← Back
BuildNYC
Office with apartments (no commercial)
4426 18TH AVENUE
BROOKLYN · Borough Park · BIN 3127517
💬 Discuss this project
1933Year Built
2Stories
O8Building Class
R5Zoning
4,139 sfGross Floor Area
4Units
1 Active Violation 2 old, status unconfirmed ▸FDNY Report ↗
Office with apartments (no commercial) · 2,535 sf lot · 1.63 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalLandscape
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Pittas, Connie /trust1p · 1 filing · 20 docs
Floor 1Perfect Health7p · 2 filings · 20 docs
CellarPittas, Connie /trust1p · 1 filing · 20 docs
Site & exteriorRepair exterior insulation finishing system1p · 1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Archaq101/10/2024
AM Architecture312/21/2022
TSF Engineering102/09/2022
Psarchitecture101/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Allstate Expediters803/21/2026
Shirley Swift103/21/2026
Miriam Weiss103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
StructurelineGeneral Contractor407/08/2026
Highlevel GroupGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering8524101/10/2024
HRF Services5616512/21/2022
Building Lifecycle
All (44)Filed (6)Permit Issued (4)Signed Off (3)Violation (9)Inspection (1)Objection (4)Special Inspection (17)
07/28/2025
Violation issued (ECB, open)
Construction
02/08/2024
Signed off — Alteration
PROPOSED EXTERIOR INSULATION FINISHING AT EXPOSURE 1 AND 2. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00988278-I1
01/17/2024
Permit issued — General Construction
B00988278-I1-GC
01/10/2024
Filed — Alteration
PROPOSED EXTERIOR INSULATION FINISHING AT EXPOSURE 1 AND 2. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00988278-I1
01/09/2024
Violation issued (ECB, closed)
Construction
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/29/2022
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/29/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/29/2022
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/29/2022
Special inspection requirement — Lighting controls
FAHAD FATEH
12/21/2022
Filed — Alteration CO
FILED HERE TO CHANGE THE USE OF PART OF THE FIRST FLOOR FROM A SCHOOL TO MEDICAL OFFICES AS PER PLANS FILED
B00651608-P2
12/14/2022
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/14/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/14/2022
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/14/2022
Special inspection requirement — Lighting controls
FAHAD FATEH
12/05/2022
Signed off — Alteration CO
FILED HERE TO CHANGE THE USE OF PART OF THE FIRST FLOOR FROM A SCHOOL TO MEDICAL OFFICES AS PER PLANS FILED
B00651608-S2
09/20/2022
Filed — Alteration CO
FILED HERE TO CHANGE THE USE OF PART OF THE FIRST FLOOR FROM A SCHOOL TO MEDICAL OFFICES AS PER PLANS FILED
B00651608-P1
09/20/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/20/2022
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/20/2022
Special inspection requirement — Lighting controls
FAHAD FATEH
09/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/19/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/25/2022
Signed off — Alteration
B00658479-I1
03/30/2022
Permit issued — General Construction
B00651608-I1-GC
02/23/2022
Permit issued — Mechanical Systems
B00651608-S2-MS
02/09/2022
Filed — Alteration CO
FILED HERE TO CHANGE THE USE OF PART OF THE FIRST FLOOR FROM A SCHOOL TO MEDICAL OFFICES AS PER PLANS FILED
B00651608-S2
02/05/2022
Objection raised — Zoning
02/05/2022
Objection resolved — Addressed
02/05/2022
Objection raised — Zoning
02/05/2022
Objection resolved — Addressed
01/31/2022
Filed — Alteration CO
FILED HERE TO CHANGE THE USE OF PART OF THE FIRST FLOOR FROM A SCHOOL TO MEDICAL OFFICES AS PER PLANS FILED
B00651608-I1
01/31/2022
Special inspection requirement — Final
FAHAD FATEH
01/31/2022
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/11/2022
Permit issued — General Construction
B00658479-I1-GC
01/06/2022
Filed — Alteration
B00658479-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/02/2009
Violation issued (ECB, closed)
Construction
04/02/2009
Violation issued (ECB, closed)
Unknown
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHighlevel Group01/17/2024
DOB NOWGeneral ConstructionPermit IssuedStructureline03/30/2022
DOB NOWMechanical SystemsSigned-offStructureline02/23/2022
DOB NOWGeneral ConstructionSigned-offStructureline01/11/2022
BISPLISSUEDPrime Piping & Heating10/11/2017
BISPLISSUEDLeakless Plumbing11/10/2016
BIS—ISSUEDGary Allen Modular Homes11/02/2016
BISPLISSUEDPrecision Plumbing Services10/07/2016
BISOTISSUEDYS Framers NY08/31/2016
BISEQISSUEDYS Framers NY08/29/2016
BISEQISSUEDGary Allen Modular Homes05/20/2016
BISOTISSUEDGary Allen Modular Homes05/20/2016
BISEQISSUEDBilly Contractors07/01/2010
BISOTISSUEDA & U General Contracting06/29/2010
1 project · most recent 12/21/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/21/2022Permit IssuedStructurelineAir Conditioning Systems, Heating Systems
Cooling
Daikin FXMQ48PBVJU 45,500 BTU · Vrf Indoor ×1
Heating
Daikin FXMQ48PBVJU 49,500 BTU · Vrf Indoor ×1
1 project · most recent 02/11/2022
General Wiring
FiledStatusContractorScope
02/11/2022CompleteHivolts ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/19/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
12/29/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/29/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/29/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
12/29/2022Interior lighting powerFAHAD FATEHenergy_progress
12/29/2022Lighting controlsFAHAD FATEHenergy_progress
12/14/2022Interior lighting powerFAHAD FATEHenergy_progress
12/14/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/14/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
12/14/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/14/2022Lighting controlsFAHAD FATEHenergy_progress
09/20/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
09/20/2022Interior lighting powerFAHAD FATEHenergy_progress
09/20/2022Lighting controlsFAHAD FATEHenergy_progress
09/20/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/20/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/31/2022FinalFAHAD FATEHprogress
01/31/2022Mechanical SystemsFAHAD FATEHspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Perfect HealthMedical / HealthcareFloor 1
Project B00658479 Alteration · LOC Issued · 01/06/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/31/2026B00658479-I1Request digital key ↗
08/28/2026B00651608-S2Request digital key ↗
08/28/2026B00651608-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits31
▸BISWORK PERMIT APPLICATION12
10/12/2017321404949Open ↗
11/14/2016321437058Open ↗
11/03/2016321437058Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
06/14/2018321437058Open ↗
03/28/2018320228856Open ↗
12/11/2017321404949Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION7
07/31/2018321437058Open ↗
07/31/2018321437058Open ↗
07/18/2018321437058Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/13/2018321437058Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00651608-I1Open ↗
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
06/07/2018340381456Open ↗
06/07/2018340381456Open ↗
06/06/2018321437058Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
10/07/2026B00651608-S2Open ↗
09/05/2026B00651608-P2Open ↗
09/05/2026B00651608-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/07/2026B00651608-S2Open ↗
09/05/2026B00651608-P2Open ↗
08/29/2026B00651608-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/31/2026B00658479-I1Open ↗
08/13/2026B00651608-P2Open ↗
08/13/2026B00651608-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/02/2010320182690Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/18/2016340381456Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/18/2016340381456Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/02/2010320182690Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/18/2016340381456Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/20/2016321437058Open ↗
08/17/2016321437058Open ↗
08/01/2016321404949Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/11/2017321404949Open ↗
▸BISEQUIPMENT USE PERMITS1
12/11/2017321404949Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/13/2026B00651608-P1Open ↗
08/13/2026B00651608-P2Open ↗
08/13/2026B00651608-I1Open ↗
▸BISSTREET TREE CHECKLIST2
10/20/2016321437058Open ↗
08/17/2016321437058Open ↗
▸BISTenant Protection Plan and Notes1
10/25/2016321437058Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00651608-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00651608-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00651608-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/31/2026B00658479-I1Open ↗
08/13/2026B00651608-P1Open ↗
08/13/2026B00651608-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/17/2016321437058Open ↗
08/01/2016321404949Open ↗
05/18/2016340381456Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/02/2010320182690Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/02/2010320163023Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
06/07/2018340381456Open ↗
06/07/2018340381456Open ↗
06/06/2018321437058Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
06/13/2018321437058Open ↗
06/07/2018340381456Open ↗
06/06/2018321437058Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/18/2016340381456Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/18/2016340381456Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00651608-S2Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00651608-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/18/2016340381456Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/26/2016321404949Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
08/07/2018321437058Open ↗
07/27/2018321437058Open ↗
06/07/2018340381456Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
10/25/2010320228856Open ↗
07/02/2010320182690Open ↗
06/02/2010320163023Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/12/2017321404949Open ↗
11/18/2010320182690Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
08/17/2016321437058Open ↗
10/25/2010320228856Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
07/27/2018321437058Open ↗
06/07/2018340381456Open ↗
12/05/2017321404949Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms19
▸BISBOROUGH INTAKE FORM10
08/07/2018321437058Open ↗
07/27/2018321437058Open ↗
06/07/2018340381456Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET5
08/17/2016321437058Open ↗
08/01/2016321404949Open ↗
10/25/2010320228856Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
07/27/2018321437058Open ↗
11/20/2017321404949Open ↗
07/18/2017321437058Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/18/2016340381456Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification3
08/13/2026B00651608-P1Open ↗
08/13/2026B00651608-P2Open ↗
08/13/2026B00651608-I1Open ↗
▸BISPLOT DIAGRAM2
08/17/2016321437058Open ↗
10/25/2010320228856Open ↗