DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
HPD09/25/2024HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS RATS AT PUBLIC HALL, 1st STORY
HPD09/28/2017§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 5, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
DOB04/01/2017THE BOROUGH COMMISSIONER HAS ORDERED AN ADMINISTRATIVE STOP WORK ORDER FOR APPLICATION #140311534. APPROVALS AND PERMIT HAVE BEEN REVOKED. S TOP WORK, MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORTHWITH
ECB09/05/2023FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: AT TIME OF INSPECTION OBSERVED AT THE ROOF LEVEL, OCCUPIED MULTIPLE DWELLING. FIRE ESCAPE AS THE ROOF LEVEL STAIRS NOT SECURED AND BOLTED TO THE ROOF FLOORNothing owed — awaiting certificate of correction
ECB11/21/2022WORK W/O PERMIT.I OBSERVED ACTIVE WORK ON ROOF LEVEL W/4MEN ON ROOF.REMOVAL OF EXISTING WOOD STRUCTURE ON SOUTHSIDE OF ROOF.NEW BLDG MATERIALS OF 4X8 WOOD PLYWOOD BOARDS,NEW LUMBER OF 2X6&4X4 WOOD STUDS FOR NEWNothing owed — awaiting certificate of correction
ECB05/25/2017UNLAWFUL ACTS. FAILURE TO COMPLY W/ AN ORDER OF THE COMMISSIONER'S. IN JULY 8, 2015, MARCH 21, 2017 TWO ELECTRICAL VIOLATIONS WAS ISSUE TO THE RESPONDENT. THE RESPONDENT FAILED TO COMPLY W/ NYC. ELECTRICAL CODENothing owed — awaiting certificate of correction
ECB03/21/2017UNLAWFUL ACTS.FAILURE TO COMPLY WITH AN ORDEROF THE COMMISSIONER.IN MAY 20, 2015, MAY 25,2016, OCTOBER 31, 2016.VIOLATIONS WERE ISSUED TO THE RESPONDENT. THE RESPONDENT FAILED TO COMPLY WITH ELECTRICAL CODE ANDNothing owed — awaiting certificate of correction
ECB10/31/2016UNLAWFUL ACTS. FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER. IN 5/20/15;5/25/15. VIOLATIONS WAS ISSUE TO THE RESPONDENT. THE RESPONDENT FAILED TO COMPLY W/ELECTRICAL CODE 27-3018(A)ADMINISTRATIVE CODE 28-20Nothing owed — awaiting certificate of correction
ECB04/21/2016FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. DEFECT NOTED: CEMENT PLASTER ON EXTERIOR WALL EXP#3 IS LOOSE,CRACKED AT MANY LOCATIONS & IN DANGER OF FALLING IN REAR YARD(PATIO)OF 205 AVE A. REMEDY: REPAIRNothing owed — awaiting certificate of correction
ECB07/08/2015FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS. 400AMP SERVICE SWITCH NOT PROVIDED WITH GROUND CONDUCTOR AT WATER MAIN. RMDY:PROVIDE GROUNDING.Nothing owed — awaiting certificate of correction
ECB05/20/2015ELECTRICAL WORK W/O A PERMIT. OBSERVED AT 11:45AM SERVICE SWITCHES IN BASEMENT AND 200 AMP PANEL INSTALELD ON GROUND FLOOR. NO APPLICATION ON FILE FOR NEW ELECTRICAL WORK. RMDY: OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB08/21/2012WORK NOTED AT TIME OF INSP APT #15 ON 6TH FLOOR HAS BEEN GUTTED TO STUDS PLUMBING REMOVE BTRM ALL WORK PERFORMED W/O PERMIT STOP ALL WORK IN APT 15 MAKE SITE SAFE REM; OBTAIN PERMIT OR RESTORE PREMISES TO PRIORNothing owed — awaiting certificate of correction