← Back
Elevator apt, less than 11 units, residential
4419 12 AVENUE
BROOKLYN · BIN 3426871
💬 Discuss this project
2019Year Built
6Stories
DBBuilding Class
R6Zoning
37,659 sfGross Floor Area
11Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
Elevator apt, less than 11 units, residential · Owner of record: CON ML LLC · 6,017 sf lot · 6.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Roof7p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 8 docs
Floor 74p · 3 filings · 20 docs
Floor 63p · 2 filings · 13 docs
Floor 54p · 2 filings · 13 docs
Floor 43p · 2 filings · 13 docs
Floor 34p · 2 filings · 13 docs
Floor 22p · 1 filing · 8 docs
Floor 14p · 2 filings · 13 docs
Cellar6p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WIFI CONSTRUCTION1607/08/2026
CON ML LLC103/22/2026
ABOVE BUILDER GROUP503/22/2026
C/O SNAP DEVELOPERS LLC O303/22/2026
SNAP DEVELOPERS703/22/2026
OS BUILDERS503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/02/2025$6.0M—OS BUILDERS LLC → CON ML LLC$159/sf building
06/25/2018$2.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADVANCED ENGINEERING & INSPECT. PLL606/05/2026
PAUL G. JONES, P.E.302/08/2024
ASHRAF CORP101/06/2021
JOEL PHAGOO P.E. PLLC108/09/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KD DESIGNS103/21/2026
AFFINITY ASSOCIATES203/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSOLIDATED SCAFFOLDINGGeneral Contractor1307/08/2026
WIFI CONSTRUCTION LLCGeneral Contractor1203/21/2026
B&B MECH PLBG & HTG LLCPlumbing507/08/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor407/08/2026
ABOVE BUILDER GROUP LLCGeneral Contractor403/22/2026
ABRAHAM RUTNERElectrical303/21/2026
TRUE POWER ELECL CONT LLC 004599General Contractor303/22/2026
D & F CONSTRUCTION GROUPGeneral Contractor103/22/2026
TARGET PIPING NY LLCFire Protection106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616606/05/2026
Building Lifecycle
All (127)Filed (11)Permit Issued (16)Signed Off (8)Violation (35)Inspection (7)Objection (20)Special Inspection (30)
07/21/2026
Signed off — Alteration
Installation of the sprinkler and plumbing system in conjunction with GC #320891843.
B01092300-I1
06/18/2026
Objection resolved — Addressed
06/11/2026
Objection raised — Cost
06/05/2026
Filed — Alteration
Installation of the sprinkler and plumbing system in conjunction with GC #320891843.
B01092300-P1
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/20/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
05/20/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
05/20/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/20/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
05/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/11/2026
Signed off — Alteration
Boiler Application Herewith filed in conjunction with NB Job #320891843.
B01092229-I1
12/12/2025
Violation issued (FDNY_NOV, closed)
12/12/2025
Violation issued (FDNY_NOV, closed)
10/30/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/22/2025
Objection resolved — Addressed
10/22/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
10/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
10/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
10/21/2025
Objection raised — Cost
10/16/2025
Objection resolved — Addressed
10/06/2025
Objection resolved — Addressed
10/03/2025
Objection raised — Mechanical
10/03/2025
Objection raised — Mechanical
09/26/2025
Filed — Alteration
Boiler Application Herewith filed in conjunction with NB Job #320891843.
B01092229-P2
09/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/25/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
09/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/18/2025
Signed off — Alteration
Installation of the mechanical system in conjunction with GC #320891843.
B01092193-I1
09/17/2025
Filed — Alteration
Boiler Application Herewith filed in conjunction with NB Job #320891843.
B01092229-P1
09/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/17/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
09/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/08/2025
Permit issued — Sprinklers
B01092300-I1-PL
09/04/2025
Permit issued — Boiler Equipment
B01092229-I1-BE
08/28/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
08/28/2025
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
08/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/21/2025
Filed — Alteration
Boiler Application Herewith filed in conjunction with NB Job #320891843.
B01092229-I1
07/30/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B00990735-S1
07/30/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B00990735-S2
07/30/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B00990735-I1
06/04/2025
Violation issued (FDNY_ORDER, closed)
06/04/2025
Violation issued (FDNY_ORDER, closed)
02/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/11/2025
Permit issued — Mechanical Systems
B01092193-I1-MS
02/04/2025
Permit issued — Supported Scaffold
B00990735-I1-SH
01/29/2025
Violation issued (FDNY_ORDER, closed)
01/20/2025
Violation issued (ECB, closed)
Construction
01/20/2025
Violation issued (ECB, closed)
Unknown
01/20/2025
Violation issued (ECB, closed)
Construction
01/20/2025
Violation issued (ECB, closed)
Unknown
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC09/08/2025
DOB NOWBoiler EquipmentSigned-offTARGET PIPING NY LLC09/04/2025
DOB NOWMechanical SystemsSigned-offABOVE BUILDER GROUP LLC02/11/2025
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING02/04/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC09/10/2024
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC09/10/2024
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING02/08/2024
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING02/07/2024
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING01/26/2024
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING01/26/2024
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION05/26/2022
DOB NOWSupported ScaffoldSigned-offNEW AMERICAN CONSTRUCTION05/26/2022
DOB NOWSupported ScaffoldSigned-offWIFI CONSTRUCTION LLC04/15/2021
DOB NOWSidewalk ShedSigned-offWIFI CONSTRUCTION LLC04/13/2021
DOB NOWSidewalk ShedSigned-offWIFI CONSTRUCTION LLC01/07/2021
DOB NOWSupported ScaffoldSigned-offWIFI CONSTRUCTION LLC01/07/2021
BISEQISSUEDABOVE BUILDER GROUP LLC11/11/2024
BISEQISSUEDABOVE BUILDER GROUP LLC09/26/2024
BISEQISSUEDABOVE BUILDER GROUP LLC09/26/2024
BIS—ISSUEDABOVE BUILDER GROUP LLC09/25/2024
BIS—ISSUEDABOVE BUILDER GROUP LLC05/09/2024
BIS—ISSUEDABOVE BUILDER GROUP LLC04/04/2024
BIS—ISSUEDABOVE BUILDER GROUP LLC12/18/2023
BISEQISSUEDABOVE BUILDER GROUP LLC11/24/2023
BIS—ISSUEDSNAP DEVELOPERS LLC01/05/2021
BIS—ISSUEDSNAP DEVELOPERS LLC08/05/2020
BISEQISSUEDSNAP DEVELOPERS LLC08/05/2020
BIS—ISSUEDSNAP DEVELOPERS LLC08/05/2020
BISOTISSUEDSNAP DEVELOPERS LLC04/04/2019
BISEQISSUEDSNAP DEVELOPERS LLC01/14/2019
BIS—ISSUEDSNAP DEVELOPERS LLC01/04/2019
BIS—ISSUEDSNAP DEVELOPERS LLC10/10/2018
BIS—ISSUEDSNAP DEVELOPERS LLC04/10/2018
BIS—ISSUEDSNAP DEVELOPERS LLC03/22/2018
BIS—ISSUEDSNAP DEVELOPERS LLC02/16/2018
BISEQISSUEDNEW AMERICAN CONSTRUCTION INC01/17/2018
BIS—ISSUEDKAUFMAN GROUP INC07/03/2017
BIS—ISSUEDSNAP DEVELOPERS LLC03/24/2017
BIS—RE-ISSUEDSNAP DEVELOPERS LLC06/24/2016
BIS—RE-ISSUEDSNAP DEVELOPERS LLC06/24/2016
+ 4 more permits on file
1 project · most recent 06/05/2026
FiledStatusContractorScope
06/05/2026Signed-offTARGET PIPING NY LLC—
1 project · most recent 06/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/05/2026Signed-offTARGET PIPING NY LLCGas, Storm, Water/Sanitary
5 projects · most recent 02/12/2026
General Wiring
FiledStatusContractorScope
02/12/2026CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
11/18/2024CompleteDENALI ELECTRIC CORP—
01/22/2024CompleteSOLAS ELECTRICAL CORP—
01/11/2024CompleteD & W ELECTRICAL CONT COR—
01/07/2021CancelledTFK ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/30/2025Pass-Final Boiler Equipment InspectionPassView ↗
08/28/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
08/28/2025Pass-Final SP - More than 10 Requested FloorsPassView ↗
08/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/10/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
05/20/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
05/20/2026Sprinkler SystemsFAHAD FATEHspecial
05/20/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
05/20/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
05/20/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/20/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/20/2026Maintenance informationFAHAD FATEHenergy_progress
05/20/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/20/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
10/22/2025Heating SystemsFAHAD FATEHspecial
10/22/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/22/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/22/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
10/22/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/25/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/25/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/25/2025Heating SystemsFAHAD FATEHspecial
09/25/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/25/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/17/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/17/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/17/2025Heating SystemsFAHAD FATEHspecial
09/17/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/17/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/30/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 34.
▾Documents — 294 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
09/03/2026B00068616-I1Request digital key ↗
08/26/2026B00990735-S2Request digital key ↗
08/26/2026B00990735-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00448697-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00448697-I1Request digital key ↗
▸Applications & Permits58
▸BISWORK PERMIT APPLICATION33
05/14/2024320891843Open ↗
04/09/2024320891843Open ↗
04/08/2024320891843Open ↗
Showing 3 of 33 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION22
02/10/2026321909841Open ↗
02/05/2026320891843Open ↗
12/08/2025321254806Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
02/26/2020320891843Open ↗
05/23/2019320891843Open ↗
01/18/2018320891843Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
04/05/2024320891843Open ↗
Showing 1 of 2 on file for this type
▸BISAMENDED ZONING DIAGRAM1
04/02/2020320891843Open ↗
▸BISVERIFY TAX LOT1
05/29/2025320891843Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/03/2026B00068616-I1Open ↗
09/02/2026B00448697-I1Open ↗
08/26/2026B00990735-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
05/29/2019320891843Open ↗
05/23/2019321909841Open ↗
04/03/2019321909841Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/27/2026B01092229-P1Open ↗
09/23/2026B01092229-I1Open ↗
09/02/2026B01092193-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/27/2026B01092229-P1Open ↗
09/23/2026B01092229-I1Open ↗
09/02/2026B01092193-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/03/2019321909841Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/12/2025340916414Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/03/2019321909841Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/12/2025340916414Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/21/2020320891843Open ↗
Showing 1 of 3 on file for this type
▸BISWATER CUT-OFF1
03/23/2018321050401Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
11/20/2025320891843Open ↗
▸BISELECTRIC CUT-OFF1
03/23/2018321050401Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/20/2025320891843Open ↗
▸BISSPRINKLER SYSTEMS1
11/20/2025320891843Open ↗
▸BISFIRE ALARM TEST1
11/18/2025320891843Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/05/2025320891843Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
03/23/2018321050401Open ↗
03/23/2018321050401Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
12/16/2025321909841Open ↗
11/20/2025320891843Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/03/2019321909841Open ↗
02/19/2019320891843Open ↗
Showing 2 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
11/20/2025320891843Open ↗
▸BIS* DUCT LEAKAGE TESTING1
11/20/2025320891843Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/20/2025320891843Open ↗
▸BISFENESTRATION AREAS1
11/20/2025320891843Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/10/2025320891843Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/20/2026B01092229-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
12/23/2025321909841Open ↗
11/10/2025320891843Open ↗
11/10/2025320891843Open ↗
Showing 3 of 5 on file for this type
▸BISCONCRETE - CAST-IN-PLACE2
12/16/2025321909841Open ↗
11/20/2025320891843Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
11/20/2025321909841Open ↗
11/20/2025320891843Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP2
12/17/2025321909841Open ↗
11/20/2025320891843Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
11/25/2020320891843Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/20/2025320891843Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/20/2025320891843Open ↗
▸BIS* EXIT SIGNS1
12/01/2025320891843Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/20/2025320891843Open ↗
▸BISMASONRY1
11/20/2025320891843Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
11/20/2025320891843Open ↗
▸Approvals, Objections & Sign-offs22
▸BISLETTERS - SUPPORTING DOCUMENTATION10
05/14/2024320891843Open ↗
04/09/2024320891843Open ↗
04/08/2024320891843Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
02/19/2025320891843Open ↗
04/08/2024320891843Open ↗
04/08/2024320891843Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMECHANICAL (MH) SIGNOFF2
11/05/2025320891843Open ↗
11/05/2025320891843Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/06/2026321909841Open ↗
▸Cost, Insurance & Ownership30
▸BISAcord 25 (Acord Certificate of Liability Insurance)14
05/14/2024320891843Open ↗
04/09/2024320891843Open ↗
04/08/2024320891843Open ↗
Showing 3 of 14 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE12
05/14/2024320891843Open ↗
04/09/2024320891843Open ↗
02/21/2024320891843Open ↗
Showing 3 of 12 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
04/08/2024320891843Open ↗
02/08/2024320891843Open ↗
▸BISCOST AFFIDAVIT1
04/03/2019321909841Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/22/2025321909841Open ↗
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION13
02/05/2026320891843Open ↗
02/20/2025320891843Open ↗
04/05/2024320891843Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET6
04/09/2019321909841Open ↗
Showing 1 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
01/12/2024320891843Open ↗
11/24/2023320891843Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/10/2025340916414Open ↗
▸Other Documents21
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
04/02/2020320891843Open ↗
04/02/2020320891843Open ↗
04/02/2020320891843Open ↗
Showing 3 of 8 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION8
07/10/2025340916414Open ↗
07/10/2025340916414Open ↗
07/10/2025340916414Open ↗
Showing 3 of 8 on file for this type
▸BISUNDERPINNING (2014)2
12/16/2025321909841Open ↗
11/20/2025320891843Open ↗
▸BISVESTIBULES1
11/20/2025320891843Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
11/20/2025320891843Open ↗
▸BISMAINTENANCE INFORMATION1
11/20/2025320891843Open ↗