Over six families without stores
Spring Creek
441 VANDALIA AVENUE · BIN 3426790
💬 Discuss this project
2023Year Built
4Stories
C1Building Class
R6Zoning
7,126 sfGross Floor Area
8Units
Rent StabilizedFDNY Report ↗
Over six families without stores · Owner of record: Nehemiah Spring Creek 4C Housing Develop Ment Fund · 5,938 sf lot · 1.2 FAR built · Flood zone X500
Locations of Work
StructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing and sprinkler system installation34p · 3 filings · 20 docs
Floor 4Plumbing and sprinkler system installation31p · 3 filings · 20 docs
Floor 3Plumbing and sprinkler system installation30p · 3 filings · 20 docs
Floor 2Plumbing and sprinkler system installation30p · 3 filings · 20 docs
Floor 1Plumbing and sprinkler system installation31p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Spring Creek 4C Ownerllc2207/08/2026
Nehemiah Spring Creek 4C Housing Develop Ment Fund103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joselow & Associates605/24/2024
De Nardis Engineering108/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning703/21/2026
Milrose Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Monadnock General ContGeneral Contractor1003/22/2026
Monadnock ConstructionGeneral Contractor307/08/2026
G.N.T. MechanicalFire Protection207/08/2026
G.N.T. MechanicalPlumbing207/08/2026
Inter-County Mechanicalspecialty_contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec5842705/24/2024
Building Lifecycle
10/17/2024
Signed off — Alteration
INSTALL PLUMBING AND SPRINKLER WORK AS PER PLANS FILED, NO CHANGE TO USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #321597447
B00320042-I1
08/15/2024
Signed off — Alteration
B00320050-I1
08/15/2024
Signed off — Alteration
B00320028-I1
06/17/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/04/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
33 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offG.N.T. Mechanical01/11/2024
DOB NOWPlumbingSigned-offG.N.T. Mechanical01/11/2024
DOB NOWMechanical SystemsSigned-offMonadnock General Cont08/02/2023
DOB NOWStructuralSigned-offMonadnock General Cont08/02/2023
DOB NOWMechanical SystemsSigned-offMonadnock Construction05/15/2023
DOB NOWStructuralSigned-offMonadnock Construction05/05/2023
DOB NOWPlumbingSigned-offG.N.T. Mechanical02/09/2023
DOB NOWSprinklersSigned-offG.N.T. Mechanical02/09/2023
BIS—ISSUEDMonadnock General Cont08/08/2023
BIS—ISSUEDMonadnock General Cont08/08/2023
BIS—ISSUEDMonadnock Construction12/20/2022
BIS—ISSUEDMonadnock Construction12/20/2022
2 projects · most recent 06/13/2024
General Wiring
FiledStatusContractorScope
06/13/2024CompleteRGF ElectricGeneral Wiring
02/09/2023CompleteRGF Electric—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/17/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/29/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/27/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/12/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/04/2024Sprinkler SystemsCONNIE PISANIspecial
06/04/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
05/24/2024Sprinkler SystemsCONNIE PISANIspecial
05/24/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
05/03/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
05/03/2024Sprinkler SystemsCONNIE PISANIspecial
02/22/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
02/22/2024Sprinkler SystemsCONNIE PISANIspecial
11/16/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
11/16/2023Sprinkler SystemsCONNIE PISANIspecial
124 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account