← Back
Other college and university
RH. Keating Hall
441 EAST FORDHAM ROAD · BIN 2102036
💬 Discuss this project
1922Year Built
6Stories
W6Building Class
R6Zoning
1,743,584 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Open Violations
Other college and university · Owner of record: FORDHAM UNIVERSITY · 3,392,065 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof13p · 2 filings · 9 docs
Floor 201p · 1 filing · 4 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
BasementUnder Construction3p · 1 filing · 17 docs
Sub-BasementUnder Construction11p · 1 filing · 17 docs
3 jobs · most recent 02/09/2026
FiledStatusContractorScope
02/09/2026Permit IssuedE-J ELEC. INSTALLATION CO—
09/26/2024CompleteRICHARD NEU—
04/05/2021Permit IssuedCAPUTEK ELEC'L SERVICES,—
1 job · most recent 09/18/2025
Scaffold
FiledStatusContractorScope
09/18/2025Signed-offLEMX CORPScaffold
Building Lifecycle
All (48)Filed (12)Permit Issued (12)Signed Off (8)Inspection (4)Special Inspection (12)
08/27/2026
Permit issued — Plumbing
X01414957-S2-PL
08/07/2026
Permit issued — General Construction
X01414957-I1-GC
08/07/2026
Permit issued — Mechanical Systems
X01414957-S1-MS
07/30/2026
Filed — Alteration
Mechanical work associated with Keating Hall Veterans Center Renovation, including REROUTE EXISTING DUCTWORK AND DAMPERS as shown on plans filed herewith. No change of use, egress and occupancy.
X01414957-I1
07/30/2026
Filed — Alteration
Mechanical work associated with Keating Hall Veterans Center Renovation, including REROUTE EXISTING DUCTWORK AND DAMPERS as shown on plans filed herewith. No change of use, egress and occupancy.
X01414957-S2
07/30/2026
Filed — Alteration
Mechanical work associated with Keating Hall Veterans Center Renovation, including REROUTE EXISTING DUCTWORK AND DAMPERS as shown on plans filed herewith. No change of use, egress and occupancy.
X01414957-S1
07/15/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01291154-I1
06/24/2026
Signed off — Alteration
Keating Hall, Roof repair PHASE 2- removal and replacement of the roofing membranes/components above the existing roof deck down to the existing concrete deck and installation of a new perimeter guardrail. No change of use, egress and occupancy.
X01256105-I1
06/18/2026
Special inspection requirement — Lighting controls
GEORGE ANDERSEN
06/18/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE ANDERSEN
06/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
GEORGE ANDERSEN
06/18/2026
Special inspection requirement — Maintenance information
GEORGE ANDERSEN
06/18/2026
Special inspection requirement — Interior lighting power
GEORGE ANDERSEN
06/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Final
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Mechanical Systems
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Final
GEORGE ANDERSEN
05/01/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01285503-I1
11/21/2025
Permit issued — General Construction
X01256105-I1-GC
09/29/2025
Permit issued — Protection and Mechanical Methods
X01291154-I1-PMM
09/25/2025
Filed — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01291154-I1
09/25/2025
Filed — Alteration
Keating Hall, Roof repair PHASE 2- removal and replacement of the roofing membranes/components above the existing roof deck down to the existing concrete deck and installation of a new perimeter guardrail. No change of use, egress and occupancy.
X01256105-I1
09/19/2025
Permit issued — Supported Scaffold
X01285503-I1-SF
09/18/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01285503-I1
07/22/2025
Signed off — Alteration
X01086317-I1
05/16/2025
Signed off — Alteration
X01106483-I1
05/05/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01193930-I1
05/05/2025
Signed off — Alteration
X01170025-I1
04/30/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
X01113087-I1
03/19/2025
Permit issued — Protection and Mechanical Methods
X01193930-I1-PMM
03/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01193930-I1
02/06/2025
Permit issued — Supported Scaffold
X01170025-I1-SF
02/05/2025
Filed — Alteration
X01170025-I1
11/19/2024
Permit issued — General Construction
X01106483-I1-GC
10/28/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
X01113087-P1
09/26/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
X01113087-I1
09/26/2024
Permit issued — Supported Scaffold
X01113087-I1-SH
09/26/2024
Permit issued — Supported Scaffold
X01113087-I1-SF
09/25/2024
Filed — Alteration
X01106483-I1
08/13/2024
Permit issued — Suspended Scaffold
X01086317-I1-SC
07/31/2024
Filed — Alteration
X01086317-I1
04/24/2024
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
04/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/25/2024
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FORDHAM UNIVERSITY1909/13/2026
LEMX1204/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION603/21/2026
NYCCODE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEMX CORPGeneral Contractor704/09/2026
PRESERV BLD RESTOR MGT INGeneral Contractor507/08/2026
BROSNA CONSTRUCTION CORPOGeneral Contractor208/08/2026
RICHARD NEUElectrical103/21/2026
HUDSON PLMBING & MCH, LLCPlumbing108/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLE TECHNOLOGIES/CONTROL1290307/30/2026
TECTONIC ENGINEERING CONS106209/25/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHUDSON PLMBING & MCH, LLC08/27/2026
DOB NOWGeneral ConstructionPermit IssuedBROSNA CONSTRUCTION CORPO08/07/2026
DOB NOWMechanical SystemsPermit IssuedBROSNA CONSTRUCTION CORPO08/07/2026
DOB NOWGeneral ConstructionSigned-offPRESERV BLD RESTOR MGT IN11/21/2025
DOB NOWProtection and Mechanical MethodsSigned-offPRESERV BLD RESTOR MGT IN09/29/2025
DOB NOWSupported ScaffoldSigned-offLEMX CORP09/19/2025
DOB NOWProtection and Mechanical MethodsSigned-offPRESERV BLD RESTOR MGT IN03/19/2025
DOB NOWSupported ScaffoldSigned-offPRESERV BLD RESTOR MGT IN02/06/2025
DOB NOWGeneral ConstructionSigned-offPRESERV BLD RESTOR MGT IN11/19/2024
DOB NOWSupported ScaffoldSigned-offLEMX CORP09/26/2024
DOB NOWSupported ScaffoldSigned-offLEMX CORP09/26/2024
DOB NOWSuspended ScaffoldPermit IssuedJEPOL CONSTRUCTION INC08/13/2024
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/24/2024Fail-Final PL - UndergroundFailView ↗
04/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/25/2024Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/18/2026Lighting controlsGEORGE ANDERSENenergy_progress
06/18/2026Energy Code Compliance InspectionsGEORGE ANDERSENprogress
06/18/2026Duct leakage testing, insulation and designGEORGE ANDERSENenergy_progress
06/18/2026Maintenance informationGEORGE ANDERSENenergy_progress
06/18/2026Interior lighting powerGEORGE ANDERSENenergy_progress
06/18/2026HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
06/10/2026Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
06/10/2026Mastic and Intumescent Fire-resistant CoatingsGEORGE ANDERSENspecial
06/10/2026FinalGEORGE ANDERSENprogress
06/10/2026Energy Code Compliance InspectionsGEORGE ANDERSENprogress
06/10/2026Mechanical SystemsGEORGE ANDERSENspecial
06/10/2026FinalGEORGE ANDERSENprogress
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/21/2026X01086317-I1Request digital key ↗
08/20/2026X01106483-I1Request digital key ↗
08/20/2026X01113087-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
02/24/2014220328759Open ↗
11/22/2013220328759Open ↗
11/20/2013220328759Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/20/2026X01113087-I1Open ↗
08/20/2026X01170025-I1Open ↗
08/18/2026X01285503-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026X01414957-S1Open ↗
09/01/2026X01414957-S1Open ↗
08/23/2026X01414957-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026X01414957-S1Open ↗
08/23/2026X01414957-I1Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
11/14/2016220328759Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026X01414957-I1Open ↗
08/16/2026X01414957-S1Open ↗
08/16/2026X01414957-S2Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026X01256105-I1Open ↗
08/13/2026X01106483-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/05/2013220328759Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/20/2026X01113087-I1Open ↗
08/20/2026X01170025-I1Open ↗
08/16/2026X01414957-S1Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/17/2016220328759Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X01106483-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/17/2016220328759Open ↗
08/05/2013220328759Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/05/2013220328759Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026X01086317-I1Open ↗