Roof3p · 3 filings · 20 docs
ArchitectureMechanicalOther
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
On file for this job
2 documents · 1 drawing sheet
Interior build out for a proposed office space as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
22 documents · 1 drawing sheet
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
19 documents · 1 drawing sheet
Floor 958p · 3 filings · 20 docs
CivilFire ProtectionGeneralMechanicalPlumbing
Herewith filing mechanical work in apt. 95AB, as per plans submitted.
On file for this job
35 documents · 3 drawing sheets
Herewith filing modification to an existing sprinkler system in apt. 95AB, as per plans submitted.
On file for this job
17 documents · 2 drawing sheets
Filing for relocation, removal and installation of plumbing fixtures. Proposed scope does not affect the NYECC and a TR-8 is not required.
On file for this job
19 documents · 6 drawing sheets
Floor 942p · 1 filing · 19 docs
Plumbing
Filing for relocation, removal and installation of plumbing fixtures. Proposed scope does not affect the NYECC and a TR-8 is not required.
On file for this job
19 documents · 2 drawing sheets
Floor 93Under Construction1p · 1 filing · 14 docs
Structural
structural work associated with the Interior renovation of the duplex apartment, associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
On file for this job
14 documents · 1 drawing sheet
Floor 92Under Construction1p · 1 filing · 14 docs
Structural
structural work associated with the Interior renovation of the duplex apartment, associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
On file for this job
14 documents · 1 drawing sheet
Floor 91
Floor 90
Floor 89Under Construction19p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
Remove and replace exterior soffit at drum floors with new metal panel system, also, floors are the mechanical windbreak floors open to outside.
On file for this job
5 documents
Floor 88
Floor 87
Floor 86
Floor 85
Floor 84
Floor 834p · 2 filings · 11 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
7 documents · 1 drawing sheet
REPAIR OF SPALLED CONCRETE BEAMS, COLUMNS, & SLABS. NO CHANGEIN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
4 documents · 1 drawing sheet
Floor 82
Floor 81
Floor 80
Floor 79
Floor 7833p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Sprinklers
Herewith filing mechanical work in apt. 95AB, as per plans submitted.
On file for this job
35 documents
Herewith filing modification to an existing sprinkler system in apt. 95AB, as per plans submitted.
On file for this job
17 documents
Herewith filing removal of sprinkler heads, and installation of temporary sprinkler loop system in conjunction with BIS# 123785519, DOB NOW #: M00246125-I1
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 771p · 1 filing · 19 docs
Plumbing
Filing for relocation, removal and installation of plumbing fixtures. Proposed scope does not affect the NYECC and a TR-8 is not required.
On file for this job
19 documents · 1 drawing sheet
Floor 76Under Construction22p · 1 filing · 14 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
structural work associated with the Interior renovation of the duplex apartment, associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
On file for this job
14 documents
Floor 75Under Construction19p · 1 filing · 14 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
structural work associated with the Interior renovation of the duplex apartment, associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
On file for this job
14 documents
Floor 74Under Construction19p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
Remove and replace exterior soffit at drum floors with new metal panel system, also, floors are the mechanical windbreak floors open to outside.
On file for this job
5 documents
Floor 73
Floor 72
Floor 71
Floor 70
Floor 69
Floor 68
Floor 672p · 2 filings · 16 docs
Architecture
MECHANICAL MODIFICATIONS TO INCLUDE INSTALLATION OF NEW CEILINGTRANSFER FAN AND ASSOCIATED DUCTWORK AT AN EXISTING 67TH FLOOR APARTMENT. NO CHANGE OF USE,OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
10 documents · 1 drawing sheet
Sprinkler work associated with the renovation of an existing 67th floor apartment.
On file for this job
6 documents · 1 drawing sheet
Floor 66
Floor 65
Floor 642p · 1 filing · 2 docs
PlumbingOther
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
2 documents · 2 drawing sheets
Floor 634p · 1 filing · 13 docs
Fire ProtectionPlumbing
Renovate existing residential apartment as shown on plans filed herewith. Plumbing/mechanical filed subsequently. No change to occupancy, use or egress
On file for this job
13 documents · 4 drawing sheets
Floor 621p · 1 filing · 7 docs
Architecture
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
7 documents · 1 drawing sheet
Floor 61
Floor 60Under Construction19p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
Remove and replace exterior soffit at drum floors with new metal panel system, also, floors are the mechanical windbreak floors open to outside.
On file for this job
5 documents
Floor 59
Floor 58
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 421 filing · 3 docs
Mechanical
Issued Permit Scope
Mechanical Systems
HEREBY FILING FOR THE REMOVAL, RELOCATION AND INSTALLATION OF DUCTWORK, TOILET EXHAUST. NO CHANGE TO USE EGRESS OR OCCUPANCY.
On file for this job
3 documents
Floor 41
Floor 401p · 1 filing · 7 docs
Architecture
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
7 documents · 1 drawing sheet
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 344p · 3 filings · 20 docs
ArchitecturePlumbing
Renovation of an existing apartment on 34th floor. Work to include non-structural demolition and general construction as per plans filed herewith. no change to use, egress occupancy.
On file for this job
12 documents · 2 drawing sheets
Plumbing and Sprinkler work file in conjunction with apartment renovation as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
9 documents · 1 drawing sheet
Remove kitchen, bathroom and laundry fixtures and Cap pipes in 12 apartments on the 18th construction floor. No change to use, egress, or occupancy.
On file for this job
4 documents · 2 drawing sheets
Floor 33
Floor 32
Floor 31
Floor 30
Floor 293p · 2 filings · 9 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction
Propose to change occupancy on the 29th floor for new storage rooms.
On file for this job
6 documents
Remove kitchens and bathrooms fixtures in (3) existing apartments in order to combine (4) units on the 15th construction floor. No change to use, egress or occupancy under this application.
On file for this job
3 documents · 2 drawing sheets
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20Under Construction7p · 1 filing · 20 docs
Fire ProtectionPlumbing
Issued Permit Scope
Sprinklers
Filing for the minor sprinkler work in conjunction with the combination of the two apartments.
On file for this job
25 documents · 2 drawing sheets
Floor 19
Floor 181p · 1 filing · 7 docs
Fire Protection
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
7 documents · 1 drawing sheet
Floor 17
Floor 16
Floor 15Under Construction39p · 3 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Interior renovation of Apartment 29E (15th Construction Floor) per drawings submitted herewith. Installation of new partitions, doors, floor, and finishes. No change to use, egress, or occupancy.
On file for this job
14 documents
Renovate or relocate bathroom and kitchen plumbing fixtures in the process of renovation filed under application # M01202731
On file for this job
17 documents
Remove and returns and relocate thermostat associated of (4) existing apartments (Apt. #29 E/F/G/H) on the 15th construction floor. No change to use, egress, or occupancy.
On file for this job
3 documents · 1 drawing sheet
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 628p · 2 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers · Supported Scaffold
THE WORK INCLUDED IN THIS APPLICATION PERTAINS TO MINOR MODIFICATIONS TO THE 6TH FLOOR (CONST. FLR) 12TH FLOOR (MARKETING FLR) INTERIOR FIT OUT. THERE IS NO CHANGE TO USE OCCUPANCY OR EGRESS.
On file for this job
19 documents
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE, NO CHANGE IN USE EGGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
2 documents
Floor 513p · 13 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Interior fit out of a physician's office. Remove portions of existing floor slab & non-load bearing partitions. Construct interior partitions, non-egress stairs, ceilings and doors as shown on drawings. No change in use, egress or occupancy
On file for this job
7 documents · 26 drawing sheets
Removal of portion of floor slab for installation of a new monumental stair, communicating stair and dumb waiter as shown on drawings. No change in use, egress or occupancy.
On file for this job
19 documents · 1 drawing sheet
Herewith filing mechanical work in apt. 95AB, as per plans submitted.
On file for this job
35 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 4Under Construction76p · 8 filings · 20 docs
ArchitectureDMFire ProtectionLandscapeMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal and construction of non-bearing partitions, doors, ceilings and finishes, demountable partitions, interconnecting stair as shown on drawings. No change in use, egress or occupancy.
On file for this job
47 documents · 5 drawing sheets
THE WORK INCLUDED IN THIS APPLICATION PERTAINS TO MINOR MODIFICATIONS TO THE 6TH FLOOR (CONST. FLR) 12TH FLOOR (MARKETING FLR) INTERIOR FIT OUT. THERE IS NO CHANGE TO USE OCCUPANCY OR EGRESS.
On file for this job
19 documents · 1 drawing sheet
Interior fit out of a physician's office. Remove portions of existing floor slab & non-load bearing partitions. Construct interior partitions, non-egress stairs, ceilings and doors as shown on drawings. No change in use, egress or occupancy
On file for this job
7 documents · 34 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3Under Construction32p · 5 filings · 20 docs
ArchitectureFire ProtectionLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal and construction of non-bearing partitions, doors, ceilings and finishes, demountable partitions, interconnecting stair as shown on drawings. No change in use, egress or occupancy.
On file for this job
47 documents · 4 drawing sheets
Modification to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Modification to HVAC system as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
26 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 210p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Modification to sprinkler system as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
4 documents · 1 drawing sheet
Modification to HVAC system as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
26 documents · 2 drawing sheets
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
9 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 17p · 12 filings · 20 docs
ArchitectureFire ProtectionGeneralPlumbingStructural
Issued Permit Scope
General Construction
Steel column reinforcing, liner wall, CIP slab, steel canopy and new cast in place as shown on drawings filed herewith. No change in use, egress or occupancy. Associated job #123748695-OT, M00259224-MH, M00259218-PL, M00259189-SP
On file for this job
29 documents · 1 drawing sheet
Modification to sprinkler head, plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Mezzanine2p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction
Propose to change occupancy on the 29th floor for new storage rooms.
On file for this job
6 documents
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Cellar20p · 13 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Steel column reinforcing, liner wall, CIP slab, steel canopy and new cast in place as shown on drawings filed herewith. No change in use, egress or occupancy. Associated job #123748695-OT, M00259224-MH, M00259218-PL, M00259189-SP
On file for this job
29 documents · 2 drawing sheets
Modification to sprinkler system as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
4 documents · 3 drawing sheets
Modification to HVAC system as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this job
26 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Sub-Cellar2p · 1 filing · 20 docs
Mechanical
Supplemental Cooling for Electrical Switchgear Room with VRF System. No change in use, egress, or occupancy.
On file for this job
20 documents · 2 drawing sheets