← Back
BuildNYC
Two stories - detached, small or mid-size
44 TILLMAN STREET
STATEN ISLAND · BIN 5017636
💬 Discuss this project
1950Year Built
1.5Stories
A1Building Class
R3-1Zoning
1,866 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Two stories - detached, small or mid-size · 4,000 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Attic5p · 1 filing · 12 docs
Floor 215p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
Site & exterior2p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ryan Design Architecture612/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Largime Mujovic103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ultra General ContractingScaffold407/08/2026
Ultra General ContractingGeneral Contractor307/08/2026
Ultra General Contractingspecialty_contractor203/21/2026
Fine MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Design Architecture7159212/30/2025
Building Lifecycle
10/15/2026
Signed off — Alteration
mechanical work as per plans submitted herewith
S01339404-I1
03/31/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PLUMBING WORK PER PLANS
S00904923-S3
03/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/11/2026
Special inspection requirement — Fenestration air leakage
71 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offUltra General Contracting02/05/2026
DOB NOWCurb CutSigned-offUltra General Contracting02/19/2025
DOB NOWGeneral ConstructionPermit IssuedUltra General Contracting09/30/2024
DOB NOWConstruction FenceSigned-offUltra General Contracting09/30/2024
DOB NOWPlumbingPermit IssuedFine Mechanical09/18/2024
DOB NOWGeneral ConstructionPermit IssuedUltra General Contracting06/11/2024
DOB NOWConstruction FenceSigned-offUltra General Contracting11/28/2023
DOB NOWConstruction FenceSigned-offUltra General Contracting08/31/2023
1 project · most recent 12/30/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
12/30/2025Signed-offUltra General ContractingHeating and Air Conditioning Systems
1 project · most recent 10/14/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/14/2025Permit IssuedFine MechanicalGas, Water/Sanitary
1 project · most recent 10/30/2024
General Wiring
FiledStatusContractorScope
10/30/2024CompleteM & M Control WiringGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/12/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/31/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
02/11/2026Fenestration air leakage—energy_progress
02/11/2026Air barrier — testing —energy_progress
02/11/2026Fenestration areas—energy_progress
02/11/2026Permanent certificate—energy_progress
02/11/2026Insulation placement and R values—energy_progress
02/11/2026Air barrier - visual inspection—energy_progress
02/11/2026Fenestration and door U-factor and product ratings—energy_progress
12/30/2025Energy Code Compliance InspectionsDaniel Ryanprogress
12/30/2025Chimneys and ventsDaniel Ryanspecial
12/23/2025FinalDaniel Ryanprogress
12/23/2025Fire-Resistant Penetrations and JointsDaniel Ryanspecial
12/23/2025Mechanical SystemsDaniel Ryanspecial
12/23/2025Ventilation and air distribution systemDaniel Ryanenergy_progress
12/23/2025HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
12/23/2025HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
12/23/2025HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
10/27/2025HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
10/27/2025Energy Code Compliance InspectionsDaniel Ryanprogress
10/27/2025Maintenance informationDaniel Ryanenergy_progress
10/27/2025HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
10/27/2025HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
05/31/2025HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
05/31/2025Energy Code Compliance InspectionsDaniel Ryanprogress
05/31/2025Maintenance informationDaniel Ryanenergy_progress
05/31/2025HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
Latest 25 of 31.
62 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account