← Back
Two family brick
4442 FURMAN AVENUE
BRONX · BIN 2070754
💬 Discuss this project
2023Year Built
—Stories
B1Building Class
R5Zoning
2,934 sfGross Floor Area
2Units
10 Open Violations ▸
Two family brick · Owner of record: MAIN PROPERTIES 101 CORP. · 2,375 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STELLA INDUSTRIES INC603/22/2026
HARRYS DESIGN203/22/2026
223 ASSETS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC406/26/2024
AUTOMATED DESIGN ENGINEERING, PLLC101/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor703/22/2026
STELLAR INDUSTRIES INCGeneral Contractor303/21/2026
YAFE MEOD CORPGeneral Contractor303/21/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495306/26/2024
Building Lifecycle
All (81)Filed (5)Permit Issued (4)Signed Off (4)Violation (18)Inspection (7)Objection (32)Special Inspection (11)
07/29/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, open)
B
07/14/2025
Violation issued (HPD, open)
I
07/12/2025
Violation issued (HPD, open)
C
07/12/2025
Violation issued (HPD, open)
A
07/12/2025
Violation issued (HPD, open)
C
07/12/2025
Violation issued (HPD, open)
B
10/11/2024
Signed off — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#220593926. The system is hydraulically calculated. There is no change in use occupancy or egress.
X00449112-I1
10/10/2024
Signed off — Alteration
8' FEET HIGH CONSTRUCTION TEMPORARY FENCE PLYWOOD
X08047579-I1
08/26/2024
Signed off — Alteration
THIS APPL. IS BEING FILED FOR PLUMBING. PLUMBING WORK ON CELLAR, 1ST THRU 3RD FLOOR.
X00290023-I1
08/14/2024
Signed off — Alteration
THIS APPLICATION IS BEING FILED FOR CURB CUT.
X00289965-I1
07/09/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/01/2024
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
07/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
07/01/2024
Special inspection requirement — HVAC and service water heating system controls
Rajasekhar Sakhamuri
07/01/2024
Special inspection requirement — HVAC and service water heating equipment
Rajasekhar Sakhamuri
06/26/2024
Filed — Alteration
THIS APPL. IS BEING FILED FOR PLUMBING. PLUMBING WORK ON CELLAR, 1ST THRU 3RD FLOOR.
X00290023-P1
06/21/2024
Permit issued — Curb Cut
X00289965-I1-CC
06/18/2024
Special inspection requirement — HVAC and service water heating system controls
Rajasekhar Sakhamuri
06/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
06/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
06/18/2024
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
06/18/2024
Special inspection requirement — HVAC and service water heating equipment
Rajasekhar Sakhamuri
04/02/2024
Filed — Alteration
THIS APPLICATION IS BEING FILED FOR CURB CUT.
X00289965-I1
11/03/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/31/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/25/2023
Permit issued — Sprinklers
X00449112-I1-EW-SP
05/19/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/19/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/14/2023
Violation issued (ECB, closed)
Construction
04/14/2023
Violation issued (ECB, closed)
Construction
04/07/2023
Violation issued (ECB, closed)
Construction
04/07/2023
Violation issued (ECB, closed)
Construction
04/07/2023
Violation issued (ECB, closed)
Construction
04/07/2023
Violation issued (ECB, closed)
Construction
01/23/2023
Permit issued — Plumbing
X00290023-I1-PL
12/13/2022
Permit issued — Construction Fence
X08047579-I1-FN
12/08/2022
Filed — Alteration
8' FEET HIGH CONSTRUCTION TEMPORARY FENCE PLYWOOD
X08047579-I1
01/07/2021
Filed — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#220593926. The system is hydraulically calculated. There is no change in use occupancy or egress.
X00449112-I1
01/07/2021
Special inspection requirement — Sprinkler Systems
Rajasekhar Sakhamuri
08/07/2020
Objection raised — Admin
08/07/2020
Objection resolved — Addressed
08/07/2020
Objection raised — Admin
08/07/2020
Objection resolved — Addressed
08/07/2020
Objection raised — Fire_Protection
08/07/2020
Objection resolved — Addressed
08/07/2020
Objection raised — Scope
08/07/2020
Objection resolved — Addressed
08/07/2020
Objection raised — Mechanical
08/07/2020
Objection resolved — Addressed
08/07/2020
Objection raised — Scope
08/07/2020
Objection resolved — Addressed
08/07/2020
Objection raised — Inspections
08/07/2020
Objection resolved — Addressed
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offYAFE MEOD CORP06/21/2024
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC10/25/2023
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI01/23/2023
DOB NOWConstruction FenceSigned-offSTELLAR INDUSTRIES INC12/13/2022
BIS—ISSUEDPRECISION HOME DEV INC11/15/2023
BIS—ISSUEDPRECISION HOME DEV INC11/03/2023
BIS—ISSUEDSTELLAR INDUSTRIES INC11/28/2022
BIS—ISSUEDSTELLAR INDUSTRIES INC11/28/2022
BIS—ISSUEDHARRY'S DESIGN INC10/22/2018
BISEQISSUEDHARRY'S DESIGN INC10/11/2018
1 project · most recent 05/03/2023
General Wiring
FiledStatusContractorScope
05/03/2023CompleteWEBSTAR ELECL CONTRS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/09/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/03/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/31/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/19/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/01/2024Maintenance informationRajasekhar Sakhamurienergy_progress
07/01/2024Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
07/01/2024Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
07/01/2024HVAC and service water heating system controls Rajasekhar Sakhamurienergy_progress
07/01/2024HVAC and service water heating equipment Rajasekhar Sakhamurienergy_progress
06/18/2024HVAC and service water heating system controls Rajasekhar Sakhamurienergy_progress
06/18/2024Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
06/18/2024Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
06/18/2024Maintenance informationRajasekhar Sakhamurienergy_progress
06/18/2024HVAC and service water heating equipment Rajasekhar Sakhamurienergy_progress
01/07/2021Sprinkler SystemsRajasekhar Sakhamurispecial
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026X00290023-P1Request digital key ↗
08/15/2026X00290023-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/23/2026X08047579-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/21/2026X00289965-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/25/2026X00449112-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION10
05/12/2025220593926Open ↗
05/06/2025220593926Open ↗
04/09/2025220593926Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION6
11/17/2023220593926Open ↗
11/29/2022220593926Open ↗
11/29/2022220593926Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/29/2023220593926Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
05/17/2024220593926Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/17/2024220593926Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/22/2019220593926Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026X00290023-I1Open ↗
08/27/2026X00290023-I1Open ↗
08/27/2026X00290023-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026X00290023-P1Open ↗
08/26/2026X00290023-I1Open ↗
08/21/2026X00289965-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/29/2022220593926Open ↗
11/22/2019220593926Open ↗
05/12/2017220551169Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026X00290023-I1Open ↗
08/27/2026X00449112-I1Open ↗
08/23/2026X00290023-P1Open ↗
▸Trade Schedules & Equipment5
▸BISSEWER CONNECTION: DEP SD1 & SD21
10/23/2018220551169Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/19/2024220593926Open ↗
▸BISELECTRIC CUT-OFF1
10/23/2018220551169Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/19/2024220593926Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/28/2024220593926Open ↗
▸Safety & Tenant Protection8
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
10/23/2018220551169Open ↗
05/12/2017220551169Open ↗
▸BISSTREET TREE CHECKLIST2
10/23/2024220593926Open ↗
11/22/2019220593926Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
07/19/2024220593926Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/23/2018220551169Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/28/2022220593926Open ↗
▸BISSTREET TREE SIGNOFF1
07/17/2024220593926Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/23/2018220551169Open ↗
05/12/2017220551169Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/29/2022220593926Open ↗
11/22/2019220593926Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/19/2024220593926Open ↗
▸BISINTERIOR LIGHTING POWER1
07/19/2024220593926Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/19/2024220593926Open ↗
▸BISFENESTRATION AREAS1
07/19/2024220593926Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
01/21/2025220593926Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/29/2020220593926Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/19/2024220593926Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/19/2024220593926Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/22/2024220593926Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/19/2024220593926Open ↗
▸BISLIGHTING CONTROLS1
07/19/2024220593926Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00290023-I1Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/29/2020220593926Open ↗
07/29/2020220593926Open ↗
07/29/2020220593926Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
07/17/2024220593926Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
07/19/2024220593926Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/19/2024220593926Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/19/2024220593926Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/19/2024220593926Open ↗
▸BISMASONRY1
07/19/2024220593926Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
07/19/2024220593926Open ↗
▸BISSOIL REPORT1
07/29/2020220593926Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
10/10/2024220593926Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/29/2022220593926Open ↗
▸Approvals, Objections & Sign-offs24
▸BISLETTERS - SUPPORTING DOCUMENTATION13
11/29/2022220593926Open ↗
11/29/2022220593926Open ↗
11/09/2021220593926Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
05/12/2025220593926Open ↗
05/06/2025220593926Open ↗
02/26/2025220593926Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER1
11/17/2023220593926Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
10/23/2018220551169Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/12/2018220551169Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION5
05/19/2025220593926Open ↗
04/16/2025220593926Open ↗
10/23/2024220593926Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
11/01/2023220593926Open ↗
04/08/2020220593926Open ↗
03/31/2020220593926Open ↗
▸BISEFILING COVER SHEET2
11/22/2019220593926Open ↗
05/12/2017220551169Open ↗
▸Other Documents11
▸BISPLOT DIAGRAM2
11/22/2019220593926Open ↗
11/22/2019220593926Open ↗
▸BISPRELIMINARY1
07/19/2024220593926Open ↗
▸BISSHUTOFF DAMPERS1
07/19/2024220593926Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
07/29/2020220593926Open ↗
▸BISLOWEST FLOOR ELEVATION1
07/29/2020220593926Open ↗
▸BISMAINTENANCE INFORMATION1
07/19/2024220593926Open ↗
▸BISPERMANENT CERTIFICATE1
07/19/2024220593926Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/19/2024220593926Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
07/17/2024220593926Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
07/29/2020220593926Open ↗