← Back
Condo, residential unit in 2-10 unit building
44 WEST 76 STREET
MANHATTAN · BIN 1076227
💬 Discuss this project
1889Year Built
4Stories
R1Building Class
R8BZoning
8,010 sfGross Floor Area
6Units
Rent Stabilized0 Open Violations
Condo, residential unit in 2-10 unit building · Owner of record: ANDREW L PETTIT PC · 2,043 sf lot · 3.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof5p · 2 filings · 20 docs
Penthouse1p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 11 docs
Basement2p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
44 WEST 76 CONDOMINIUM203/21/2026
44 WEST 76 STREET CONDOMINIUM403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEXUS CONSULTING NYC, INC1003/21/2026
AGOUTI CONSTRUCTION CONSULTING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MIGUEL ESTRADAGeneral Contractor1407/08/2026
P.S.I. MECHANICALPlumbing507/08/2026
PHOENIX SUTTON STR INCGeneral Contractor307/08/2026
MIGUEL ESTRADAGeneral Contractor203/21/2026
STANISLAW WISZKOWSKIElectrical103/21/2026
ALL MAKES HTG & A/C CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678308/22/2025
STUDIO NYANDAK ARCHITECTU8378207/26/2023
Building Lifecycle
All (112)Filed (12)Permit Issued (11)Signed Off (7)Violation (33)Inspection (3)Objection (24)Special Inspection (22)
05/20/2026
Signed off — Alteration
Modification of plumbing system in existing apartment #PH6, as per plans filed herewith. No change in use, egress or occupancy.
M00686724-S1
05/11/2026
Signed off — Alteration
Modification of plumbing system in existing apartment #PH6, as per plans filed herewith. No change in use, egress or occupancy.
M00686724-S2
05/08/2026
Signed off — Alteration
Modification of plumbing system in existing apartment #PH6, as per plans filed herewith. No change in use, egress or occupancy.
M00686724-I1
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
09/11/2025
Special inspection requirement — Mechanical Systems
Ari Kamo
09/11/2025
Special inspection requirement — Final
Ari Kamo
08/22/2025
Filed — Alteration
Modification of plumbing system in existing apartment #PH6, as per plans filed herewith. No change in use, egress or occupancy.
M00686724-P2
08/13/2025
Special inspection requirement — Mechanical Systems
Ari Kamo
08/13/2025
Special inspection requirement — Final
Ari Kamo
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
06/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/08/2025
Permit issued — General Construction
M00686724-I1-GC
02/18/2025
Permit issued — Plumbing
M00686724-S1-PL
02/11/2025
Permit issued — General Construction
M00686724-I1-GC
11/22/2024
Violation issued (HPD, closed)
I
05/21/2024
Filed — Alteration
Repair to rear yard fence. All in accordance with submitted plans. No changes to use, egress or occupancy under this application.
M01049902-I1
05/15/2024
Signed off — Alteration
Alt2 for exterior work on the 1st, 2nd and 3rd floors. All in accordance with submitted plans. No changes to use, egress or occupancy under this application.
M00952787-I1
05/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/11/2024
Special inspection requirement — Final
Yevgeniya Peysin
05/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/02/2024
Special inspection requirement — Final
Yevgeniya Peysin
04/30/2024
Signed off — Alteration
Herewith filing new alt2 for exterior work to Penthouse Duplex unit on the 3rd, 4th and roof level. All in accordance with submitted plans. No changes to use, egress or occupancy under this application.
M08044257-I1
04/29/2024
Permit issued — Mechanical Systems
M00686724-S2-MS
04/29/2024
Objection raised — Admin
04/29/2024
Objection resolved — Addressed
04/29/2024
Objection raised — Other
04/29/2024
Objection resolved — Addressed
04/26/2024
Signed off — Alteration
Herewith filing new alt2 for exterior work to Penthouse Duplex unit on the 3rd, 4th and roof level. All in accordance with submitted plans. No changes to use, egress or occupancy under this application.
M08044257-S1
04/19/2024
Filed — Alteration
Alt2 for exterior work on the 1st, 2nd and 3rd floors. All in accordance with submitted plans. No changes to use, egress or occupancy under this application.
M00952787-P1
04/01/2024
Violation issued (HPD, closed)
A
03/22/2024
Filed — Alteration
Modification of plumbing system in existing apartment #PH6, as per plans filed herewith. No change in use, egress or occupancy.
M00686724-P1
03/20/2024
Permit issued — Plumbing
M00686724-S1-PL
02/22/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00909019-I1
01/23/2024
Permit issued — General Construction
M00686724-I1-GC
11/24/2023
Permit issued — General Construction
M00952787-I1-GC
11/21/2023
Objection resolved — Addressed
11/21/2023
Objection resolved — Addressed
11/16/2023
Objection resolved — Addressed
11/16/2023
Objection resolved — Addressed
11/15/2023
Violation issued (HPD, closed)
I
11/06/2023
Objection raised — Energy
11/06/2023
Objection raised — Other
11/06/2023
Objection raised — Mechanical
11/06/2023
Objection raised — Scope
11/01/2023
Filed — Alteration
Alt2 for exterior work on the 1st, 2nd and 3rd floors. All in accordance with submitted plans. No changes to use, egress or occupancy under this application.
M00952787-I1
10/11/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00909019-P1
09/07/2023
Permit issued — Structural
M08044257-S1-ST
08/22/2023
Objection raised — Other
08/22/2023
Objection resolved — Addressed
08/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
TENZIN NYANDAK
08/01/2023
Permit issued — General Construction
M08044257-I1-GC
07/26/2023
Filed — Alteration
Herewith filing new alt2 for exterior work to Penthouse Duplex unit on the 3rd, 4th and roof level. All in accordance with submitted plans. No changes to use, egress or occupancy under this application.
M08044257-S1
07/26/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00909019-I1
07/26/2023
Permit issued — Sidewalk Shed
M00909019-I1-SH
07/26/2023
Permit issued — Supported Scaffold
M00909019-I1-SF
07/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
TENZIN NYANDAK
07/18/2023
Special inspection requirement — Structural Steel - Details
TENZIN NYANDAK
07/18/2023
Special inspection requirement — Structural Cold-Formed Steel
TENZIN NYANDAK
07/18/2023
Special inspection requirement — Structural Steel - High Strength Bolting
TENZIN NYANDAK
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMIGUEL ESTRADA04/08/2025
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL02/18/2025
DOB NOWGeneral ConstructionSigned-offMIGUEL ESTRADA02/11/2025
DOB NOWMechanical SystemsSigned-offALL MAKES HTG & A/C CORP04/29/2024
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL03/20/2024
DOB NOWGeneral ConstructionSigned-offMIGUEL ESTRADA01/23/2024
DOB NOWGeneral ConstructionSigned-offMIGUEL ESTRADA11/24/2023
DOB NOWStructuralSigned-offMIGUEL ESTRADA09/07/2023
DOB NOWGeneral ConstructionSigned-offMIGUEL ESTRADA08/01/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC07/26/2023
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC07/26/2023
BISOTISSUEDELRAY CONSTRUCTION CORP09/23/2021
BISEQISSUEDEVEREST SCAFFOLDING INC11/21/2014
BISOTISSUEDBURDA CONSTRUCTION CORP09/25/2007
BISEQISSUEDEVEREST SCAFFOLDING INC10/07/2005
BISOTISSUEDEVEREST SCAFFOLDING INC10/07/2005
3 projects · most recent 02/21/2024
General Wiring
FiledStatusContractorScope
02/21/2024Permit IssuedAE ELECTRIC INCGeneral Wiring
07/19/2023CompleteELPO ELECTRICAL CONTG INC—
03/19/2021CompleteTESLA ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
09/11/2025Fire-Resistant Penetrations and JointsAri Kamospecial
09/11/2025Mechanical SystemsAri Kamospecial
09/11/2025FinalAri Kamoprogress
08/13/2025Mechanical SystemsAri Kamospecial
08/13/2025FinalAri Kamoprogress
08/13/2025Fire-Resistant Penetrations and JointsAri Kamospecial
05/13/2024Tenant Protection Plan Compliance—special
05/11/2024FinalYevgeniya Peysinprogress
05/02/2024FinalYevgeniya Peysinprogress
08/22/2023Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
07/19/2023Tenant Protection Plan ComplianceTENZIN NYANDAKspecial
07/18/2023Structural Steel - DetailsTENZIN NYANDAKspecial
07/18/2023Structural Cold-Formed SteelTENZIN NYANDAKspecial
07/18/2023Structural Steel - High Strength BoltingTENZIN NYANDAKspecial
07/18/2023Structural Steel - WeldingTENZIN NYANDAKspecial
07/17/2023FinalDominic Cullenprogress
01/19/2023Construction Operations Influencing Adjacent StructuresTENZIN NYANDAKspecial
01/19/2023Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
12/15/2022Tenant Protection Plan ComplianceTENZIN NYANDAKspecial
11/22/2022FinalYevgeniya Peysinprogress
02/25/2022Fire-Resistant Penetrations and JointsAri Kamospecial
02/24/2022FinalALLEGRA KOCHMANprogress
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/01/2026M00686724-S1Request digital key ↗
09/01/2026M00686724-S2Request digital key ↗
09/01/2026M00686724-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit9
08/13/2026M08044257-S1Open ↗
08/13/2026M08044257-I1Open ↗
08/13/2026M00952787-I1Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION2
09/23/2021140966453Open ↗
11/20/2014140283182Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
02/04/2021140966453Open ↗
11/20/2014140283182Open ↗
▸Seals & Professional Certifications36
▸DOB NOWSpecial Inspector Seal & Signature12
09/29/2026M00686724-I1Open ↗
09/02/2026M08044257-S1Open ↗
09/02/2026M08044257-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026M00686724-S1Open ↗
09/01/2026M00686724-P1Open ↗
09/01/2026M00686724-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/29/2026M00686724-I1Open ↗
09/02/2026M08044257-S1Open ↗
09/01/2026M00686724-S2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/04/2021140966453Open ↗
11/20/2014140283182Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/10/2015140283182Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/20/2014140283182Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/20/2014140283182Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/04/2021140966453Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
09/23/2021140966453Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/01/2026M00686724-I1Open ↗
09/01/2026M00686724-P1Open ↗
09/01/2026M00686724-S2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/20/2014140283182Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/04/2021140966453Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
02/16/2021140966453Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/05/2022140966453Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/05/2022140966453Open ↗
02/04/2021140966453Open ↗
02/04/2021140966453Open ↗
Showing 3 of 4 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/01/2021140966453Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/06/2022140966453Open ↗
09/10/2015140283182Open ↗
▸BISLANDMARKS APPROVAL2
03/01/2021140966453Open ↗
11/20/2014140283182Open ↗
▸BISFINAL1
03/01/2021140966453Open ↗
▸BISLANDMARKS SIGNOFF1
01/06/2022140966453Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
01/05/2022140966453Open ↗
02/04/2021140966453Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
03/01/2021140966453Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
02/04/2021140966453Open ↗
11/20/2014140283182Open ↗
▸BISADDITIONAL INFORMATION2
04/16/2021140966453Open ↗
03/01/2021140966453Open ↗
▸Other Documents6
▸DOB NOWProof of Historic Building3
08/13/2026M00952787-I1Open ↗
08/13/2026M00686724-I1Open ↗
08/13/2026M00952787-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/01/2021140966453Open ↗
02/04/2021140966453Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M08044257-S1Open ↗