← Back
Office with commercial, 7-19 stories
Harding Building
440 9 AVENUE · BIN 1013562
💬 Discuss this project
1927Year Built
18Stories
O6Building Class
C6-4Zoning
342,596 sfGross Floor Area
33Units
LL97 Covered0 Open ViolationsFISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 35TH & 9TH LLC · 19,634 sf lot · 17.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Roof6p · 3 filings · 20 docs
Penthouse1p · 1 filing · 13 docs
Floor 143p · 2 filings · 18 docs
Floor 13
Floor 12
Floor 114p · 2 filings · 17 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 52p · 1 filing · 8 docs
Floor 4
Floor 3
Floor 21p · 1 filing · 19 docs
Floor 11p · 2 filings · 19 docs
Mezzanine5p · 5 filings · 20 docs
Cellar3p · 3 filings · 20 docs
22 jobs · most recent 02/07/2024
General Wiring Lighting Boiler Controls HVAC Wiring
FiledStatusContractorScope
02/07/2024CompleteSRM ELECTRICAL SVC INCGeneral Wiring, Lighting
11/09/2023Permit IssuedROBERT CHIMENTI7 meters, 1 new_meters
01/22/2023CompleteSTEVEN FARKAS—
11/21/2022CompleteSRM ELECTRICAL SVC INC—
12/01/2021CompleteSRM ELECTRICAL SVC INCGeneral Wiring
11/01/2021CompleteSRM ELECTRICAL SVC INC—
08/23/2021CompleteFIU CORP DBA FIU ELECTRICGeneral Wiring
02/03/2021CompleteECO ELECTRICAL SERVCS LLC—
11/06/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
08/18/2020CompleteC & A ELECTRICAL CORPGeneral Wiring
08/11/2020CompleteSTX ELECTRICAL CORPBoiler Controls
07/09/2020CompleteAWESOME ELECTL CONTNG INCGeneral Wiring
01/17/2020CompleteECO ELECTRICAL SERVCS LLCHVAC Wiring
01/08/2020CompleteECO ELECTRICAL SERVCS LLCGeneral Wiring
01/08/2020CompleteECO ELECTRICAL SERVCS LLCGeneral Wiring
Building Lifecycle
All (214)Filed (27)Permit Issued (44)Signed Off (21)Facade (FISP) (20)Violation (60)Inspection (8)Objection (4)Special Inspection (30)
03/24/2026
Signed off — Alteration
M00861228-I1
11/10/2025
Signed off — Alteration
NEW (4) OFFICES ON THIRD & FIFTH FLOOR (EXISTING CEILING GRID, MECHANICAL SUPPLY, RETURN AND SPRINKLERS TO REMAIN) NOTE: OFFICES ON 3rd & 5th FLOOR TO BE CONSTRUCTED ON AN OPEN BULLPEN FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01251054-I1
10/31/2025
Permit issued — General Construction
M01251054-I1-GC
07/30/2025
Signed off — Alteration
INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION
M01025657-I1
07/28/2025
Signed off — Alteration
M01033024-I1
07/28/2025
Permit issued — Suspended Scaffold
M01025657-I1-SC
07/28/2025
Objection resolved — Addressed
07/25/2025
Objection raised — Zoning
07/14/2025
Filed — Alteration
NEW (4) OFFICES ON THIRD & FIFTH FLOOR (EXISTING CEILING GRID, MECHANICAL SUPPLY, RETURN AND SPRINKLERS TO REMAIN) NOTE: OFFICES ON 3rd & 5th FLOOR TO BE CONSTRUCTED ON AN OPEN BULLPEN FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01251054-I1
07/11/2025
Signed off — Alteration
M00816955-I1
07/03/2025
Special inspection requirement — Final
Robert Concessi
07/03/2025
Special inspection requirement — Interior lighting power
Robert Concessi
07/03/2025
Special inspection requirement — Lighting controls
Robert Concessi
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Concessi
04/14/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00816937-I1
02/24/2025
Cycle 9 facade report signed — SWARMP
01/29/2025
Cycle 9 facade report submitted
01/17/2025
Cycle 9 facade inspection completed
01/07/2025
Permit issued — Sidewalk Shed
M00816937-I1-SH
11/26/2024
Signed off — Alteration
Modification to existing HVAC system as per plans filed herewith. No change in use, egress, or occupancy under this application.
M01036700-I1
11/18/2024
Permit issued — General Construction
M00861228-I1-GC
08/05/2024
Violation issued (ECB, closed)
Construction
08/05/2024
Violation issued (ECB, closed)
Construction
05/28/2024
Filed — Alteration
M01033024-P1
05/28/2024
Permit issued — Mechanical Systems
M01036700-I1-MS
05/24/2024
Permit issued — Supported Scaffold
M01033024-I1-SF
05/23/2024
Filed — Alteration
Modification to existing HVAC system as per plans filed herewith. No change in use, egress, or occupancy under this application.
M01036700-I1
05/20/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
05/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
George Xerakias
05/20/2024
Special inspection requirement — Post-installed Anchors
George Xerakias
05/16/2024
Objection raised — Other
05/16/2024
Objection resolved — Addressed
05/14/2024
Filed — Alteration
INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION
M01025657-P1
05/13/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
05/13/2024
Special inspection requirement — Post-installed Anchors
George Xerakias
05/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
George Xerakias
04/22/2024
Permit issued — General Construction
M00861228-I1-GC
04/18/2024
Permit issued — Supported Scaffold
M01033024-I1-SF
04/17/2024
Filed — Alteration
M01033024-I1
04/12/2024
Permit issued — Suspended Scaffold
M01025657-I1-SC
04/09/2024
Filed — Alteration
INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION
M01025657-I1
03/14/2024
Signed off — Alteration
INSTALLATION OF DOOR AND MINOR PARTITION WORK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00982818-I1
01/29/2024
Permit issued — Sidewalk Shed
M00816937-I1-SH
01/26/2024
Permit issued — Protection and Mechanical Methods
M00816955-I1-PMM
01/25/2024
Permit issued — General Construction
M00982818-I1-GC
01/19/2024
Filed — Alteration
INSTALLATION OF DOOR AND MINOR PARTITION WORK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00982818-I1
12/28/2023
Special inspection requirement — Final
Michael Hayes
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/28/2023
Cycle 9 facade report signed — UNSAFE
07/27/2023
Cycle 9 facade report submitted
07/14/2023
Cycle 9 facade inspection completed
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/18/2023
Filed — Alteration
M00861228-I1
04/18/2023
Special inspection requirement — Final
BRIAN O'CONNOR
04/18/2023
Special inspection requirement — Masonry
BRIAN O'CONNOR
04/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN O'CONNOR
02/22/2023
Cycle 9 facade report signed — UNSAFE
02/21/2023
Cycle 9 facade report submitted
Latest 60 of 214 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SITE 6 COMMERCIAL4107/08/2026
TACONIC INVESTMENT PARTNERS1807/08/2026
TACONIC MANAGEMENT5107/08/2026
35TH & 9TH LLC103/22/2026
440 NINTH AVENUE OWNER5103/22/2026
CANIDO BASONAS CONST SVC103/22/2026
MDB DEVELOPMENT303/22/2026
SL GREEN REALTY19003/22/2026
S L GREEN REAL ESTATE603/22/2026
S L GREEN MANAGEMENT503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/20/2025$105.0M—— → —$306/sf building
12/06/2018$269.0M—— → —$785/sf building
12/18/2013$211.5M—440 NINTH AVENUE, L.P. → JOWA REAL ESTATE ONE, LLC$617/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEMS INSTAL S&SGeneral Contractor1307/08/2026
TALISEN CONSTRUCTION CORPGeneral Contractor1007/08/2026
CANIDO BASONAS CONST SVCGeneral Contractor504/09/2026
BENJAMIN CONSTRUCTION CORGeneral Contractor403/21/2026
PRACTICAL PLBG & HTG INCFire Protection307/08/2026
PJP INSTALLERS INCGeneral Contractor307/08/2026
WILLIAM C. GERAKARIS P&HPlumbing207/08/2026
CHAIM, LEZERElectrical203/21/2026
ELLIS, HERBERTElectrical203/21/2026
FIVE BOROUGH NYC LLCFire Protection207/08/2026
HAWKINS WEBB, LLCGeneral Contractor207/08/2026
VANGUARD CONSTRUCTION ANDGeneral Contractor203/21/2026
REGINA, JOSEPHElectrical103/21/2026
RUBIO, GILBEYElectrical103/21/2026
SALAZAR, PEDROElectrical103/21/2026
SERRANO, JAVIERElectrical103/21/2026
SUGARMAN, IRAElectrical103/21/2026
ACCURATE MECHANICAL INCFire Protection107/08/2026
A&P REMODELING CO INCFire Protection107/08/2026
ENOBRAC PLUMBING, INCFire Protection107/08/2026
NICE PLUMBING CORPPlumbing107/08/2026
IRENEUSZ KOTARSKIElectrical103/21/2026
TARGET PIPING NY LLCFire Protection107/08/2026
IANNACONE, FERDINANDElectrical103/21/2026
BUCH CONSTRUCTION, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCESSI ENGINEERING, P.C540307/14/2025
SYNERGY ENGINEERING7841005/23/2024
GEORGE J. XERAKIAS, PE1658205/14/2024
ROCK ARCH ENG CORP1760105/18/2023
GILSANZ MURRAY STEFICEK240402/19/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRAY BUILDERS INC10/31/2025
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR07/28/2025
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S01/07/2025
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC11/18/2024
DOB NOWMechanical SystemsSigned-offTALISEN CONSTRUCTION CORP05/28/2024
DOB NOWSupported ScaffoldSigned-offCANIDO BASONAS CONST SVC05/24/2024
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC04/22/2024
DOB NOWSupported ScaffoldSigned-offCANIDO BASONAS CONSTRUCTI04/18/2024
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR04/12/2024
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S01/29/2024
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEMS INSTAL S&S01/26/2024
DOB NOWGeneral ConstructionSigned-offBUCH CONSTRUCTION, INC01/25/2024
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S02/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEMS INSTAL S&S02/01/2023
DOB NOWStandpipeSigned-offENOBRAC PLUMBING, INC10/06/2022
DOB NOWStandpipeSigned-offPRACTICAL PLBG & HTG INC04/14/2022
DOB NOWGeneral ConstructionPermit IssuedVANGUARD CONSTRUCTION AND12/17/2021
DOB NOWStandpipeSigned-offPRACTICAL PLBG & HTG INC11/01/2021
DOB NOWPlumbingSigned-offPRACTICAL PLBG & HTG INC07/15/2021
DOB NOWStandpipeSigned-offPRACTICAL PLBG & HTG INC07/14/2021
DOB NOWStandpipeSigned-offA&P REMODELING CO INC06/07/2021
DOB NOWPlumbingSigned-offMARATHON MECHANICAL LLC05/07/2021
DOB NOWStructuralSigned-offHAWKINS WEBB, LLC02/16/2021
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC02/01/2021
DOB NOWPlumbingSigned-offWILLIAM C. GERAKARIS P&H01/12/2021
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC06/29/2020
DOB NOWMechanical SystemsSigned-offTALISEN CONSTRUCTION CORP05/05/2020
DOB NOWStructuralSigned-offTALISEN CONSTRUCTION CORP05/05/2020
DOB NOWStructuralSigned-offTALISEN CONSTRUCTION CORP05/05/2020
DOB NOWMechanical SystemsSigned-offTALISEN CONSTRUCTION CORP05/05/2020
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC03/20/2020
DOB NOWStructuralSigned-offTALISEN CONSTRUCTION CORP03/11/2020
DOB NOWMechanical SystemsSigned-offTALISEN CONSTRUCTION CORP03/11/2020
DOB NOWMechanical SystemsSigned-offHAWKINS WEBB, LLC02/25/2020
DOB NOWPlumbingSigned-offNICE PLUMBING CORP02/18/2020
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC01/15/2020
DOB NOWPlumbingSigned-offWILLIAM C. GERAKARIS P&H01/06/2020
DOB NOWPlumbingSigned-offANTHONY DISABATO12/20/2019
DOB NOWSprinklersSigned-offACCURATE MECHANICAL INC12/20/2019
DOB NOWStructuralSigned-offTALISEN CONSTRUCTION CORP12/16/2019
+ 54 more permits on file
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/20/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/22/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/19/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/05/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/02/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/02/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/02/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/21/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
07/03/2025FinalRobert Concessiprogress
07/03/2025Interior lighting powerRobert Concessienergy_progress
07/03/2025Lighting controlsRobert Concessienergy_progress
07/03/2025Fire-Resistant Penetrations and JointsRobert Concessispecial
05/20/2024Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
05/20/2024Structural Stability – Alterations of existing buildingsGeorge Xerakiasspecial
05/20/2024Post-installed AnchorsGeorge Xerakiasspecial
05/13/2024Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
05/13/2024Post-installed AnchorsGeorge Xerakiasspecial
05/13/2024Structural Stability – Alterations of existing buildingsGeorge Xerakiasspecial
12/28/2023FinalMichael Hayesprogress
04/18/2023FinalBRIAN O'CONNORprogress
04/18/2023MasonryBRIAN O'CONNORspecial
04/18/2023Structural Stability – Alterations of existing buildingsBRIAN O'CONNORspecial
10/12/2022Standpipe SystemsAlec Stronginspecial
10/12/2022Sprinkler SystemsAlec Stronginspecial
03/11/2021Structural Steel - DetailsKarl Rubenackerspecial
02/10/2021Mechanical SystemsAlec Stronginspecial
02/10/2021Post-installed AnchorsAlec Stronginspecial
02/10/2021FinalBruce Lilkerprogress
02/10/2021Concrete - Cast-In-PlaceKarl Rubenackerspecial
02/10/2021Post-installed AnchorsKarl Rubenackerspecial
02/10/2021Sprayed fire-resistant materialsAlec Stronginspecial
02/10/2021Structural Stability – Alterations of existing buildingsKarl Rubenackerspecial
02/10/2021Structural Steel - High Strength BoltingKarl Rubenackerspecial
Latest 25 of 40.
▾Documents — 2,031 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch11
09/03/2026M00632261-I1Request digital key ↗
09/01/2026M00816955-I1Request digital key ↗
08/31/2026M00816937-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/05/2026M00220023-I1Request digital key ↗
09/05/2026M00250875-I1Request digital key ↗
09/05/2026M00282951-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00250875-I1Request digital key ↗
09/05/2026M00282951-I1Request digital key ↗
09/04/2026M00248196-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/05/2026M00219976-I1Request digital key ↗
09/04/2026M00317497-I1Request digital key ↗
08/15/2026M00219976-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00219910-I1Request digital key ↗
09/05/2026M00250850-I1Request digital key ↗
08/15/2026M00219910-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
09/01/2026M00353997-P1Request digital key ↗
09/01/2026M00353997-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00152003-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00145912-I1Request digital key ↗
▸Applications & Permits395
▸BISPLAN / WORK APPROVAL APPLICATION221
10/19/2023103469462Open ↗
10/17/2023103469462Open ↗
10/12/2023103469462Open ↗
Showing 3 of 221 on file for this type
▸BISWORK PERMIT APPLICATION162
08/02/2023121929690Open ↗
07/21/2023121929690Open ↗
07/19/2023121929690Open ↗
Showing 3 of 162 on file for this type
▸BISPLACE OF ASSEMBLY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit3
08/13/2026M00317497-I1Open ↗
08/13/2026M00219976-I1Open ↗
08/13/2026M00219910-I1Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1132
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications487
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION252
08/28/2020140941211Open ↗
08/28/2020140941211Open ↗
06/01/2020123919821Open ↗
Showing 3 of 252 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST67
06/01/2020123919821Open ↗
Showing 1 of 67 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT55
08/19/2020140941211Open ↗
08/06/2020140921661Open ↗
06/01/2020123919821Open ↗
Showing 3 of 55 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/23/2026M00250875-I1Open ↗
09/20/2026M01025657-I1Open ↗
09/20/2026M01025657-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/05/2026M00152003-I1Open ↗
09/05/2026M00219976-I1Open ↗
09/05/2026M00219910-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026M00152003-I1Open ↗
09/02/2026M00145912-I1Open ↗
09/01/2026M00982818-I1Open ↗
Showing 3 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
08/19/2020140941211Open ↗
08/06/2020140921661Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
08/19/2020140941211Open ↗
08/06/2020140921661Open ↗
Showing 2 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment172
▸BISSELF-CERT PLUMBING NOTICE61
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 61 on file for this type
▸BISSCHEDULE B - PLUMBING36
04/13/2021121929690Open ↗
02/08/2021121916392Open ↗
01/22/2021121916392Open ↗
Showing 3 of 36 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA22
07/12/2022123007469Open ↗
06/24/2020123276695Open ↗
Showing 2 of 22 on file for this type
▸BISEQUIPMENT USE PERMITS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection78
▸BISANTI-HARASSMENT CHECKLIST40
06/01/2020123919821Open ↗
Showing 1 of 40 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist17
09/05/2026M00152003-I1Open ↗
09/05/2026M00219976-I1Open ↗
09/05/2026M00250875-I1Open ↗
Showing 3 of 17 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist12
08/19/2020140941211Open ↗
08/06/2020140921661Open ↗
Showing 2 of 12 on file for this type
▸DOB NOWCertificate of No Harassment4
08/13/2026M00317497-I1Open ↗
08/13/2026M00982818-I1Open ↗
08/13/2026M00219976-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos115
▸BISASBESTOS: CERTIFICATION (DEP ACP5)66
08/19/2020140941211Open ↗
08/06/2020140921661Open ↗
06/01/2020123919821Open ↗
Showing 3 of 66 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/05/2026M00152003-I1Open ↗
09/05/2026M00219976-I1Open ↗
09/05/2026M00219910-I1Open ↗
Showing 3 of 19 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
07/18/2020123851475Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance117
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS67
06/01/2020123919821Open ↗
Showing 1 of 67 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS20
01/20/2022123758086Open ↗
01/10/2022123758086Open ↗
12/23/2021123758086Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
12/09/2021121916392Open ↗
10/26/2021123919821Open ↗
10/26/2021123919821Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
05/22/2024121929690Open ↗
12/09/2021121916392Open ↗
10/22/2021123702396Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/19/2020140941211Open ↗
Showing 1 of 2 on file for this type
▸BISNYCECC EXEMPTION1
08/06/2020140921661Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00250850-I1Open ↗
▸Inspections & Test Reports36
▸BISTECHNICAL REPORT: RESPONSIBILITY29
06/25/2024121929690Open ↗
01/20/2022123758086Open ↗
01/10/2022123758086Open ↗
Showing 3 of 29 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
06/24/2024121929690Open ↗
06/24/2024121929690Open ↗
▸Approvals, Objections & Sign-offs172
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST77
07/28/2022123007469Open ↗
02/10/2022121035405Open ↗
01/20/2022123758086Open ↗
Showing 3 of 77 on file for this type
▸BISADMINISTRATIVE OBJECTIONS40
04/26/2023121929690Open ↗
Showing 1 of 40 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE17
11/02/2023103469462Open ↗
10/19/2023103469462Open ↗
10/17/2023103469462Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWTransit Authority Approval13
09/05/2026M00152003-I1Open ↗
09/05/2026M00219976-I1Open ↗
09/05/2026M00250875-I1Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER8
08/02/2023121929690Open ↗
07/19/2023121929690Open ↗
03/23/2021121035405Open ↗
Showing 3 of 8 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL7
08/19/2020140941211Open ↗
08/06/2020140921661Open ↗
Showing 2 of 7 on file for this type
▸BISFINAL2
05/22/2024121929690Open ↗
05/03/2021140921661Open ↗
▸Cost, Insurance & Ownership185
▸BISCOST AFFIDAVIT177
01/20/2022123758086Open ↗
01/20/2022123758086Open ↗
01/10/2022123758086Open ↗
Showing 3 of 177 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
05/22/2024121929690Open ↗
07/27/2022123007469Open ↗
02/08/2022121035405Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms212
▸BISEFILING COVER SHEET121
06/01/2020123919821Open ↗
06/01/2020123919821Open ↗
Showing 2 of 121 on file for this type
▸BISADDITIONAL INFORMATION44
09/19/2025103469462Open ↗
12/15/2023103469462Open ↗
01/26/2023121929690Open ↗
Showing 3 of 44 on file for this type
▸BISBOROUGH INTAKE FORM40
11/19/2021121929690Open ↗
07/01/2021123840718Open ↗
03/23/2021121035405Open ↗
Showing 3 of 40 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
08/19/2020140941211Open ↗
08/06/2020140921661Open ↗
Showing 2 of 7 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
01/10/2022123758086Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
09/05/2026M00152003-I1Open ↗
08/13/2026M00145912-I1Open ↗
▸DOB NOWCalculations2
08/27/2026M01025657-I1Open ↗
08/13/2026M01025657-P1Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
09/05/2026M00152003-I1Open ↗
08/13/2026M00145912-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/27/2026M01025657-I1Open ↗
08/13/2026M01025657-P1Open ↗