Violation issued (FDNY_ORDER, closed)
12/30/2025
Filed — No Work
S01332172-I1
10/15/2025
Signed off — Alteration
APPLICATION FILED TO SUPERSEDE APPLICATION #520305722 WHICH WAS FILED FOR ERECTION OF FREE STANDING TEMPORARY TENT STRUCTURE (30' X 60') AT SIDE OF EXISTING THREE STORY EATING AND DRINKING ESTABLISHMENT
S01293433-I1
10/10/2025
Permit issued — General Construction
S01293433-I1-GC
10/09/2025
Filed — Alteration
APPLICATION FILED TO SUPERSEDE APPLICATION #520305722 WHICH WAS FILED FOR ERECTION OF FREE STANDING TEMPORARY TENT STRUCTURE (30' X 60') AT SIDE OF EXISTING THREE STORY EATING AND DRINKING ESTABLISHMENT
S01293433-I1
10/07/2025
Objection resolved — Addressed
09/25/2025
Objection raised — Admin
09/25/2025
Special inspection requirement — Final
Frank Martarella III
09/18/2025
Filed — No Work
S01284030-I1
07/29/2025
Signed off — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF (1) ROOF TOP UNIT AT ROOF OF AN EXISTING THREE STORY COMMERCIAL BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01234214-I1
06/23/2025
Permit issued — Mechanical Systems
S01234214-I1-MS
06/10/2025
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF (1) ROOF TOP UNIT AT ROOF OF AN EXISTING THREE STORY COMMERCIAL BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01234214-I1
06/10/2025
Filed — No Work
S01236504-I1
03/06/2025
Filed — No Work
S01189101-I1
02/11/2025
Violation issued (FDNY_ORDER, closed)
12/17/2024
Filed — No Work
S01154541-I1
09/11/2024
Objection resolved — Addressed
09/11/2024
Objection resolved — Addressed
09/10/2024
Filed — No Work
S01108028-I1
09/10/2024
Objection raised — Structural
09/10/2024
Objection raised — Admin
06/12/2024
Filed — No Work
S01063020-I1
04/11/2024
Violation issued (FDNY_ORDER, closed)
04/11/2024
Violation issued (FDNY_ORDER, closed)
03/21/2024
Filed — No Work
S01017913-I1
01/19/2024
Violation issued (FDNY_ORDER, closed)
01/18/2024
Violation issued (FDNY_ORDER, closed)
12/18/2023
Objection raised — Other
12/18/2023
Objection resolved — Addressed
12/15/2023
Filed — No Work
S00977402-I1
09/14/2023
Filed — No Work
S00931968-I1
07/14/2023
Filed — No Work
S00903915-I1
07/14/2023
Objection raised — Other
07/14/2023
Objection resolved — Addressed
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 133 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRIGNEY REFRIGERATION HEAT09/21/2026
DOB NOWGeneral ConstructionSigned-off2D CONSTRUCTION CORP03/23/2026
DOB NOWGeneral ConstructionSigned-off2D CONSTRUCTION CORP10/10/2025
DOB NOWMechanical SystemsSigned-off2D CONSTRUCTION CORP06/23/2025
DOB NOWConstruction FencePermit Issued2D CONSTRUCTION CORP01/26/2018
BISOTISSUED2D CONSTRUCTION CORP03/12/2019
BISPLISSUEDKCM PLUMBING & HEATING CO04/03/2018
BISBLISSUED2D CONSTRUCTION CORP03/23/2018
BISMHISSUED2D CONSTRUCTION CORP03/23/2018
BISOTISSUED2D CONSTRUCTION CORP02/13/2018
BISOTISSUED2D CONSTRUCTION CORP12/04/2017
BISOTISSUED2D CONSTRUCTION CORP11/14/2017
BISOTISSUED2D CONSTRUCTION CORP06/28/2017
BISOTISSUED2D CONSTRUCTION CORP03/22/2017
BISOTISSUEDHUDSON AWNING COMPANY INC04/25/2012
BISOTISSUEDCHAMPION CONTRUCTION CORP04/08/2010
BISPLISSUEDG.N.T. MECHANICAL, LLC12/21/2007
BISFPISSUEDRELIABLE FIRE PROTECTION INC12/17/2007
BISBLISSUEDG.N.T. MECHANICAL, LLC12/04/2007
BISEQISSUEDVINCENT CASCONE05/24/2007
BISMHISSUEDVINCENT CASCONE05/24/2007
BIS—ISSUEDVINCENT CASCONE05/24/2007
BISPLISSUEDG.N.T. MECHANICAL, LLC02/20/2007
BISPLISSUEDG.N.T. MECHANICAL, LLC02/20/2007
BISSPISSUEDG.N.T. MECHANICAL, LLC02/20/2007
BISPLISSUEDENOBRAC PLUMBING, INC02/02/2007
BISMHISSUEDVINCENT CASCONE12/27/2006
BIS—ISSUEDVINCENT CASCONE08/29/2006
BISEQISSUEDVINCENT CASCONE08/29/2006
BISPLISSUEDM & A PLBG & HTG CORP04/05/2006
BISOTISSUEDVINCENT CASCONE03/28/2006
BISFPISSUEDMASTER FIRE SYSTEMS, INC01/06/2004
BISPLISSUEDPAT MCCANN P&H INC03/04/1999
BISPLISSUEDPAT MCCANN P&H INC08/21/1998
BISOTISSUEDMIRO CONSTRUCTION CO.08/14/1998
BISFPISSUEDLUND FIRE PRODUCTS CO. INC.07/24/1998
1 project · most recent 08/23/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/23/2026Signed-offRIGNEY REFRIGERATION HEATHeating and Air Conditioning Systems
Heat / Cool
York KJ150N24R4AAAAA1A1 240,000 BTU · Rooftop Unit ×1
1 project · most recent 01/31/2018
General Wiring Lighting
FiledStatusContractorScope
01/31/2018CompleteV & V ELEC'L CONTR'G INC.General Wiring, Lighting
1 project · most recent 08/23/2026
FiledStatusContractorScope
08/23/2026Signed-offRIGNEY REFRIGERATION HEAT1 scope_items
1 project · most recent 01/25/2018
Fence
FiledStatusContractorScope
01/25/2018Permit Issued2D CONSTRUCTION CORPFence
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/23/2026HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
08/23/2026HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
08/23/2026Energy Code Compliance InspectionsFrank Martarella IIIprogress
08/23/2026Shutoff dampersFrank Martarella IIIenergy_progress
08/23/2026HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
08/10/2026FinalFrank Martarella IIIprogress
08/10/2026Mechanical SystemsFrank Martarella IIIspecial
03/11/2026FinalFrank Martarella IIIprogress
09/25/2025FinalFrank Martarella IIIprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Lina's RistoranteRestaurant / Food ServiceGround
Project S01367827 Alteration · LOC Issued · 03/18/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 235 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch - Temporary Place of Assembly29
08/26/2026S00109021-I1Request digital key ↗
08/26/2026S00122237-I1Request digital key ↗
08/26/2026S00130688-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch5
08/26/2026S00002608-I1Request digital key ↗
08/25/2026S01443272-I1Request digital key ↗
08/19/2026S01234214-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits31
▸BISWORK PERMIT APPLICATION17
03/12/2019520331490Open ↗
04/04/2018520331481Open ↗
03/26/2018520331490Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
11/06/2019520331490Open ↗
08/21/2019520320304Open ↗
04/02/2018520320304Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications75
▸DOB NOWDPL-1: Design Professional Seal & Signature34
08/26/2026S00002608-I1Open ↗
08/26/2026S00122237-I1Open ↗
08/26/2026S00130688-I1Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
03/10/2020520327307Open ↗
12/27/2019520331490Open ↗
08/23/2019520293842Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
03/26/2018520331490Open ↗
02/13/2018520327307Open ↗
11/16/2017520320304Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026S01443272-I1Open ↗
09/23/2026S01443272-I1Open ↗
09/23/2026S01443272-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
02/13/2018520327307Open ↗
11/16/2017520320304Open ↗
07/25/2017520305722Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
04/25/2012520097458Open ↗
03/25/2010520032250Open ↗
11/13/2007510021049Open ↗
▸BISPC FULL REPORT2
11/13/2007510021049Open ↗
08/14/2007510012727Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026S01443272-I1Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING3
05/02/2008510021021Open ↗
04/11/2008510021021Open ↗
11/13/2007510021021Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
11/06/2019520331490Open ↗
12/04/2007510021049Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
09/27/2010510058722Open ↗
05/14/2008510012727Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
05/09/2008510021021Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
02/13/2018520327307Open ↗
▸Environmental & Asbestos5
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/25/2010520032250Open ↗
10/29/2008510058722Open ↗
11/13/2007510021021Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
11/13/2007510021049Open ↗
08/14/2007510012727Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/27/2019520331490Open ↗
08/23/2019520293842Open ↗
03/30/2018520331481Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
03/10/2020520327307Open ↗
12/27/2019520331490Open ↗
08/23/2019520293842Open ↗
▸Inspections & Test Reports4
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION2
12/04/2007510021049Open ↗
12/04/2007510021049Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/13/2018520327307Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
02/13/2018520327307Open ↗
▸Approvals, Objections & Sign-offs33
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
05/19/2020520320304Open ↗
03/10/2020520327307Open ↗
01/31/2020520305722Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
02/13/2018520327307Open ↗
11/16/2017520320304Open ↗
07/25/2017520305722Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/08/2020520320304Open ↗
02/26/2020520320304Open ↗
02/26/2020520320304Open ↗
Showing 3 of 5 on file for this type
▸BISNYS DEC TIDAL WETLANDS APPROVAL2
05/29/2018520327307Open ↗
02/09/2018520320304Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT17
03/10/2020520327307Open ↗
12/27/2019520331490Open ↗
08/23/2019520293842Open ↗
Showing 3 of 17 on file for this type
▸Filing & Intake Forms17
▸BISBOROUGH INTAKE FORM7
03/10/2020520327307Open ↗
12/27/2019520331490Open ↗
10/30/2019520331490Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET7
03/26/2018520331490Open ↗
03/26/2018520331481Open ↗
02/13/2018520327307Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION3
05/18/2020520320304Open ↗
05/29/2018520327307Open ↗
05/29/2018520327307Open ↗
▸Other Documents4
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS2
10/31/2008510058722Open ↗
05/09/2008510021021Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/14/2008510012727Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
12/27/2019520331490Open ↗