← Back
Miscellaneous two family
440 62 STREET
BROOKLYN · BIN 3143950
💬 Discuss this project
1915Year Built
2Stories
B9Building Class
R6BZoning
2,176 sfGross Floor Area
2Units
Miscellaneous two family · 2,000 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Basement9p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FACTORY ENGINEERING WORKS PLLC806/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KON HO LEE CONSULTING ENGINEER PLL1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor307/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FACTORY ENGINEERING WORKS8855806/25/2024
Building Lifecycle
All (50)Filed (8)Permit Issued (3)Signed Off (2)Inspection (6)Objection (12)Special Inspection (19)
10/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/24/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/09/2024
Special inspection requirement — Fenestration areas
Kui He
07/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Kui He
07/09/2024
Special inspection requirement — Concrete - Cast-In-Place
Kui He
07/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kui He
07/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kui He
07/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Kui He
07/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
Kui He
07/09/2024
Special inspection requirement — Interior lighting power
Kui He
07/09/2024
Special inspection requirement — Fenestration air leakage
Kui He
07/09/2024
Special inspection requirement — Lighting controls
Kui He
07/02/2024
Objection resolved — Addressed
07/01/2024
Objection raised — Other
06/25/2024
Filed — Alteration CO
CONVERT BASEMENT INTO A HABITABLE SAPCE FOR 1ST FLOOR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00885865-P2
05/31/2024
Signed off — Alteration
RELOCATE(1)STOVE,(1)SINK &(2)3-PC BATHROOM AT 1ST FL.RELOCATE(1)STOVE,(1)SINK &(1)3-PC BATHROOM;INSTALL(1)3-PC BATHROOM AT 2ND FL.REMOVE (1)W.C.,(1)LAV.,(1)H.W.H. &(1)BOILER;INSTALL(2)WATER CLOSET,(2)LAVATORY,(2)SHOWER,(1)F.D. &(2)COMBINED BOILER IN BAS.
B00893193-I1
05/30/2024
Signed off — Alteration
Interior renovation at existing Cellar, 1st and 2nd floor. No change in use, occupancy or egress.
B00917829-I1
05/29/2024
Filed — Alteration
Interior renovation at existing Cellar, 1st and 2nd floor. No change in use, occupancy or egress.
B00917829-P2
05/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kui He
05/28/2024
Special inspection requirement — Final
Kui He
05/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Kui He
05/22/2024
Filed — Alteration
Interior renovation at existing Cellar, 1st and 2nd floor. No change in use, occupancy or egress.
B00917829-P1
05/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Kui He
05/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kui He
04/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/03/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/01/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/26/2023
Filed — Alteration CO
CONVERT BASEMENT INTO A HABITABLE SAPCE FOR 1ST FLOOR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00885865-P1
10/23/2023
Special inspection requirement — Energy Code Compliance Inspections
Kui He
10/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kui He
10/20/2023
Filed — Alteration
RELOCATE(1)STOVE,(1)SINK &(2)3-PC BATHROOM AT 1ST FL.RELOCATE(1)STOVE,(1)SINK &(1)3-PC BATHROOM;INSTALL(1)3-PC BATHROOM AT 2ND FL.REMOVE (1)W.C.,(1)LAV.,(1)H.W.H. &(1)BOILER;INSTALL(2)WATER CLOSET,(2)LAVATORY,(2)SHOWER,(1)F.D. &(2)COMBINED BOILER IN BAS.
B00893193-P1
10/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kui He
10/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Kui He
10/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/02/2023
Permit issued — General Construction
B00885865-I1-GC
09/26/2023
Objection resolved — Addressed
08/29/2023
Objection resolved — Addressed
08/23/2023
Permit issued — Plumbing
B00893193-I1-PL
08/21/2023
Filed — Alteration
RELOCATE(1)STOVE,(1)SINK &(2)3-PC BATHROOM AT 1ST FL.RELOCATE(1)STOVE,(1)SINK &(1)3-PC BATHROOM;INSTALL(1)3-PC BATHROOM AT 2ND FL.REMOVE (1)W.C.,(1)LAV.,(1)H.W.H. &(1)BOILER;INSTALL(2)WATER CLOSET,(2)LAVATORY,(2)SHOWER,(1)F.D. &(2)COMBINED BOILER IN BAS.
B00893193-I1
08/15/2023
Permit issued — General Construction
B00917829-I1-GC
08/14/2023
Filed — Alteration
Interior renovation at existing Cellar, 1st and 2nd floor. No change in use, occupancy or egress.
B00917829-I1
07/07/2023
Objection resolved — Addressed
07/07/2023
Objection resolved — Addressed
07/07/2023
Objection resolved — Addressed
06/28/2023
Objection raised — Scope
06/28/2023
Objection raised — Scope
06/28/2023
Objection raised — Scope
06/28/2023
Objection raised — Scope
06/28/2023
Objection raised — Scope
06/22/2023
Filed — Alteration CO
CONVERT BASEMENT INTO A HABITABLE SAPCE FOR 1ST FLOOR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00885865-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNY BUILDING ASSOCIATES IN10/02/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC08/23/2023
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN08/15/2023
3 projects · most recent 03/13/2024
General Wiring
FiledStatusContractorScope
03/13/2024CancelledKWONG MING ELECTRIC INC3 meters, 3 new_meters
09/28/2023CompleteKWONG MING ELECTRIC INC3 meters, 3 new_meters
08/24/2023CompleteINTELOGIC ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/24/2025Fail-Final CND-Occupancy InspectionFailView ↗
04/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
07/09/2024Fenestration areasKui Heenergy_progress
07/09/2024Fenestration and door U-factor and product ratingsKui Heenergy_progress
07/09/2024Concrete - Cast-In-PlaceKui Hespecial
07/09/2024Fire-Resistant Penetrations and JointsKui Hespecial
07/09/2024Structural Stability – Alterations of existing buildingsKui Hespecial
07/09/2024Energy Code Compliance InspectionsKui Heprogress
07/09/2024Fire-Resistance Rated ConstructionKui Heprogress
07/09/2024Interior lighting powerKui Heenergy_progress
07/09/2024Fenestration air leakageKui Heenergy_progress
07/09/2024Lighting controlsKui Heenergy_progress
05/28/2024Fire-Resistant Penetrations and JointsKui Hespecial
05/28/2024FinalKui Heprogress
05/28/2024Energy Code Compliance InspectionsKui Heprogress
05/22/2024Energy Code Compliance InspectionsKui Heprogress
05/22/2024Fire-Resistant Penetrations and JointsKui Hespecial
10/23/2023Energy Code Compliance InspectionsKui Heprogress
10/23/2023Fire-Resistant Penetrations and JointsKui Hespecial
10/16/2023Fire-Resistant Penetrations and JointsKui Hespecial
10/16/2023Energy Code Compliance InspectionsKui Heprogress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B00893193-P1Request digital key ↗
08/26/2026B00893193-I1Request digital key ↗
08/25/2026B00917829-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00885865-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature12
09/19/2026B00917829-P2Open ↗
09/19/2026B00917829-P2Open ↗
09/01/2026B00917829-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00893193-I1Open ↗
08/25/2026B00917829-I1Open ↗
08/25/2026B00917829-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/19/2026B00917829-P2Open ↗
09/01/2026B00917829-P1Open ↗
08/31/2026B00885865-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026B00885865-I1Open ↗
08/13/2026B00885865-P1Open ↗
08/13/2026B00885865-P2Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00885865-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00885865-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00885865-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026B00893193-I1Open ↗
08/25/2026B00917829-I1Open ↗
08/25/2026B00917829-P2Open ↗
Showing 3 of 8 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/24/2026B00885865-P1Open ↗
08/24/2026B00885865-I1Open ↗
08/14/2026B00885865-P2Open ↗