← Back
Miscellaneous educational facility
4401 TIBBETT AVENUE
BRONX · BIN 2084234
💬 Discuss this project
1923Year Built
2Stories
W9Building Class
R1-2Zoning
2,178 sfGross Floor Area
1Units
8 Open Violations 6 unresolved · 2 paperwork only ▸FDNY Report ↗
Miscellaneous educational facility · Owner of record: HORACE MANN SCHOOL · 7,550 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
BasementUnder Construction1p · 1 filing · 17 docs
Sub-BasementUnder Construction3p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HORACE MANN SCHOOL504/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JACK GREEN ASSOCIATES307/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-ACE SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATALANO PLBG & HTG INCPlumbing106/28/2026
Building Lifecycle
All (36)Filed (3)Permit Issued (1)Violation (19)Inspection (9)Objection (4)
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/14/2026
Objection raised — Other
08/14/2026
Objection raised — Other
07/27/2026
Filed — Alteration
Installation of new gas boiler on existing piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
X01263621-P2
06/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2026
Filed — Alteration
Installation of new gas boiler on existing piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
X01263621-P1
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/07/2026
Permit issued — Plumbing
X01263621-I1-PL
12/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/03/2025
Filed — Alteration
Installation of new gas boiler on existing piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
X01263621-I1
12/26/2023
Violation issued (ECB, closed)
Zoning
11/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/28/2018
Violation issued (ECB, open)
Boilers
08/28/2018
Violation issued (ECB, open)
Construction
02/06/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/06/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/06/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/30/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCATALANO PLBG & HTG INC04/07/2026
1 project · most recent 07/27/2026
Gas
FiledStatusContractorScope
07/27/2026Permit IssuedCATALANO PLBG & HTG INCGas
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026X01263621-P2Request digital key ↗
08/16/2026X01263621-P1Request digital key ↗
08/16/2026X01263621-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/16/2026X01263621-P2Open ↗
08/16/2026X01263621-P1Open ↗
08/13/2026X01263621-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026X01263621-P2Open ↗
08/16/2026X01263621-P1Open ↗
08/16/2026X01263621-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026X01263621-P1Open ↗
08/16/2026X01263621-I1Open ↗
08/16/2026X01263621-P2Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/16/2026X01263621-P1Open ↗
08/16/2026X01263621-P2Open ↗
08/13/2026X01263621-I1Open ↗