← Back
BuildNYC
Converted dwellings or rooming house
44 WEST 94TH STREET
MANHATTAN · BIN 1031661
💬 Discuss this project
1888Year Built
3Stories
C5Building Class
R7-2Zoning
3,837 sfGross Floor Area
8Units
Rent Stabilized2 Active Violations ▸
Converted dwellings or rooming house · 1,717 sf lot · 2.23 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof9p · 1 filing · 14 docs
Floor 37p · 1 filing · 14 docs
Floor 27p · 1 filing · 14 docs
Floor 17p · 1 filing · 14 docs
Cellar5p · 2 filings · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering307/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RB Heating Consulting Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maxwell Plumbing Mechanicalspecialty_contractor203/21/2026
Alafogiannis Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808207/17/2026
Building Lifecycle
All (34)Filed (3)Permit Issued (2)Signed Off (2)Violation (23)Special Inspection (4)
07/17/2026
Filed — Alteration
REMOVE EXISTING GAS BOILER AND AIR HANDLER WITH ONE MULTI SPLIT HEAT PUMP UNIT PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00406955-P1
07/17/2026
Signed off — Alteration
M00419676-I1
07/17/2026
Signed off — Alteration
REMOVE EXISTING GAS BOILER AND AIR HANDLER WITH ONE MULTI SPLIT HEAT PUMP UNIT PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00406955-I1
07/17/2026
Special inspection requirement — Mechanical Systems
Joseph Bazini
07/17/2026
Special inspection requirement — Final
Joseph Bazini
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/17/2021
Special inspection requirement — Mechanical Systems
Joseph Bazini
02/17/2021
Special inspection requirement — Final
Joseph Bazini
11/20/2020
Filed — Alteration
M00419676-I1
11/20/2020
Filed — Alteration
REMOVE EXISTING GAS BOILER AND AIR HANDLER WITH ONE MULTI SPLIT HEAT PUMP UNIT PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00406955-I1
11/20/2020
Permit issued — Mechanical Systems
M00406955-I1-MS
11/20/2020
Permit issued — Plumbing
M00419676-I1-PL
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2018
Violation issued (HPD, open)
B
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/01/2017
Violation issued (HPD, open)
B
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/04/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMaxwell Plumbing Mechanical11/20/2020
DOB NOWPlumbingSigned-offAlafogiannis Plumbing & Heating11/20/2020
BISPLISSUEDS.O.S. Plumbing & Heating02/06/1998
BIS—ISSUEDThomas R Donnelly Construction01/27/1998
BISOTISSUEDThomas R Donnelly Construction01/06/1998
1 project · most recent 07/17/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2026Signed-offMaxwell Plumbing MechanicalHeating Systems
Cooling
Daikin FXMQ12PBVJU 450 CFM · Vrf Indoor ×8
RXYQ120XATJA 10 tons · Vrf Outdoor ×1
Heating
Daikin FXMQ12PBVJU 450 CFM · Vrf Indoor ×8
RXYQ120XATJA 10 tons · Vrf Outdoor ×1
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/17/2026Mechanical SystemsJoseph Bazinispecial
07/17/2026FinalJoseph Baziniprogress
02/17/2021Mechanical SystemsJoseph Bazinispecial
02/17/2021FinalJoseph Baziniprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00406955-I1Request digital key ↗
09/04/2026M00406955-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00419676-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
09/04/2026M00406955-I1Open ↗
08/13/2026M00419676-I1Open ↗
08/13/2026M00406955-P1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/04/2026M00419676-I1Open ↗
09/04/2026M00406955-I1Open ↗
08/13/2026M00406955-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026M00406955-P1Open ↗
08/28/2026M00406955-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M00406955-P1Open ↗
08/28/2026M00406955-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
09/04/2026M00406955-I1Open ↗
08/13/2026M00419676-I1Open ↗
08/13/2026M00406955-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/04/2026M00419676-I1Open ↗
09/04/2026M00406955-I1Open ↗
08/13/2026M00406955-P1Open ↗