Elevator apt, fireproof without stores
444 EAST 82ND STREET
MANHATTAN · BIN 1050396
💬 Discuss this project
1966Year Built
33Stories
D3Building Class
R8BZoning
502,595 sfGross Floor Area
415Units
LL97 CoveredRent Stabilized60 Active Violations 55 unresolved · 5 paperwork only 1 old, status unconfirmed ▸FISP: SWARMP
Elevator apt, fireproof without stores · Owner of record: York Terrace · 42,194 sf lot · 11.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsBroadwall Management1 filing
RoofBroadwall Management3p · 2 filings · 11 docs
Floor 14Unit 15G, Unit 15H2 filings · 8 docs
Floor 13Unit 14M2 filings · 10 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 14 Park AVE. Associates LLC3p · 3 filings · 16 docs
Cellar4 Park AVE. Associates LLC1p · 1 filing · 5 docs
Sub-BasementRoof antenna and equipment installation1 filing · 3 docs
Site & exteriorBroadwall Management4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Clermont York Associates4803/21/2026
York Terrance803/22/2026
Feil Organization603/21/2026
Vidaris507/08/2026
4 Park Ave. Associates504/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Socotec103/21/2025
Gilsanz Murray Steficek206/13/2024
KMB Design Group105/02/2023
Moed de Armas & Shannon109/27/2021
Goldman Copeland Associates509/10/2021
Bromley Caldari Architects201/28/2021
Best Professionals NY111/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates1603/21/2026
Construction Permit Services103/21/2026
William Vittaco Associates203/21/2026
Rybak Development203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Universal Management & ContGeneral Contractor907/08/2026
Andamio ScaffoldingScaffold303/21/2026
Everest ScaffoldingScaffold307/08/2026
ACS Environmental & ConstructionGeneral Contractor303/21/2026
Westside ElectricElectrical203/22/2026
Liberty Custom ContractorsGeneral Contractor203/21/2026
Odyssia Global CommercialGeneral Contractor107/08/2026
Rally Restorationspecialty_contractor104/09/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Avellino Electrical ContractingElectrical103/21/2026
Top Dog Plumbing & HeatingPlumbing107/08/2026
Cogen Electrical ServicesElectrical103/21/2026
Moskowitz StuartElectrical103/21/2026
P.S. Marcato Elev. CoElectrical103/21/2026
Matros Automated ElectricalElectrical103/21/2026
Comfort Zone Mechanicalspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec301103/21/2025
Gilsanz Murray Steficek240306/13/2024
KMB Design Group513205/02/2023
Goldman Copeland Associates2826209/10/2021
Domani Inspection Service843204/28/2020
Building Lifecycle
All (156)Filed (13)Permit Issued (16)Signed Off (6)Facade (FISP) (9)Violation (60)Inspection (6)Objection (20)Special Inspection (26)
04/29/2026
Violation issued (HPD, closed)
A
11/05/2025
Signed off — Alteration
Parking garage repairs. No change in egress, use or occupancy.
M01180196-I1
09/28/2025
Violation issued (HPD, closed)
A
09/12/2025
Violation issued (ECB, open)
Construction
06/27/2025
Signed off — Alteration
Filing for replacement of louvers, duct work, new gooseneck. No change to use, egress, or occupancy.
M00459893-I1
06/04/2025
Violation issued (HPD, closed)
A
05/20/2025
Permit issued — General Construction
M01180196-I1-GC
03/21/2025
Filed — Alteration
Parking garage repairs. No change in egress, use or occupancy.
M01180196-I1
02/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
Stanford Chan
02/12/2025
Special inspection requirement — Final
Stanford Chan
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/16/2025
Violation issued (ECB, closed)
Elevators
01/16/2025
Violation issued (ECB, closed)
Elevators
11/30/2024
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
11/14/2024
Violation issued (ECB, open)
Construction
06/14/2024
Special inspection requirement — Concrete - Cast-In-Place
Philip Murray
06/14/2024
Special inspection requirement — Final
Philip Murray
06/14/2024
Special inspection requirement — Post-installed Anchors
Philip Murray
06/13/2024
Filed — Alteration
Filing for structural work in the courtyard. Work includes new 12 concrete curb fence, new concrete walls, replaced concrete posts, replace concrete slab finish with pavers. No change to use, egress, or occupancy.
M00460045-P1
05/20/2024
Violation issued (HPD, closed)
C
01/18/2024
Signed off — Alteration
M00723097-I1
12/07/2023
Violation issued (HPD, closed)
C
07/05/2023
Permit issued — Antenna
M00723097-I1-AN
05/02/2023
Filed — Alteration
M00723097-I1
04/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/21/2023
Permit issued — Structural
M00460045-I1-ST
03/16/2023
Violation issued (HPD, closed)
A
03/08/2023
Permit issued — General Construction
M00460085-I1-GC
03/08/2023
Permit issued — Mechanical Systems
M00459893-I1-MS
11/22/2022
Permit issued — Plumbing
M00459933-I1-PL
10/24/2022
Signed off — Alteration
M00445794-I1
10/04/2022
Signed off — Alteration
Modification to existing plumbing system AS SHOWN ON PLANS, APT #14M (Const. FL 13 / MKT FL 14) . RELATED FILING M00445794. Filed to address violation SWO#1555919, ECB#35537233Z.
M00445900-I1
04/20/2022
Violation issued (HPD, closed)
C
03/16/2022
Permit issued — General Construction
M00460085-I1-GC
03/15/2022
Permit issued — Structural
M00460045-I1-ST
03/15/2022
Permit issued — Mechanical Systems
M00459893-I1-MS
03/15/2022
Cycle 9 facade report submitted
03/09/2022
Cycle 9 facade report signed — SWARMP
03/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/16/2022
Violation issued (HPD, closed)
A
02/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2022
Cycle 9 facade inspection completed
01/03/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY 75' HIGH PIPE SCAFFOLD ORIGINATING (OFF ROOF) FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE
M00268051-I1
12/26/2021
Violation issued (HPD, closed)
B
12/26/2021
Violation issued (HPD, closed)
B
12/26/2021
Violation issued (HPD, closed)
B
12/26/2021
Violation issued (HPD, closed)
A
12/26/2021
Violation issued (HPD, closed)
B
12/26/2021
Violation issued (HPD, closed)
B
11/03/2021
Objection raised — Scope
11/03/2021
Objection resolved — Addressed
10/31/2021
Permit issued — Plumbing
M00445900-I1-PL
10/21/2021
Permit issued — Mechanical Systems
M00453411-I1-MS
10/19/2021
Permit issued — General Construction
M00445794-I1-GC
10/01/2021
Objection raised — Scope
10/01/2021
Objection resolved — Addressed
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRally Restoration05/20/2025
DOB NOWAntennaSigned-offOdyssia Global Commercial07/05/2023
DOB NOWStructuralPermit IssuedUniversal Management & Cont03/21/2023
DOB NOWGeneral ConstructionPermit IssuedUniversal Management & Cont03/08/2023
DOB NOWMechanical SystemsSigned-offUniversal Management & Cont03/08/2023
DOB NOWPlumbingPermit IssuedBedrock Plumbing & Heating11/22/2022
DOB NOWGeneral ConstructionPermit IssuedUniversal Management & Cont03/16/2022
DOB NOWStructuralPermit IssuedUniversal Management & Cont03/15/2022
DOB NOWMechanical SystemsSigned-offUniversal Management & Cont03/15/2022
DOB NOWPlumbingSigned-offTop Dog Plumbing & Heating10/31/2021
DOB NOWMechanical SystemsPermit IssuedComfort Zone Mechanical10/21/2021
DOB NOWGeneral ConstructionSigned-offACS Environmental & Construction10/19/2021
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding09/30/2021
DOB NOWGeneral ConstructionSigned-offLiberty Custom Contractor05/21/2021
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding11/23/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding11/21/2019
BISOTISSUEDAwr Group07/21/2021
BISEQISSUEDEverest Scaffolding03/09/2021
BISEQISSUEDAwr Group10/07/2020
BISEQISSUEDEverest Scaffolding03/04/2020
BISOTISSUEDAwr Group01/08/2020
BISEQRE-ISSUEDAwr Group09/20/2019
BISEQISSUEDEverest Scaffolding02/26/2019
BISOTISSUEDAwr Group09/25/2018
BISEQISSUEDAwr Group09/21/2018
BISEQISSUEDEverest Scaffolding02/21/2018
BISPLISSUEDMaxwell Plumbing Mechanical11/01/2017
BISOTISSUEDLiberty Custom Contractors10/20/2017
BISEQISSUEDAwr Group09/29/2017
BISOTISSUEDAwr Group09/15/2017
BISOTISSUEDAwr Group05/18/2017
BISEQISSUEDEverest Scaffolding02/21/2017
BISOTISSUEDComfort Zone Mechanical12/20/2016
BISMHISSUEDComfort Zone Mechanical12/20/2016
BISOTISSUEDAwr Group10/03/2016
BISPLISSUEDMaxwell Plumbing Mechanical09/28/2016
BISOTISSUEDLiberty Custom Contractors09/22/2016
BISOTISSUEDComfort Zone Mechanical02/22/2016
BISMHISSUEDComfort Zone Mechanical02/22/2016
BISOTISSUEDSquan Construction Services10/06/2015
+ 26 more permits on file
2 projects · most recent 03/05/2021
Cooling Towers Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
03/05/2021Permit IssuedComfort Zone MechanicalCooling Towers
Cooling Tower
Marley NC-8403PAN4 338,470 CFM · Cooling Tower ×4
04/28/2020——Associated Ducts and Piping—
1 project · most recent 09/10/2021
Storm Water/Sanitary
FiledStatusContractorScope
09/10/2021Permit IssuedBedrock Plumbing & HeatingStorm, Water/Sanitary
14 projects · most recent 07/07/2025
General Wiring
FiledStatusContractorScope
07/07/2025Permit IssuedP.S. Marcato Elev. Co—
07/07/2025Permit IssuedP.S. Marcato Elev. Co—
05/04/2023Permit IssuedAssociated Electric Cont of NGeneral Wiring
07/13/2022CompleteJoseph Weinstein ElectricGeneral Wiring
03/09/2021CompleteP.S. Marcato Elev. Co—
03/09/2021CompleteP.S. Marcato Elev. Co—
11/24/2020CompletePower Tech ElectricGeneral Wiring
10/16/2020Permit IssuedWestside ElectricGeneral Wiring
03/17/2020CompleteMatros Automated Electrical—
03/04/2020CompleteMatros Automated ElectricalGeneral Wiring
02/04/2020CompleteWestside ElectricGeneral Wiring
01/24/2020CancelledWestside ElectricGeneral Wiring
09/20/2019CompleteLeone Electric CoGeneral Wiring
01/26/2018CompleteMatros Automated ElectricalGeneral Wiring
1 project · most recent 06/13/2024
Concrete
FiledStatusContractorScope
06/13/2024Permit IssuedUniversal Management & ContConcrete
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/07/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
02/12/2025Tenant Protection Plan ComplianceStanford Chanspecial
02/12/2025FinalStanford Chanprogress
06/14/2024Concrete - Cast-In-PlacePhilip Murrayspecial
06/14/2024FinalPhilip Murrayprogress
06/14/2024Post-installed AnchorsPhilip Murrayspecial
09/03/2021Maintenance informationDANIEL COLOMBINIenergy_progress
09/03/2021Post-installed AnchorsPhilip Murrayspecial
09/03/2021Exterior lighting powerDANIEL COLOMBINIenergy_progress
09/03/2021Lighting controlsDANIEL COLOMBINIenergy_progress
09/03/2021HVAC-R and service water piping design and insulationDANIEL COLOMBINIenergy_progress
05/28/2021FinalDANIEL SHANNONprogress
02/09/2021Maintenance informationDANIEL COLOMBINIenergy_progress
02/09/2021HVAC-R and service water heating equipmentDANIEL COLOMBINIenergy_progress
02/09/2021HVAC-R and service water heating system controlsDANIEL COLOMBINIenergy_progress
01/26/2021Lighting controlsJerry Caldarienergy_progress
01/26/2021Lighting in dwelling unitsJerry Caldarienergy_progress
01/25/2021Mechanical SystemsDANIEL COLOMBINIspecial
01/25/2021FinalDANIEL COLOMBINIprogress
01/13/2021FinalDANIEL COLOMBINIprogress
01/13/2021Mechanical SystemsDANIEL COLOMBINIspecial
12/31/2020FinalJerry Caldariprogress
04/28/2020HVAC insulation and sealing JOHN MCMONAGLEenergy_progress
04/27/2020Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
01/31/2020Mechanical SystemsJOHN MCMONAGLEspecial
01/31/2020FinalJOHN MCMONAGLEprogress
Latest 25 of 26.
▾Documents — 410 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00307618-I1Request digital key ↗
09/04/2026M00445900-I1Request digital key ↗
09/03/2026M00459933-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00453411-I1Request digital key ↗
08/15/2026M00459893-I1Request digital key ↗
08/14/2026M00307608-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00445794-I1Request digital key ↗
09/03/2026M00460085-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/27/2026M00460045-P1Request digital key ↗
08/14/2026M00460045-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/31/2026M00723097-I1Request digital key ↗
08/24/2026M01180196-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00268051-I1Request digital key ↗
▸Applications & Permits80
▸BISPLAN / WORK APPROVAL APPLICATION42
09/18/2020140933578Open ↗
12/12/2019104837508Open ↗
12/10/2019104837508Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION36
03/23/2021104837508Open ↗
11/30/2020104837508Open ↗
10/07/2020140699536Open ↗
Showing 3 of 36 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
06/20/2018122683373Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications109
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
06/20/2018122683373Open ↗
03/16/2018123341874Open ↗
12/22/2017121284868Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/07/2026M00460085-I1Open ↗
09/07/2026M00460085-I1Open ↗
09/07/2026M00460085-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/05/2026M00307618-I1Open ↗
09/03/2026M00460085-I1Open ↗
08/24/2026M01180196-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
10/17/2017123341874Open ↗
05/22/2017121284877Open ↗
09/29/2016122884842Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
10/17/2017123341874Open ↗
09/27/2017140699536Open ↗
05/22/2017121284877Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/07/2026M00460085-I1Open ↗
09/01/2026M00459893-I1Open ↗
09/01/2026M00453411-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/27/2017140699536Open ↗
04/06/2017140618339Open ↗
02/17/2017140607699Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/27/2017140699536Open ↗
04/06/2017140618339Open ↗
02/17/2017140607699Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/18/2020140933578Open ↗
▸Trade Schedules & Equipment21
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
12/28/2017123341874Open ↗
12/26/2017123341874Open ↗
10/17/2017123341874Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
06/20/2018122683373Open ↗
12/04/2017122683373Open ↗
12/04/2017122683373Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
06/20/2018122683373Open ↗
12/04/2017122683373Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes8
10/17/2017123341874Open ↗
05/22/2017121284877Open ↗
05/18/2017121284868Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00307608-I1Open ↗
08/13/2026M00268051-I1Open ↗
08/13/2026M00307618-I1Open ↗
▸Environmental & Asbestos27
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
10/17/2017123341874Open ↗
05/22/2017121284877Open ↗
05/18/2017121284868Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/03/2026M00460085-I1Open ↗
08/24/2026M01180196-I1Open ↗
08/13/2026M00459893-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/05/2026M00307618-I1Open ↗
08/13/2026M00445794-I1Open ↗
08/13/2026M00445900-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/28/2021140933578Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
06/20/2018122683373Open ↗
12/22/2017121284868Open ↗
10/25/2017121695086Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
06/20/2018122683373Open ↗
03/16/2018123341874Open ↗
10/25/2017121695086Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00460085-I1Open ↗
08/13/2026M00445794-I1Open ↗
08/13/2026M00459893-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/06/2020140933578Open ↗
09/18/2020140933578Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY9
09/15/2023104837508Open ↗
01/27/2022104837508Open ↗
01/08/2022140607699Open ↗
Showing 3 of 9 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
02/01/2022104837508Open ↗
▸Approvals, Objections & Sign-offs34
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
06/20/2018122683373Open ↗
03/16/2018123341874Open ↗
10/25/2017121695086Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
03/06/2020140607699Open ↗
03/06/2020140607699Open ↗
02/23/2018140607699Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSHED LETTER3
03/10/2021140607699Open ↗
02/26/2019140607699Open ↗
02/26/2019140607699Open ↗
▸BISSUPERSEDING LETTER1
07/08/2020104837508Open ↗
▸BISFINAL1
01/08/2022140607699Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT30
09/18/2020140933578Open ↗
06/20/2018122683373Open ↗
03/16/2018123341874Open ↗
Showing 3 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/15/2023104837508Open ↗
▸Filing & Intake Forms44
▸BISEFILING COVER SHEET15
10/17/2017123341874Open ↗
05/22/2017121284877Open ↗
05/22/2017121284877Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION13
03/27/2021140933578Open ↗
09/24/2020140933578Open ↗
09/19/2019140699536Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM11
03/10/2021140607699Open ↗
03/10/2021140607699Open ↗
03/05/2021140607699Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
09/18/2020140933578Open ↗
09/27/2017140699536Open ↗
04/06/2017140618339Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/16/2018123341874Open ↗
Showing 1 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
02/17/2017140607699Open ↗