← Back
BuildNYC
Gas or electric utility
4400 VICTORY BOULEVARD
STATEN ISLAND · BIN 5156955
💬 Discuss this project
0Year Built
—Stories
U2Building Class
M3-1Zoning
0 sfGross Floor Area
0Units
0 Active ViolationsFDNY Report ↗
Gas or electric utility · 425,817 sf lot · 0 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofConsolidated Edison3p · 3 filings · 8 docs
Floor 1Consolidated Edison13p · 3 filings · 15 docs
Site & exteriorConsolidated Edison5p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Consolitaded Edison Co3210/06/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Waypoint Consulting Group110/05/2026
Vincent Liotta109/02/2025
S.M. Berger Architecture306/27/2025
WSP USA504/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Angela Rivera503/21/2026
J.A.M. Associates403/21/2026
Taccetta Cconsulting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Acme IndustrialGeneral Contractor507/08/2026
On-Trac Construction AssociatesGeneral Contractor207/08/2026
Afgo Mechanical Servicesspecialty_contractor104/09/2026
Par Plumbing CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519110/05/2026
Vincent J. Liotta P. E1974109/02/2025
Catalpa Special Inspectio2004306/27/2025
Tectonic Engineering Cons106304/25/2022
Building Lifecycle
All (38)Filed (10)Permit Issued (7)Signed Off (6)Violation (4)Special Inspection (11)
10/05/2026
Filed — Alteration
Replace perimeter fence as per plans. No change in use, egress, or occupancy.
S01456761-I1
09/08/2026
Special inspection requirement — Final
Alejandro Molina
09/08/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
11/14/2025
Signed off — Alteration
S01274831-I1
10/09/2025
Signed off — Alteration
REPLACEMENT OF HP1 AND HP2 UNITS
S01228281-I1
09/03/2025
Permit issued — Mechanical Systems
S01274831-I1-MS
09/02/2025
Filed — Alteration
S01274831-I1
07/01/2025
Permit issued — Mechanical Systems
S01228281-I1-MS
06/27/2025
Filed — Alteration
REPLACEMENT OF HP1 AND HP2 UNITS
S01228281-I1
05/19/2025
Special inspection requirement — Mechanical Systems
Sanford Berger
05/19/2025
Special inspection requirement — Final
Sanford Berger
12/06/2023
Signed off — Alteration
S00894816-I1
07/05/2023
Permit issued — Mechanical Systems
S00894816-I1-MS
07/03/2023
Filed — Alteration
S00894816-I1
07/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
Sanford Berger
06/22/2023
Special inspection requirement — Final
Sanford Berger
06/22/2023
Special inspection requirement — Mechanical Systems
Sanford Berger
04/27/2022
Signed off — Alteration
Installation of NEW Standby Generator
S00415059-I1
04/25/2022
Filed — Alteration
Installation of NEW Standby Generator
S00415059-P2
02/23/2022
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
02/23/2022
Special inspection requirement — Final
GEORGE GHEBRYAL
01/12/2022
Signed off — Alteration
New gas piping related to the installation of NEW Standby generator.
S00415060-I1
07/30/2021
Permit issued — Mechanical Systems
S00415059-I1-MS
05/28/2021
Filed — Alteration
New gas piping related to the installation of NEW Standby generator.
S00415060-P1
05/28/2021
Filed — Alteration
Installation of NEW Standby Generator
S00415059-P1
05/24/2021
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
05/24/2021
Special inspection requirement — Final
GEORGE GHEBRYAL
03/03/2021
Signed off — Alteration
S00447473-I1
02/01/2021
Permit issued — Mechanical Systems
S00447473-I1-MS
01/21/2021
Filed — Alteration
S00447473-I1
12/11/2020
Permit issued — Plumbing
S00415060-I1-PL
12/08/2020
Filed — Alteration
Installation of NEW Standby Generator
S00415059-I1
12/08/2020
Filed — Alteration
New gas piping related to the installation of NEW Standby generator.
S00415060-I1
12/08/2020
Permit issued — Mechanical Systems
S00415059-I1-MS
10/28/2013
Violation issued (FDNY_NOV, closed)
06/24/2010
Violation issued (FDNY_NOV, closed)
06/24/2010
Violation issued (FDNY_NOV, closed)
06/14/2004
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAfgo Mechanical Services09/03/2025
DOB NOWMechanical SystemsSigned-offAcme Industrial07/01/2025
DOB NOWMechanical SystemsSigned-offAcme Industrial07/05/2023
DOB NOWMechanical SystemsSigned-offOn-Trac Construction Associates07/30/2021
DOB NOWMechanical SystemsSigned-offAcme Industrial02/01/2021
DOB NOWPlumbingSigned-offPar Plumbing Co12/11/2020
DOB NOWMechanical SystemsSigned-offOn-Trac Construction Associates12/08/2020
BISOTISSUEDOn-Trac Construction Associates07/30/2021
BISOTISSUEDOn-Trac Construction Associates11/24/2020
9 projects · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026CompleteConsolidated Edison CoGeneral Wiring
06/24/2025CompleteConsolidated Edison CoGeneral Wiring
03/15/2024CompleteConsolidated Edison CoGeneral Wiring
02/26/2024CompleteConsolidated Edison Co—
02/16/2024CompleteConsolidated Edison Co—
11/28/2023CompletePowerone Elect'l ContractingGeneral Wiring
05/11/2023CompleteConsolidated Edison Co—
02/10/2023CompleteConsolidated Edison Co—
06/07/2021CompleteConsolidated Edison Co—
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
09/08/2026FinalAlejandro Molinaprogress
09/08/2026Subgrade InspectionsYounes Abouyaalaspecial
05/19/2025Mechanical SystemsSanford Bergerspecial
05/19/2025FinalSanford Bergerprogress
07/03/2023HVAC-R and service water heating equipmentSanford Bergerenergy_progress
06/22/2023FinalSanford Bergerprogress
06/22/2023Mechanical SystemsSanford Bergerspecial
02/23/2022Mechanical SystemsGEORGE GHEBRYALspecial
02/23/2022FinalGEORGE GHEBRYALprogress
05/24/2021Mechanical SystemsGEORGE GHEBRYALspecial
05/24/2021FinalGEORGE GHEBRYALprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Consolidated EdisonIndustrial / WarehouseFloor 1, Roof
Project S01456761 Alteration · Permit Entire · 10/05/2026
Project S00447473 Alteration · LOC Issued · 01/21/2021
Project S00415059 Alteration · LOC Issued · 12/08/2020
Project S00415060 Alteration · LOC Issued · 12/08/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/25/2026S00447473-I1Request digital key ↗
08/25/2026S00415059-P2Request digital key ↗
08/25/2026S00415059-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch4
10/06/2026S01456761-I1Request digital key ↗
08/23/2026S00894816-I1Request digital key ↗
08/19/2026S01228281-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026S00415060-I1Request digital key ↗
08/15/2026S00415060-P1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
09/23/2021540189696Open ↗
06/15/2021540189696Open ↗
05/27/2021540189696Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
11/24/2020540189696Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature10
10/06/2026S01456761-I1Open ↗
08/25/2026S00415060-P1Open ↗
08/25/2026S00415060-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
10/06/2026S01456761-I1Open ↗
09/01/2026S00894816-I1Open ↗
09/01/2026S00894816-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/06/2026S01456761-I1Open ↗
09/01/2026S00894816-I1Open ↗
08/26/2026S00415059-P1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/11/2020540189696Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/11/2020540189696Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/11/2020540189696Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026S00415060-P1Open ↗
08/25/2026S00415060-I1Open ↗
08/25/2026S00447473-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/24/2020540189696Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/11/2020540189696Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/11/2020540189696Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/11/2022540189696Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/11/2022540189696Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00447473-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/23/2021540189696Open ↗
11/24/2020540189696Open ↗
11/23/2020540189696Open ↗
Showing 3 of 4 on file for this type
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
01/11/2022540189696Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/11/2022540189696Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/11/2022540189696Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/11/2022540189696Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/12/2022540189696Open ↗
▸BISFINAL1
01/11/2022540189696Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
11/11/2020540189696Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/11/2022540189696Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
11/11/2020540189696Open ↗
▸BISADDITIONAL INFORMATION1
09/23/2021540189696Open ↗