← Back
Elevator cooperative
St. George Tower & Grill CAMPUS
44 PINEAPPLE STREET · BIN 3001726
💬 Discuss this project
1929Year Built
30Stories
D4Building Class
R7-1Zoning
441,063 sfGross Floor Area
275Units
LL97 CoveredRent Stabilized11 Open Violations 8 unresolved · 3 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: STGEORGE TOWER & GRILL OWNERS · 23,325 sf lot · 18.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction63p · 10 filings · 20 docs
Floor 30Under Construction21p · 5 filings · 20 docs
Floor 29Under Construction18p · 3 filings · 15 docs
Floor 28Under Construction12p · 4 filings · 20 docs
Floor 27Under Construction7p · 1 filing · 9 docs
Floor 26
Floor 25
Floor 24Under Construction4p · 2 filings · 20 docs
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 181p · 1 filing · 6 docs
Floor 17
Floor 16Under Construction7p · 2 filings · 20 docs
Floor 152p · 1 filing · 4 docs
Floor 14Under Construction3p · 1 filing · 8 docs
Floor 13
Floor 12
Floor 11
Floor 102p · 1 filing · 3 docs
Floor 92p · 1 filing · 6 docs
Floor 8
Floor 7Under Construction6p · 2 filings · 20 docs
Floor 6Under Construction12p · 2 filings · 13 docs
Floor 5Under Construction8p · 4 filings · 20 docs
Floor 4Under Construction14p · 2 filings · 20 docs
Floor 3
Floor 2Under Construction68p · 6 filings · 20 docs
Floor 1Under Construction71p · 7 filings · 20 docs
CellarUnder Construction69p · 6 filings · 20 docs
Sub-CellarUnder Construction36p · 5 filings · 20 docs
BasementUnder Construction10p · 2 filings · 20 docs
Sub-BasementUnder Construction64p · 4 filings · 20 docs
3 jobs · most recent 07/09/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/09/2026Permit IssuedG.A.M.C.N.Y. LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PURY-EP336TSNU-A1 336,000 BTU · Vrf Outdoor ×2
PUHY-EP288TSNU-A1 288,000 CFM · Vrf Outdoor ×1
PUHY-EP360TSNU-A1 360,000 BTU · Vrf Outdoor ×1
PURY-EP144TNU-A 144,000 BTU · Vrf Outdoor ×1
PURY-EP240TSNU-A1 240,000 BTU · Vrf Outdoor ×1
Dectron DS-020-NS-I-G3NB1302N0C3BN3H / NG-V-01 48,000 BTU · Other ×1
DS-025-NS-I-G3NT1182N0C3BN3H / NG-V-01 60,000 BTU · Other ×1
Ventilation
Mitsubishi Electric LGH-F1200RVX2-E 1,200 CFM · Erv ×1
LGH-F940RVX2-E 940 CFM · Erv ×1
10/15/2025Signed-offSPIREPLAST, CORPAir Conditioning Systems
Cooling
Lg LG type floor console unit Model #LQN-090-HV4 300 CFM · Vrf Indoor ×1
LG type floor console unit Model #LQN-120-HV4 400 CFM · Vrf Indoor ×1
LG type multi "F" max heat pump Model #LMU-24-3HV 900 CFM · Split System ×1
11/06/2020——Air Conditioning Systems
Cooling
M3 Air Products VCU-C-030-1-LX 30,000 BTU · Condensing Unit ×1
1 job · most recent 07/01/2025
FiledStatusContractorScope
07/01/2025——582 heads
7 jobs · most recent 07/31/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/31/2026Permit IssuedTOP PLUMBING AND HEATINGGas, Water/Sanitary
06/15/2026Permit IssuedNICE PLUMBING CORPGas, Water/Sanitary
05/26/2026Permit IssuedR & S PLUMBING & HTG INCGas, Water/Sanitary
03/19/2026Permit IssuedALMA PLBG SPRINKLER INCWater/Sanitary
11/10/2025Signed-offAMW PLUMBING INCGas, Water/Sanitary
10/15/2025Signed-offNICE PLUMBING CORPGas, Water/Sanitary
07/01/2025———
25 jobs · most recent 09/28/2026
General Wiring
FiledStatusContractorScope
09/28/2026Permit IssuedSTABILITY ELEC ENTERP INCGeneral Wiring
09/25/2026Permit IssuedA+ ELECTRIC OF GREATER NY275 meters, 1 new_meters
09/16/2026Permit IssuedDENMAR ELECTRIC CORPGeneral Wiring
08/20/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
07/22/2026CompleteA+ ELECTRIC OF GREATER NYGeneral Wiring
07/15/2026Permit IssuedCMY ELECTRICAL CORPGeneral Wiring
05/18/2026CompleteKJK ELECTRIC INCGeneral Wiring
05/12/2026Permit IssuedSUPER CHARGED ELEC. INC.General Wiring
05/01/2026Permit IssuedA+ ELECTRIC OF GREATER NYGeneral Wiring
03/21/2026Permit IssuedREDLINE ELECTRIC INCGeneral Wiring
03/18/2026Permit IssuedLCJ ELEC'L CONTR'S INCGeneral Wiring
02/19/2026CompleteASCUATECH ELECTRICAL CORP—
01/07/2026Permit IssuedNET POWER ELECTRIC CORPGeneral Wiring
12/05/2025Permit IssuedN.Z. PILGRIM ELECTRIC INCGeneral Wiring
10/16/2025Permit IssuedPDI NYC ELECTRIC, LLCGeneral Wiring
3 jobs · most recent 07/31/2026
Steel
FiledStatusContractorScope
07/31/2026Permit IssuedZ S NY IMPROVEMENT CORP1 scope_items
10/16/2025Permit IssuedMNC GENERAL CONTR CORPSteel
04/23/2025Signed-offMALCON CONSTRUCTION CORPSteel
3 jobs · most recent 02/19/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
02/19/2026Permit IssuedDYNAMIC HOISTING SCAFF INScaffold
12/29/2025Permit IssuedDHS FRACO LLCScaffold
08/01/2023Signed-offCEPRINE CONSTRUCTION INCSidewalk Shed
2 jobs · most recent 07/31/2026
Tenant Protection Plan 72 Hour Suspended Scaffold
FiledStatusContractorScope
07/31/2026Permit IssuedZ S NY IMPROVEMENT CORPTenant Protection Plan 72 Hour
02/04/2026Signed-offQUALITY BLDG CONSTRUCTIONSuspended Scaffold
2 jobs · most recent 02/04/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
02/04/2026Signed-offQUALITY BLDG CONSTRUCTIONSuspended Scaffold (SC)
05/20/2024Permit IssuedQUALITY BLDG CONSTRUCTIONSuspended Scaffold (SC)
Building Lifecycle
All (300)Filed (39)Permit Issued (61)Signed Off (25)Facade (FISP) (14)Violation (12)Inspection (40)Objection (79)Special Inspection (30)
09/18/2026
Permit issued — General Construction
B01412148-I1-GC
09/17/2026
Permit issued — Plumbing
B01412148-S1-PL
09/02/2026
Permit issued — Plumbing
B00317440-I1-PL
09/02/2026
Permit issued — Plumbing
B00323053-I1-PL
08/31/2026
Permit issued — General Construction
B01408758-I1-GC
08/31/2026
Objection resolved — Addressed
08/25/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy.
B01345678-I1
08/19/2026
Permit issued — Plumbing
B01358320-S1-PL
08/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/11/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/06/2026
Permit issued — Sidewalk Shed
B00861009-I1-SH
07/31/2026
Filed — Alteration
INTERIOR PLUMBING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCCUPANCY OR USE.
B01412148-S1
07/31/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/30/2026
Filed — Alteration
INTERIOR PLUMBING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCCUPANCY OR USE.
B01412148-I1
07/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/16/2026
Cycle 9 facade report signed — SWARMP
07/16/2026
Special inspection requirement — Final
07/15/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/14/2026
Special inspection requirement — High Temperature Hot Water Piping (Welding)
SOFIA KAPELYAN
07/14/2026
Special inspection requirement — Final
SOFIA KAPELYAN
07/14/2026
Special inspection requirement — Mechanical Systems
SOFIA KAPELYAN
07/14/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
SOFIA KAPELYAN
07/09/2026
Filed — Alteration
Application filed for the modification and installation of existing HVAC system. Filed in conjunction with both ALT CO DOB NOW # B00820529-I1 and B01195242-I1 (GC). No change in use, egress or occupancy.
B01202528-P1
07/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Bader
07/02/2026
Permit issued — General Construction
B01343436-I1-GC
06/29/2026
Permit issued — General Construction
B01390730-I1-GC
06/29/2026
Special inspection requirement — Mechanical Systems
SOFIA KAPELYAN
06/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/29/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
SOFIA KAPELYAN
06/29/2026
Special inspection requirement — Final
SOFIA KAPELYAN
06/29/2026
Special inspection requirement — High Temperature Hot Water Piping (Welding)
SOFIA KAPELYAN
06/24/2026
Cycle 9 facade report submitted
06/24/2026
Objection raised — Other
06/24/2026
Objection raised — Other
06/23/2026
Cycle 9 facade report signed — UNSAFE
06/22/2026
Permit issued — General Construction
B01358320-I1-GC
06/18/2026
Filed — Alteration
Application filed for the modification and installation of existing HVAC system. Filed in conjunction with both ALT CO DOB NOW # B00820529-I1 and B01195242-I1 (GC). No change in use, egress or occupancy.
B01202528-S1
06/18/2026
Permit issued — General Construction
B01195242-I1-GC
06/15/2026
Filed — Alteration
Renovate Apt 50/5 fl;, Work includes general construction, removal & construction of interior non-load bearing partitions & related finishes; total apt sf is 940, areas of work is 315 sf. Sub Doc filed for PL. No change to use, egress or occupancy.
B01340760-P1
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/15/2026
Special inspection requirement — Post-installed Anchors
JEFF AKERMAN
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Bader
06/12/2026
Objection resolved — Addressed
06/10/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2026
Objection raised — Admin
06/08/2026
Objection raised — Fire_Protection
06/08/2026
Objection raised — Structural
06/08/2026
Objection raised — Accessibility
06/08/2026
Objection raised — Fire_Protection
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ST GEORGE TOWER GRILL OWNERS C46309/19/2026
ST.GEORGE TOWER & GRILL OWNERS1103/22/2026
CEPRINE CONST INC203/22/2026
ST. GEORGE TOWER103/22/2026
NOEL SHAW ALPHA DESIGN NY103/22/2026
& RACQUETBALL ASSOCIATES,103/22/2026
CEPRINE CONSTRUCTION203/22/2026
AKAM ASSOCIATES303/22/2026
18 MERCER EQUITY203/22/2026
JMPB ENTERPRISES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MALCON CONSTRUCTION CORPGeneral Contractor2707/08/2026
CEPRINE CONSTRUCTION INCGeneral Contractor1408/07/2026
SPIREPLAST, CORPGeneral Contractor907/08/2026
NICE PLUMBING CORPPlumbing907/08/2026
ADELPHI RESTORATION CORPGeneral Contractor707/08/2026
DHS FRACO LLCGeneral Contractor707/08/2026
L.V. REMODELING LLCGeneral Contractor507/08/2026
CARA PLUMBING GROUP INCPlumbing509/03/2026
QUALITY BUILDING CONSTRUTIONGeneral Contractor404/09/2026
AJET CONTRACTING CORPGeneral Contractor407/08/2026
WILMAN CUSTOM DESIGN.LLCGeneral Contractor407/08/2026
M.N.C. GENERAL CONTR CORPGeneral Contractor407/08/2026
MIKE'S CUSTOM INSTALLATGeneral Contractor407/08/2026
G&B PLUMBING&HEATING CORPPlumbing407/08/2026
HOMEPRO GENERAL CONTRACTINGGeneral Contractor303/21/2026
GILD RENOVATION LLCGeneral Contractor303/21/2026
CONSTRUCTION XPERT INCGeneral Contractor303/21/2026
BUDGET CONSTRUCTION INCGeneral Contractor303/21/2026
MCKENNA, KERWINElectrical203/21/2026
GJ PLUMBING LLCPlumbing207/08/2026
MARTINEZ, JOSEElectrical203/21/2026
REDLINE ELECTRIC INCElectrical203/22/2026
A&M BUILDING REMODELINGGeneral Contractor206/28/2026
DIAMOND ERA CONSTR. INCGeneral Contractor203/21/2026
MLS ELECTRIC LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIA INSPECTIONS LLC7306907/09/2026
H. A. BADER CONSULTANTS2332306/15/2026
SPECIAL TESTING & CONSULT16881005/27/2026
MICHAEL HOUSE ARCHITECT,7910105/13/2026
JSPECS,INC9429105/04/2026
LOMBARDO PROF ENGINEERING8566102/04/2026
AUTOGRAPHIC CO1579310/23/2025
PIRO STUDIO LLC7503410/15/2025
QUALITY TESTING, LLC7344107/31/2025
SAHARAT SURATTANONT ARCHI1779203/03/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedZ S NY IMPROVEMENT CORP09/18/2026
DOB NOWPlumbingPermit IssuedTOP PLUMBING AND HEATING09/17/2026
DOB NOWPlumbingPermit IssuedCARA PLUMBING GROUP INC09/02/2026
DOB NOWPlumbingPermit IssuedCARA PLUMBING GROUP INC09/02/2026
DOB NOWGeneral ConstructionPermit IssuedGN HOME IMPROVEMENT CORP08/31/2026
DOB NOWPlumbingPermit IssuedALMA PLBG SPRINKLER INC08/19/2026
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC08/06/2026
DOB NOWGeneral ConstructionPermit IssuedSHL BUILDERS INC07/02/2026
DOB NOWGeneral ConstructionPermit IssuedMLZ GENERAL CONSTRUCTION06/29/2026
DOB NOWGeneral ConstructionPermit IssuedA&M BUILDING REMODELING06/22/2026
DOB NOWGeneral ConstructionPermit IssuedM.N.C. GENERAL CONTR CORP06/18/2026
DOB NOWPlumbingSigned-offPFL MECHANICAL CORP05/27/2026
DOB NOWGeneral ConstructionPermit IssuedOVERALL RENOVATION INC05/20/2026
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC05/12/2026
DOB NOWGeneral ConstructionPermit IssuedA&M BUILDING REMODELING04/24/2026
DOB NOWPlumbingPermit IssuedNICE PLUMBING CORP04/10/2026
DOB NOWGeneral ConstructionPermit IssuedSPIREPLAST, CORP04/02/2026
DOB NOWGeneral ConstructionSigned-offQUALITY BUILDING CONSTRUT03/23/2026
DOB NOWSupported ScaffoldPermit IssuedDYNAMIC HOISTING SCAFF IN02/19/2026
DOB NOWSuspended ScaffoldSigned-offQUALITY BLDG CONSTRUCTION02/05/2026
DOB NOWGeneral ConstructionPermit IssuedMNC GENERAL CONTR CORP01/28/2026
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC01/23/2026
DOB NOWPlumbingSigned-offG. ROLLINS PLBG & HTG LLC01/20/2026
DOB NOWStructuralPermit IssuedMNC GENERAL CONTR CORP11/13/2025
DOB NOWSupported ScaffoldPermit IssuedDHS FRACO11/06/2025
DOB NOWPlumbingPermit IssuedR & S PLUMBING & HTG INC10/22/2025
DOB NOWMechanical SystemsPermit IssuedGAMCNY10/22/2025
DOB NOWMechanical SystemsPermit IssuedFOUNDATIONS INTERIOR DESI09/09/2025
DOB NOWPlumbingSigned-offNICE PLUMBING CORP09/05/2025
DOB NOWPlumbingPermit IssuedPRIME PLMBG & HTG OF NY09/05/2025
DOB NOWPlumbingPermit IssuedPRIME PLMBG & HTG OF NY09/05/2025
DOB NOWGeneral ConstructionSigned-offSPIREPLAST, CORP08/25/2025
DOB NOWStructuralSigned-offMALCON CONSTRUCTION CORP08/05/2025
DOB NOWPlumbingSigned-offTVS MECHANICAL CORP07/16/2025
DOB NOWSupported ScaffoldPermit IssuedCEPRINE CONSTRUCTION INC07/15/2025
DOB NOWSuspended ScaffoldPermit IssuedQUALITY BLDG CONSTRUCTION06/17/2025
DOB NOWGeneral ConstructionPermit IssuedMNC GENERAL CONTR CORP06/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offDHS FRACO05/29/2025
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC05/16/2025
DOB NOWSuspended ScaffoldPermit IssuedQUALITY BLDG CONSTRUCTION05/12/2025
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 57
DateTypeResultReport
08/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/11/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 57.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/16/2026Final—progress
07/14/2026High Temperature Hot Water Piping (Welding)SOFIA KAPELYANspecial
07/14/2026Tenant Protection Plan Compliance—special
07/14/2026FinalSOFIA KAPELYANprogress
07/14/2026Exhaust and Vent Systems in Plenums and DuctsSOFIA KAPELYANspecial
07/14/2026Mechanical SystemsSOFIA KAPELYANspecial
07/06/2026Fire-Resistant Penetrations and JointsHoward Baderspecial
06/29/2026Tenant Protection Plan Compliance—special
06/29/2026Exhaust and Vent Systems in Plenums and DuctsSOFIA KAPELYANspecial
06/29/2026High Temperature Hot Water Piping (Welding)SOFIA KAPELYANspecial
06/29/2026Mechanical SystemsSOFIA KAPELYANspecial
06/29/2026FinalSOFIA KAPELYANprogress
06/15/2026Tenant Protection Plan Compliance—special
06/15/2026Fire-Resistant Penetrations and JointsHoward Baderspecial
06/15/2026Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
06/15/2026Post-installed AnchorsJEFF AKERMANspecial
06/03/2026Tenant Protection Plan Compliance—special
05/28/2026Fire-Resistant Penetrations and Joints—special
05/28/2026Interior lighting power—energy_progress
05/28/2026Lighting in dwelling units—energy_progress
05/28/2026Fire-Resistance Rated Construction—progress
05/28/2026Energy Code Compliance Inspections—progress
05/22/2026Lighting in dwelling units—energy_progress
05/22/2026Tenant Protection Plan Compliance—special
05/22/2026Energy Code Compliance Inspections—progress
Latest 25 of 150.
▾Documents — 2,415 on file (BIS + DOB NOW)
▸Plans & Drawings103
▸DOB NOWPlans/Sketch90
09/03/2026B01402242-I1Request digital key ↗
09/01/2026B00472631-I1Request digital key ↗
09/01/2026B00513178-I1Request digital key ↗
Showing 3 of 90 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/02/2026B00187496-I1Request digital key ↗
09/02/2026B00297423-I1Request digital key ↗
09/02/2026B00317440-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026B00348130-I1Request digital key ↗
09/02/2026B00323046-I1Request digital key ↗
09/02/2026B00410347-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00472631-I1Request digital key ↗
09/01/2026B00470422-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00323057-I1Request digital key ↗
▸Applications & Permits479
▸BISWORK PERMIT APPLICATION198
07/09/2025321589438Open ↗
07/17/2023340724808Open ↗
06/12/2023340721776Open ↗
Showing 3 of 198 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION178
08/04/2023340721776Open ↗
08/02/2023340721776Open ↗
08/01/2023321589438Open ↗
Showing 3 of 178 on file for this type
▸DOB NOWLPC Approval/Permit82
09/03/2026B01402242-I1Open ↗
09/02/2026B00410347-I1Open ↗
09/01/2026B00579521-I1Open ↗
Showing 3 of 82 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPLACE OF ASSEMBLY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications539
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION219
10/07/2021321444932Open ↗
Showing 1 of 219 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature99
09/02/2026B00410347-I1Open ↗
09/02/2026B00410750-I1Open ↗
09/01/2026B00472631-I1Open ↗
Showing 3 of 99 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature63
09/06/2026B01077019-I1Open ↗
09/05/2026B01202702-I1Open ↗
09/05/2026B01202702-I1Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWProgress Inspector Seal & Signature63
09/06/2026B01077019-I1Open ↗
09/06/2026B01077019-I1Open ↗
09/06/2026B01077019-I1Open ↗
Showing 3 of 63 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment110
▸BISSELF-CERT PLUMBING NOTICE40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISSCHEDULE B - PLUMBING33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISEQUIPMENT USE PERMITS7
11/26/2021321444932Open ↗
11/26/2021321444932Open ↗
11/26/2021321444932Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
11/26/2021321444932Open ↗
11/10/2021321444932Open ↗
Showing 2 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection46
▸BISTenant Protection Plan and Notes31
06/14/2023321749355Open ↗
11/05/2021320492301Open ↗
Showing 2 of 31 on file for this type
▸DOB NOWTenant Protection Plan11
09/02/2026B00410347-I1Open ↗
Showing 1 of 11 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Tree Checklist2
08/27/2026B00820529-P1Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos173
▸DOB NOWDEP ACP-5: Asbestos Assessment Report76
09/30/2026B01412148-I1Open ↗
09/03/2026B01402242-I1Open ↗
09/01/2026B00472631-I1Open ↗
Showing 3 of 76 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/24/2026B00975714-S1Open ↗
Showing 1 of 8 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)5
07/13/2023340724808Open ↗
04/06/2023340721776Open ↗
Showing 2 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance162
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS70
10/07/2021321444932Open ↗
Showing 1 of 70 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS34
05/25/2022321731060Open ↗
12/14/2021321731060Open ↗
11/12/2021321444932Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY25
11/30/2022322037461Open ↗
06/16/2022321731060Open ↗
05/25/2022321731060Open ↗
Showing 3 of 25 on file for this type
▸BISTR8: Energy Code Progress Inspections10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
08/31/2026B00677641-I1Open ↗
Showing 1 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
12/13/2023320492301Open ↗
11/30/2022322037461Open ↗
03/25/2022321999931Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
12/13/2023320492301Open ↗
11/30/2022322037461Open ↗
03/25/2022321999931Open ↗
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISNYCECC EXEMPTION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports56
▸BISTECHNICAL REPORT: RESPONSIBILITY50
06/23/2025321589438Open ↗
07/13/2023340724808Open ↗
04/06/2023340721776Open ↗
Showing 3 of 50 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
12/13/2023320492301Open ↗
11/30/2022322037461Open ↗
03/25/2022321999931Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
06/23/2025321589438Open ↗
11/30/2022322037461Open ↗
03/25/2022321999931Open ↗
▸Approvals, Objections & Sign-offs310
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST100
12/09/2022322037461Open ↗
06/17/2022321731060Open ↗
04/12/2022321999931Open ↗
Showing 3 of 100 on file for this type
▸BISLANDMARKS APPROVAL94
12/18/2020340724808Open ↗
Showing 1 of 94 on file for this type
▸BISADMINISTRATIVE OBJECTIONS52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION41
11/08/2021321731060Open ↗
Showing 1 of 41 on file for this type
▸BISLANDMARKS SIGNOFF10
12/02/2022322037461Open ↗
04/12/2022321999931Open ↗
03/21/2022321789178Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFINAL4
12/13/2023320492301Open ↗
11/30/2022322037461Open ↗
03/25/2022321999931Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWLandmark Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership162
▸BISCOST AFFIDAVIT155
12/06/2022322037461Open ↗
12/06/2022322037461Open ↗
11/30/2022322037461Open ↗
Showing 3 of 155 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
11/30/2022322037461Open ↗
04/11/2022321999931Open ↗
03/18/2022321789178Open ↗
Showing 3 of 5 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms178
▸BISEFILING COVER SHEET75
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 75 on file for this type
▸BISADDITIONAL INFORMATION62
07/26/2023340721776Open ↗
10/20/2022322037461Open ↗
02/16/2022340724808Open ↗
Showing 3 of 62 on file for this type
▸BISBOROUGH INTAKE FORM30
03/03/2021322037461Open ↗
03/03/2021322037461Open ↗
Showing 2 of 30 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Other Documents47
▸DOB NOWProof of Historic Building19
08/29/2026B00736849-I1Open ↗
08/27/2026B00820529-P1Open ↗
Showing 2 of 19 on file for this type
▸DOB NOWDHCR Document7
08/29/2026B00736849-I1Open ↗
Showing 1 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
03/17/2022321589438Open ↗
02/03/2021302185427Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWManufacturer's Specifications5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWCalculations5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProperty Ownership Certification2
08/27/2026B00820529-P1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHydrostatic Pressure Test1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type