4 Open Violations 3 unresolved · 1 paperwork only▸
ECB09/26/2023CLEAN OUT DIRTY AND NEED NEW DOOR/ COMBUSTIBLE AIR MISSING IN BOILER ROOM/ SPILL SWITCH MISSING/ BACKFLOW MISSING DRAIN PIPE/CORRECT ALL VIOLATING CONDITIONS/ SUBMIT CERTIFICATE OF CORRECTIONS$3K due
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
ECB05/03/2001WORK WITHOUT A PERMIT (EXTERIOR).WORK NOTED:WOOD STRUCTURE APPROX 16'HX18'LX12'W AT S/W SECTION OF PREMISES CONSTRUCTED.REMEDY:FILE PLANS OBTAIN PERMITS OR REMOVE SAID STRUCTURE.Nothing owed — awaiting certificate of correction
Two family brick · 5,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.