← Back
Professional building / stand-alone funeral home
4434 AMBOY ROAD
STATEN ISLAND · BIN 5073185
💬 Discuss this project
1971Year Built
2Stories
O7Building Class
R3-2Zoning
22,147 sfGross Floor Area
7Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: ELTINGVILLE SHOPPING CENTER OWNER LLC · 43,815 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof5p · 4 filings · 20 docs
Floor 13p · 2 filings · 16 docs
1 job · most recent 05/13/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/13/2026Signed-offKALE CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Gree ×1
Carrier MODEL NAME: HVAC UNIT MODEL NUMBER: 48FCEM08A2A5A0A0A0 180,000 BTU · Rooftop Unit ×1
3 jobs · most recent 06/25/2024
General Wiring
FiledStatusContractorScope
06/25/2024CompleteKJK ELECTRIC INC—
05/06/2024CompleteKJK ELECTRIC INCGeneral Wiring
04/13/2020CompleteNEWBRIDGE ELECTL CONTNG—
Building Lifecycle
All (92)Filed (12)Permit Issued (11)Signed Off (7)Violation (33)Inspection (5)Objection (8)Special Inspection (16)
05/15/2026
Signed off — Alteration
REPLACE (1) HVAC ON ROOF AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01375436-I1
05/14/2026
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
05/14/2026
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
05/13/2026
Filed — Alteration
REPLACE (1) HVAC ON ROOF AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01375436-P1
03/31/2026
Permit issued — Mechanical Systems
S01375436-I1-MS
03/27/2026
Filed — Alteration
REPLACE (1) HVAC ON ROOF AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01375436-I1
09/02/2025
Signed off — Alteration
S01245394-I1
08/29/2025
Permit issued — Mechanical Systems
S01245394-I1-MS
07/30/2025
Filed — Alteration
S01245394-I1
06/23/2025
Special inspection requirement — Mechanical Systems
anthony santoro
06/23/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
06/23/2025
Special inspection requirement — Final
anthony santoro
08/20/2024
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR: INSTALL NEWPARTITIONS, FLOOR/WALL FINISHES AND NEW ADA TOILET. INSTALL NEW HOT WATERHEATER ON 1ST FLOOR. MECHANICAL SYSTEM INCLUDE RELATED VENTILATIONDUCTWORK AND EXHAUST FAN ON ROOF AS PER PLAN. NO
S01017065-I1
08/20/2024
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01017074-S1
08/20/2024
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01017074-I1
08/08/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/08/2024
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
07/30/2024
Permit issued — Sign
S01017074-S1-SG
07/29/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01017074-P1
07/29/2024
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
07/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/29/2024
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
07/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/29/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
07/26/2024
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
07/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/26/2024
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
07/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/26/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
07/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/18/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR: INSTALL NEWPARTITIONS, FLOOR/WALL FINISHES AND NEW ADA TOILET. INSTALL NEW HOT WATERHEATER ON 1ST FLOOR. MECHANICAL SYSTEM INCLUDE RELATED VENTILATIONDUCTWORK AND EXHAUST FAN ON ROOF AS PER PLAN. NO
S01017065-P2
07/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/25/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR: INSTALL NEWPARTITIONS, FLOOR/WALL FINISHES AND NEW ADA TOILET. INSTALL NEW HOT WATERHEATER ON 1ST FLOOR. MECHANICAL SYSTEM INCLUDE RELATED VENTILATIONDUCTWORK AND EXHAUST FAN ON ROOF AS PER PLAN. NO
S01017065-P1
06/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/03/2024
Permit issued — Plumbing
S01017065-I1-PL
05/02/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01017074-S1
04/29/2024
Permit issued — General Construction
S01017074-I1-MS
04/29/2024
Permit issued — Mechanical Systems
S01017074-I1-GC
04/23/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR: INSTALL NEWPARTITIONS, FLOOR/WALL FINISHES AND NEW ADA TOILET. INSTALL NEW HOT WATERHEATER ON 1ST FLOOR. MECHANICAL SYSTEM INCLUDE RELATED VENTILATIONDUCTWORK AND EXHAUST FAN ON ROOF AS PER PLAN. NO
S01017065-I1
04/23/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01017074-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/01/2022
Signed off — Alteration
Sprint - Decommission of existing telecommunication site on the roof. Removal of antenna sector, dunnage platform with related equipment on the roof and associated cabling/conduits from roof to basement.
S00727827-I1
06/24/2022
Permit issued — Antenna
S00727827-I1-AN
05/24/2022
Filed — Alteration
Sprint - Decommission of existing telecommunication site on the roof. Removal of antenna sector, dunnage platform with related equipment on the roof and associated cabling/conduits from roof to basement.
S00727827-I1
12/21/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/05/2021
Signed off — Alteration
2 new interior partitions
S00514105-I1
05/10/2021
Permit issued — General Construction
S00514105-I1-GC
05/05/2021
Filed — Alteration
2 new interior partitions
S00514105-I1
04/30/2021
Special inspection requirement — Final
anthony santoro
03/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/22/2019
Violation issued (ECB, closed)
Elevators
08/09/2019
Permit issued — Antenna
S00002920-I1-AN
04/09/2019
Permit issued — Antenna
S00002920-I1-AN
11/13/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/19/2018
Permit issued — Antenna
S00002920-I1-AN
04/11/2018
Filed — Alteration
Replace Sprint antennas on existing mounts on the roof and install related RRH units. All work in conformance with TPPN#5/98. No change in use, egress, or occupancy.
S00002920-I1
04/11/2018
Objection raised — AN -Other
04/11/2018
Objection resolved — Addressed
Latest 60 of 92 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MUSS DEVELOPMENT2807/08/2026
T-MOBILE307/08/2026
RICHMOND UNIVERSITY MEDICAL CENTER307/08/2026
ALLIED AMBOY COMPANY2503/22/2026
ALLIED AMBOY RD. CO.103/22/2026
TRANSCEND WIRELESS LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI805/13/2026
A TECH ENGINEERING NYC, PLLC.107/30/2025
A SAXON DESIGN GROUP105/24/2022
MARK D. LIPTON ASSOCIATES105/05/2021
JEREMY K MCKEON, P.E.104/11/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
ALEXANDRA CONSULTING103/21/2026
A TECH ENGINEERING NYC203/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor603/21/2026
TELCOM ENGINEERING GP INCGeneral Contractor507/08/2026
JOSEPH ROMAGNOLOElectrical203/21/2026
ROSVOGLOU DIMITRIOSElectrical103/21/2026
YOUNG CHOEElectrical103/21/2026
GOTHAM COMMUNICATIONS LLCGeneral Contractor107/08/2026
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
RICHMOND PLUMBING & HEAT*General Contractor107/08/2026
Z N J CONSTRUCTION INCGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
D'ALESSANDRO, FRANKElectrical103/21/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
DIMITRIOS ROSVOGLOUElectrical103/21/2026
ELISA, ALBERTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394405/13/2026
A TECH ENGINEERING NYC, P6738107/30/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKALE CONSTRUCTION INC03/31/2026
DOB NOWMechanical SystemsSigned-offRICHMOND PLUMBING & HEAT*08/29/2025
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC07/30/2024
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG05/03/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC04/29/2024
DOB NOWMechanical SystemsSigned-offKLE CONSTRUCTION INC04/29/2024
DOB NOWAntennaSigned-offGOTHAM COMMUNICATIONS LLC06/24/2022
DOB NOWGeneral ConstructionSigned-offZ N J CONSTRUCTION INC05/10/2021
DOB NOWAntennaPermit IssuedLINED UP CONSTRUCTION08/09/2019
DOB NOWAntennaPermit IssuedLINED UP CONSTRUCTION04/09/2019
DOB NOWAntennaPermit IssuedLINED UP CONSTRUCTION07/19/2018
BISMHISSUEDRICHMOND PLUMBING & HEAT*08/02/2017
BISPLISSUEDRICHMOND PLBG & HTG CO IN08/02/2017
BISOTISSUEDCEL TECH ELECTRIC INC04/08/2015
BISOTISSUEDALLIED MD CONSTRUCTION LL02/27/2015
BISOTISSUEDFARMS COMMUNICATIONS SVCE11/13/2013
BISOTISSUEDDUN-RITE COMMUNICATIONS I05/04/2011
BISPLISSUEDTPC II CONTRACTORS, INC09/12/2007
BISMHISSUEDSTATESIDE CONTRACTING CO. INC.08/08/2007
BISMHISSUEDARETE DEVELOPMENT07/27/2004
BISOTISSUEDCOSTA CONSTRUCTION & CONSULTING10/10/2003
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO09/11/2003
BIS—ISSUEDADAK DRYWALL INC12/04/2001
BISOTISSUEDSY EASTERN CARPENTRY06/04/2001
BISPLISSUEDMAGNUM PLUMBING & HEATING CORP.06/04/2001
BISPLISSUEDAVON PLBG & HTG INC05/14/2001
BISPLISSUEDDUO PLUMBING & HTG CORP.04/26/2001
BISOTISSUEDNOVA PLUMBING & HEATINGS, INC.04/23/2001
BISMHISSUEDHM & JLM DEVELOP. CORP04/18/2001
BISOTISSUEDHIGHLAND CONSTRUCTION ASSOCIATES03/20/2001
BISMHISSUEDBERLINER COMMUNICATIONS INC06/28/2000
BISPLISSUEDDUO PLUMBING & HTG CORP.06/16/1999
BISOTISSUEDHN & JLM DEVELPMENT CO05/26/1999
BISPLISSUEDDUO PLUMBING & HTG CORP.04/19/1999
BISPLISSUEDDUO PLUMBING & HTG CORP.11/13/1998
BISMHISSUEDHM & JLM DEVELOPMENT CO.11/04/1998
BIS—ISSUEDSERVICE SIGN ERECTORS,CO,INC07/15/1998
BIS—ISSUEDSERVICE SIGN ERECTORS,CO,INC07/15/1998
BIS—ISSUEDSERVICE SIGN ERECTORS,CO,INC07/15/1998
BIS—ISSUEDHM & JLM DEVELOPMENT CO06/18/1998
+ 6 more permits on file
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/08/2024Pass-Final General Construction Non-Directive 14PassView ↗
08/08/2024Pass-Final Sign Permit InspectionPassView ↗
07/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/14/2026FinalFARHAD BASSIRI-TEHRANIprogress
05/14/2026Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
06/23/2025Mechanical Systemsanthony santorospecial
06/23/2025Energy Code Compliance Inspectionsanthony santoroprogress
06/23/2025Finalanthony santoroprogress
07/29/2024FinalFARHAD BASSIRI-TEHRANIprogress
07/29/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/29/2024Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
07/29/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/29/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/26/2024Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
07/26/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/26/2024FinalFARHAD BASSIRI-TEHRANIprogress
07/26/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/26/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
04/30/2021Finalanthony santoroprogress
▾Documents — 172 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026S00514105-I1Request digital key ↗
08/21/2026S01017074-I1Request digital key ↗
08/21/2026S01017074-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION18
07/16/2025500219658Open ↗
07/14/2025500219658Open ↗
03/18/2025500219658Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION9
08/10/2017520305223Open ↗
08/10/2017520305223Open ↗
04/09/2015520216597Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications46
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
10/23/2018520305223Open ↗
08/10/2017520305223Open ↗
07/18/2017520216597Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/21/2026S01017074-I1Open ↗
08/21/2026S01017065-P1Open ↗
08/21/2026S01017065-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026S01017074-I1Open ↗
09/01/2026S01017074-P1Open ↗
08/26/2026S01375436-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026S01017074-I1Open ↗
09/01/2026S01017074-P1Open ↗
08/26/2026S01375436-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/07/2018520305223Open ↗
08/10/2017520305223Open ↗
08/03/2007510011899Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/03/2007510011899Open ↗
08/03/2007510011899Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY2
08/03/2007510011899Open ↗
08/03/2007510011899Open ↗
▸BISPC FULL REPORT2
08/03/2007510011899Open ↗
08/03/2007510011899Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/10/2017520305223Open ↗
02/24/2015540072758Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/24/2015540072758Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE2
08/25/2008510011899Open ↗
08/15/2008510011899Open ↗
▸BISEQUIPMENT USE PERMITS2
07/20/2025500219658Open ↗
01/22/2019520305223Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/10/2017520305223Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/10/2015520216597Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/07/2025500219658Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/22/2019520305223Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
02/24/2015540072758Open ↗
12/22/2014520216597Open ↗
11/07/2013520167131Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026S00727827-I1Open ↗
08/13/2026S00002920-I1Open ↗
08/13/2026S00514105-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/20/2011520063831Open ↗
08/03/2007510011899Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
10/23/2018520305223Open ↗
08/10/2017520305223Open ↗
07/18/2017520216597Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/26/2018520305223Open ↗
07/18/2017520216597Open ↗
08/06/2015540072758Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/24/2015540072758Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/24/2015540072758Open ↗
▸BISNYCECC ANALYSIS1
02/24/2015540072758Open ↗
▸Inspections & Test Reports4
▸BIS* WELDING 27-6162
02/22/2025500219658Open ↗
02/21/2025500219658Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
02/22/2025500219658Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/24/2015540072758Open ↗
▸Approvals, Objections & Sign-offs20
▸BISADMINISTRATIVE OBJECTIONS7
08/10/2017520305223Open ↗
12/22/2014520216597Open ↗
11/07/2013520167131Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
01/22/2019520305223Open ↗
11/26/2018520305223Open ↗
10/23/2018520305223Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
07/14/2025500219658Open ↗
03/14/2025500219658Open ↗
08/14/2024500219658Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
07/18/2025500219658Open ↗
▸BIS* HIGHWAY LETTER1
03/21/2025500219658Open ↗
▸DOB NOWNYS DEC Freshwater Wetlands Approval1
08/13/2026S00002920-I1Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT14
10/23/2018520305223Open ↗
08/10/2017520305223Open ↗
07/18/2017520216597Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/18/2025500219658Open ↗
▸Filing & Intake Forms10
▸BISBOROUGH INTAKE FORM4
01/22/2019520305223Open ↗
12/07/2018520305223Open ↗
11/26/2018520305223Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
08/10/2017520305223Open ↗
12/22/2014520216597Open ↗
11/07/2013520167131Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/24/2015540072758Open ↗
▸BISADDITIONAL INFORMATION1
03/04/2014520167131Open ↗
▸Other Documents8
▸BISMICROFILM/RECORDS MGMT: ADDL FEE REQUIRED1
07/20/2025500219658Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
02/22/2025500219658Open ↗
▸BIS* HIGH STRENGTH BOLTS TABLE 10-21
02/22/2025500219658Open ↗
▸BISCURB CUT # REQUIRED1
07/20/2025500219658Open ↗
▸BIS* * VENTILATION / AIR CONDITIONING1
02/22/2025500219658Open ↗
▸BIS* SPRAY ON FIREPROOF.-NEW INSTALL 27-324(F)1
02/22/2025500219658Open ↗
▸BIS* FIRE STOPS 27-3451
02/22/2025500219658Open ↗
▸DOB NOWNYS DEC Freshwater Wetlands Map1
08/13/2026S00002920-I1Open ↗