ECB08/18/2025ATOI OBSERVED A DRIVEWAY BEING CONSTRUCTED AT THE LEFT SIDE YARD OF HOUSE. EXP 2. 9'8" WIDE CONCRETE RAMP BUILT. CMU PLANTERS WERE REMOVED IN THE AREA ALONG SIDEWALK TO CREATE THE DRIVEWAY SUBBASE. NO PERMITS OHearing held — result not yet published$2K proposed
Miscellaneous one family · 1,767 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.