← Back
Three families
442 MARION STREET
BROOKLYN · BIN 3041333
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6Zoning
2,400 sfGross Floor Area
3Units
Rent Stabilized87 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 442 MARION STREET LLC · 1,000 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Cellar6p · 1 filing · 20 docs
1 job · most recent 07/10/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/10/2025Signed-offBG CONSTRUCTION NY INCAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-4C36NA3-U1 36,000 BTU · Condensing Unit ×6
1 job · most recent 07/10/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/10/2025Signed-offRRP PLUMBING CORPGas, Water/Sanitary
1 job · most recent 02/13/2025
General Wiring
FiledStatusContractorScope
02/13/2025Permit IssuedA ELECTRICAL MAIN SVC INCGeneral Wiring
Building Lifecycle
All (98)Filed (4)Permit Issued (2)Violation (60)Inspection (6)Special Inspection (26)
08/21/2026
Violation issued (ECB, open)
Plumbing
05/05/2026
Violation issued (HPD, open)
A
03/31/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/20/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/20/2025
Violation issued (HPD, open)
I
08/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
07/11/2025
Special inspection requirement — Mechanical Systems
Pablo Ayala
07/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
07/11/2025
Special inspection requirement — Final
Pablo Ayala
07/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
07/11/2025
Special inspection requirement — Lighting in dwelling units
Pablo Ayala
07/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Pablo Ayala
07/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Pablo Ayala
07/10/2025
Filed — Alteration
JOB FILED INTERIOR RENOVATION FROM CELLAR TO 3RD FLOOR, INCLUDING NEW WOOD FLOOR, NEW PAINT, NEW KITCHEN CABINET AND REPLACE BATHROOM FIXTURES, SPLIT SYSTEM, PARTITIONS AND TILES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01114227-P3
06/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Pablo Ayala
06/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
06/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
06/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Pablo Ayala
06/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
06/26/2025
Filed — Alteration
JOB FILED INTERIOR RENOVATION FROM CELLAR TO 3RD FLOOR, INCLUDING NEW WOOD FLOOR, NEW PAINT, NEW KITCHEN CABINET AND REPLACE BATHROOM FIXTURES, SPLIT SYSTEM, PARTITIONS AND TILES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01114227-P2
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
06/26/2025
Special inspection requirement — Mechanical Systems
Pablo Ayala
06/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
06/26/2025
Special inspection requirement — Final
Pablo Ayala
06/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
Pablo Ayala
06/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Pablo Ayala
06/26/2025
Special inspection requirement — Lighting in dwelling units
Pablo Ayala
06/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
06/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
06/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
Pablo Ayala
06/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Pablo Ayala
06/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
06/10/2025
Violation issued (HPD, open)
A
02/14/2025
Permit issued — Plumbing
B01114227-S1-PL
02/07/2025
Permit issued — Mechanical Systems
B01114227-I1-GC-CX
02/04/2025
Filed — Alteration
JOB FILED INTERIOR RENOVATION FROM CELLAR TO 3RD FLOOR, INCLUDING NEW WOOD FLOOR, NEW PAINT, NEW KITCHEN CABINET AND REPLACE BATHROOM FIXTURES, SPLIT SYSTEM, PARTITIONS AND TILES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01114227-I1
02/04/2025
Filed — Alteration
JOB FILED INTERIOR RENOVATION FROM CELLAR TO 3RD FLOOR, INCLUDING NEW WOOD FLOOR, NEW PAINT, NEW KITCHEN CABINET AND REPLACE BATHROOM FIXTURES, SPLIT SYSTEM, PARTITIONS AND TILES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01114227-S1
11/29/2024
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, open)
I
08/02/2023
Violation issued (HPD, open)
B
08/02/2023
Violation issued (HPD, open)
B
08/02/2023
Violation issued (HPD, open)
B
08/02/2023
Violation issued (HPD, open)
B
07/04/2023
Violation issued (HPD, open)
C
07/04/2023
Violation issued (HPD, open)
B
07/04/2023
Violation issued (HPD, closed)
A
07/04/2023
Violation issued (HPD, open)
B
07/04/2023
Violation issued (HPD, open)
A
07/04/2023
Violation issued (HPD, open)
A
07/04/2023
Violation issued (HPD, open)
B
07/04/2023
Violation issued (HPD, open)
B
07/04/2023
Violation issued (HPD, open)
A
07/04/2023
Violation issued (HPD, open)
B
07/04/2023
Violation issued (HPD, open)
A
Latest 60 of 98 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GALIT DEVELOPMENT103/21/2026
HPD403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/17/2023$775K—Private party → 442 MARION STREET LLC$323/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AYALA ENGINEERING PC407/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BG CONSTRUCTION NY INCGeneral Contractor303/21/2026
RRP PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AYALA ENGINEERING P.C.9207407/10/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRRP PLUMBING CORP02/14/2025
DOB NOWMechanical SystemsSigned-offBG CONSTRUCTION NY INC02/07/2025
BISPLISSUEDS.J VISION & SON P& H03/30/2005
BISEQISSUEDP & S CONSTRUCTION NY INC.02/03/2005
BISOTISSUEDP & S CONSTRUCTION NY INC.02/03/2005
BISOTISSUEDMAXIMUM MECHANICAL CORP06/18/1996
BISPLISSUEDMAXIMUM MECHANICAL CORP06/18/1996
BIS—ISSUEDAZARIAS CONTRACTING CORP.02/15/1996
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/31/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/20/2026Fail-Final General Construction Non-Directive 14FailView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/11/2025Fire-Resistant Penetrations and JointsPablo Ayalaspecial
07/11/2025Mechanical SystemsPablo Ayalaspecial
07/11/2025Energy Code Compliance InspectionsPablo Ayalaprogress
07/11/2025FinalPablo Ayalaprogress
07/11/2025HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
07/11/2025Lighting in dwelling unitsPablo Ayalaenergy_progress
07/11/2025HVAC-R and service water heating equipmentPablo Ayalaenergy_progress
07/11/2025HVAC-R and service water heating system controlsPablo Ayalaenergy_progress
06/27/2025HVAC-R and service water heating system controlsPablo Ayalaenergy_progress
06/27/2025Fire-Resistant Penetrations and JointsPablo Ayalaspecial
06/27/2025Energy Code Compliance InspectionsPablo Ayalaprogress
06/27/2025HVAC-R and service water heating equipmentPablo Ayalaenergy_progress
06/27/2025HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
06/26/2025Fire-Resistant Penetrations and JointsPablo Ayalaspecial
06/26/2025Mechanical SystemsPablo Ayalaspecial
06/26/2025Energy Code Compliance InspectionsPablo Ayalaprogress
06/26/2025FinalPablo Ayalaprogress
06/26/2025HVAC-R and service water heating equipmentPablo Ayalaenergy_progress
06/26/2025HVAC-R and service water heating system controlsPablo Ayalaenergy_progress
06/26/2025Lighting in dwelling unitsPablo Ayalaenergy_progress
06/26/2025HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
06/26/2025Fire-Resistant Penetrations and JointsPablo Ayalaspecial
06/26/2025Energy Code Compliance InspectionsPablo Ayalaprogress
06/26/2025HVAC-R and service water heating equipmentPablo Ayalaenergy_progress
06/26/2025HVAC-R and service water heating system controlsPablo Ayalaenergy_progress
Latest 25 of 26.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026B01114227-S1Request digital key ↗
08/23/2026B01114227-I1Request digital key ↗
08/23/2026B01114227-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B01114227-I1Open ↗
09/01/2026B01114227-I1Open ↗
08/30/2026B01114227-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B01114227-S1Open ↗
08/23/2026B01114227-I1Open ↗
08/23/2026B01114227-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01114227-I1Open ↗
08/30/2026B01114227-P2Open ↗
08/29/2026B01114227-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01114227-S1Open ↗
08/23/2026B01114227-I1Open ↗
08/23/2026B01114227-P2Open ↗
Showing 3 of 4 on file for this type