← Back
Walk-up apt, over six families with stores
4411 5 AVENUE
BROOKLYN · BIN 3011243
💬 Discuss this project
1925Year Built
4Stories
C7Building Class
R6AZoning
5,132 sfGross Floor Area
8Units
Rent Stabilized21 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · 2,017 sf lot · 2.54 FAR built · Flood zone X
Locations of Work
Electrical
Floor 11p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RESCOM MAINTENANCE AND CONSTRUCTION1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIZA WORKS OF ARCHITECTURE PLLC303/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NIZA WORKS OF ARCHITECTURE PLLC303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RESCOM MAINTENACE AND CONGeneral Contractor603/21/2026
IPS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIZA WORKS OF ARCH PLLC6101203/14/2025
Building Lifecycle
All (96)Filed (3)Permit Issued (3)Violation (60)Inspection (2)Objection (16)Special Inspection (12)
01/08/2026
Violation issued (HPD, closed)
C
11/19/2025
Violation issued (HPD, closed)
I
06/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/23/2025
Permit issued — Plumbing
B01150428-S1-PL
05/08/2025
Permit issued — Construction Fence
B01148873-I1-FN
03/14/2025
Filed — Alteration
PLUMBING SCOPE FOR EXISTING FOOD AND BEVERAGE RETAILER ALTERATION. SINKS AND BATHROOM FIXTURES TO BE RELOCATED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01150428-S1
03/06/2025
Violation issued (ECB, closed)
Construction
02/11/2025
Permit issued — General Construction
B01150428-I1-GC
01/14/2025
Objection resolved — Addressed
01/13/2025
Objection resolved — Addressed
01/08/2025
Objection resolved — Addressed
01/08/2025
Objection resolved — Addressed
01/08/2025
Objection resolved — Addressed
01/08/2025
Objection resolved — Addressed
01/08/2025
Objection resolved — Addressed
01/08/2025
Objection resolved — Addressed
01/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nicolas Zapata
01/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Zapata
12/27/2024
Objection raised — Accessibility
12/27/2024
Objection raised — Scope
12/27/2024
Objection raised — Inspections
12/27/2024
Objection raised — Admin
12/27/2024
Objection raised — Admin
12/27/2024
Objection raised — Accessibility
12/27/2024
Objection raised — Accessibility
12/27/2024
Objection raised — Energy
12/23/2024
Filed — Alteration
PLUMBING SCOPE FOR EXISTING FOOD AND BEVERAGE RETAILER ALTERATION. SINKS AND BATHROOM FIXTURES TO BE RELOCATED. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01150428-I1
12/23/2024
Filed — Alteration
ERECT AN 8' CONSTRUCTION FENCE WITHIN 3' OF THE PUBLIC RIGHT OF WAY. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01148873-I1
12/03/2024
Special inspection requirement — Final
Nicolas Zapata
12/03/2024
Special inspection requirement — Fenestration air leakage
Nicolas Zapata
12/03/2024
Special inspection requirement — Air barrier - visual inspection
Nicolas Zapata
12/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Nicolas Zapata
12/03/2024
Special inspection requirement — Insulation placement and R values
Nicolas Zapata
12/03/2024
Special inspection requirement — Lighting controls
Nicolas Zapata
12/03/2024
Special inspection requirement — Fenestration areas
Nicolas Zapata
12/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Zapata
12/03/2024
Special inspection requirement — Interior lighting power
Nicolas Zapata
12/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
Nicolas Zapata
11/25/2024
Violation issued (ECB, closed)
Construction
11/25/2024
Violation issued (ECB, closed)
Unknown
11/25/2024
Violation issued (ECB, closed)
Construction
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
12/14/2016
Violation issued (HPD, closed)
C
12/14/2016
Violation issued (HPD, closed)
C
12/14/2016
Violation issued (HPD, closed)
C
12/14/2016
Violation issued (HPD, open)
B
12/14/2016
Violation issued (HPD, open)
B
12/14/2016
Violation issued (HPD, closed)
C
10/06/2015
Violation issued (HPD, closed)
I
10/04/2012
Violation issued (HPD, open)
C
09/15/2012
Violation issued (HPD, closed)
C
09/15/2012
Violation issued (HPD, closed)
A
09/15/2012
Violation issued (HPD, closed)
B
09/15/2012
Violation issued (HPD, closed)
C
09/15/2012
Violation issued (HPD, closed)
A
09/15/2012
Violation issued (HPD, closed)
A
09/15/2012
Violation issued (HPD, closed)
A
09/15/2012
Violation issued (HPD, closed)
C
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offIPS PLUMBING CORP05/23/2025
DOB NOWConstruction FencePermit IssuedRESCOM MAINTENACE AND CON05/08/2025
DOB NOWGeneral ConstructionPermit IssuedRESCOM MAINTENACE AND CON02/11/2025
BISPLISSUEDAURORA P & H CONT INC04/13/2004
BISBLISSUEDAURORA P & H CONT INC04/13/2004
1 project · most recent 03/14/2025
Water/Sanitary
FiledStatusContractorScope
03/14/2025Signed-offIPS PLUMBING CORPWater/Sanitary
2 projects · most recent 01/28/2025
General Wiring
FiledStatusContractorScope
01/28/2025Permit IssuedRIDGE ELECTRIC CORP.General Wiring
06/07/2018CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 12/23/2024
Fence
FiledStatusContractorScope
12/23/2024Permit IssuedRESCOM MAINTENACE AND CONFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
01/08/2025Fire-Resistance Rated ConstructionNicolas Zapataprogress
01/08/2025Energy Code Compliance InspectionsNicolas Zapataprogress
12/03/2024FinalNicolas Zapataprogress
12/03/2024Fenestration air leakageNicolas Zapataenergy_progress
12/03/2024Air barrier - visual inspectionNicolas Zapataenergy_progress
12/03/2024Fenestration and door U-factor and product ratingsNicolas Zapataenergy_progress
12/03/2024Insulation placement and R valuesNicolas Zapataenergy_progress
12/03/2024Lighting controlsNicolas Zapataenergy_progress
12/03/2024Fenestration areasNicolas Zapataenergy_progress
12/03/2024Fire-Resistant Penetrations and JointsNicolas Zapataspecial
12/03/2024Interior lighting powerNicolas Zapataenergy_progress
12/03/2024Tenant Protection Plan ComplianceNicolas Zapataspecial
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026B01148873-I1Request digital key ↗
08/22/2026B01150428-S1Request digital key ↗
08/15/2026B01150428-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026B01150428-I1Open ↗
08/22/2026B01150428-S1Open ↗
08/13/2026B01148873-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B01150428-I1Open ↗
08/28/2026B01150428-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B01150428-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026B01150428-S1Open ↗
08/15/2026B01150428-I1Open ↗