← Back
BuildNYC
Three families
443 LINWOOD STREET
BROOKLYN · BIN 3088949
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
R5BZoning
3,160 sfGross Floor Area
3Units
Rent Stabilized27 Active Violations 26 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Three families · 2,500 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Associates107/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM Engineering Services203/21/2026
Building Lifecycle
05/05/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
06/10/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/26/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
04/10/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
60 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTRE-ISSUEDCap Construction Services03/09/2020
BISOTISSUEDEfs Restoration02/27/2020
BISEQISSUEDCrest Contracting06/14/2000
BISPLISSUEDW.G. PLG Heating06/18/1999
BISEQISSUEDCrest Contracting05/25/1999
BIS—ISSUEDCrest Contracting05/25/1999
1 project · most recent 07/29/2021
Ventilation Systems
FiledStatusContractorScope
07/29/2021——Ventilation Systems
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/26/2021HVAC-R and service water piping design and insulation—energy_progress
08/19/2021HVAC-R and service water heating system controls—energy_progress
08/19/2021HVAC-R and service water heating equipment—energy_progress
08/05/2021Energy Code Compliance Inspections—progress
08/05/2021Fire-Resistance Rated Construction—progress
08/05/2021Fire-Resistant Penetrations and Joints—special
07/21/2021Final—progress
07/21/2021Mechanical Systems—special
16 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account