445 EAST 86TH STREET
MANHATTAN · BIN 1050550
💬 Discuss this project
1961Year Built
16Stories
D4Building Class
R10AZoning
153,347 sfGross Floor Area
155Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator cooperative · Owner of record: 445/86 Owners Corp C/O BHS · 14,275 sf lot · 10.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFISP facade inspection program7p · 2 filings · 10 docs
BulkheadFISP facade inspection program1p · 1 filing · 8 docs
Floor 14Unit 14G3p · 1 filing · 9 docs
Floor 13
Floor 12Unit 12D, Unit 12CD5p · 2 filings · 19 docs
Floor 11Unit 11CD3p · 1 filing · 13 docs
Floor 10Unit 10I, Unit 10J, Unit 10CD2p · 2 filings · 13 docs
Floor 9
Floor 8Unit 8H, Unit 8J20p · 3 filings · 13 docs
Floor 7
Floor 6Unit 6F1p · 1 filing · 5 docs
Floor 5Unit 5I, Unit 5AJUnder Construction11p · 2 filings · 16 docs
Floor 4
Floor 3Unit 3A, Unit 3B3p · 1 filing · 4 docs
Floor 2
Floor 1Concrete wall and slab crack repairUnder Construction21p · 2 filings · 20 docs
CellarConcrete wall and slab crack repairUnder Construction11p · 2 filings · 11 docs
Site & exteriorFISP facade inspection program11p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
445 86 Owners7003/22/2026
445 86 Owners Corp %Halstead Management1103/21/2026
Bracewell203/21/2026
Quantum Design103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA Design Group403/21/2026
Edi Consulting Group203/21/2026
Clarke Construction Consultants103/21/2026
EDG103/21/2026
AE Design Solution403/21/2026
Robert R Bisaccia603/21/2026
Christopher Teeter RA403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Construction & StoneGeneral Contractor1007/08/2026
H Bronner & Son Plumbing & HeatingPlumbing307/08/2026
Arctic HVACspecialty_contractor303/21/2026
Everest ScaffoldingScaffold307/08/2026
Star Construction & DesGeneral Contractor204/09/2026
Amsterdam ElectricElectrical203/21/2026
H & D Maintenance CoGeneral Contractor210/04/2026
Alklem PlumbingPlumbing207/08/2026
Drilon Plumbing & HeatingPlumbing207/08/2026
Lawrence Exterior Restorationspecialty_contractor107/08/2026
P K RemodelingGeneral Contractor107/08/2026
Lawrence Exterior RestorationScaffold107/08/2026
New York Standard MechanicalPlumbing107/08/2026
Vertex P & HPlumbing107/08/2026
A&E Electrical Systems CoElectrical103/22/2026
Water Dynamic P & HPlumbing107/08/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Einstein ElectricalElectrical103/22/2026
Elpo Electrical ContgElectrical103/22/2026
Empire Lic Electrical ContractorsElectrical103/22/2026
R & L SystemsElectrical103/21/2026
Todaro JosephElectrical103/21/2026
Alban ConstructionGeneral Contractor107/08/2026
Exo IndustriesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG Engineering8899206/30/2026
EDG2578206/30/2026
Nicholas A Cichanowski AR8516106/03/2026
A. Giannopoulos Architect2196202/10/2026
Thomas Veltre, P.E459202/15/2024
Zaskorski & Associates AR6121107/05/2023
Capobianco Engineering GR6763207/13/2022
Dmad4628406/07/2022
H. A. Bader Consultants2332105/18/2022
Chen Engineering Services1826104/22/2020
Building Lifecycle
All (208)Filed (28)Permit Issued (27)Signed Off (15)Facade (FISP) (15)Violation (47)Inspection (11)Objection (35)Special Inspection (30)
09/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/15/2026
Filed — Alteration
RELOCATE 1 LAVATORY & 1 SINK PER PLAN. REPLACE 1 SHOWER & 1 WATER CLOSET PER PLAN. REMOVE 1 DISHWASHER. REMOVAL & REPLACEMENT OF BRANCH SUPPLY AND SANITARY PLUMBING LINES ASSOCIATED WITH RELOCATED PLUMBING FIXTURES. REPLACE GAS RANGE IN EXISTING LOCATION
M01384477-P1
09/15/2026
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS CICHANOWSKI
07/28/2026
Objection raised — Accessibility
06/30/2026
Filed — Alteration
Garage repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01268754-P1
06/26/2026
Cycle 10 facade report submitted
06/26/2026
Cycle 10 facade report signed — SWARMP
06/17/2026
Cycle 10 facade inspection completed
06/12/2026
Permit issued — Plumbing
M01384477-S1-PL
06/10/2026
Permit issued — General Construction
M01384477-I1-GC
06/08/2026
Objection resolved — Addressed
06/08/2026
Objection resolved — Addressed
06/08/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/04/2026
Objection raised — Other
06/04/2026
Objection raised — Scope
06/04/2026
Objection raised — Other
06/04/2026
Objection raised — Other
06/03/2026
Filed — Alteration
RELOCATE 1 LAVATORY & 1 SINK PER PLAN. REPLACE 1 SHOWER & 1 WATER CLOSET PER PLAN. REMOVE 1 DISHWASHER. REMOVAL & REPLACEMENT OF BRANCH SUPPLY AND SANITARY PLUMBING LINES ASSOCIATED WITH RELOCATED PLUMBING FIXTURES. REPLACE GAS RANGE IN EXISTING LOCATION
M01384477-S1
06/03/2026
Filed — Alteration
RELOCATE 1 LAVATORY & 1 SINK PER PLAN. REPLACE 1 SHOWER & 1 WATER CLOSET PER PLAN. REMOVE 1 DISHWASHER. REMOVAL & REPLACEMENT OF BRANCH SUPPLY AND SANITARY PLUMBING LINES ASSOCIATED WITH RELOCATED PLUMBING FIXTURES. REPLACE GAS RANGE IN EXISTING LOCATION
M01384477-I1
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS CICHANOWSKI
05/20/2026
Special inspection requirement — Lighting in dwelling units
NICHOLAS CICHANOWSKI
04/29/2026
Permit issued — Structural
M01268754-I1-GC-CX
04/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS CICHANOWSKI
04/08/2026
Special inspection requirement — Final
NICHOLAS CICHANOWSKI
03/12/2026
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS,. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01298816-I1
03/11/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/09/2026
Permit issued — General Construction
M01358019-I1-GC
02/10/2026
Filed — Alteration
M01358019-I1
01/09/2026
Objection resolved — Addressed
01/09/2026
Objection resolved — Addressed
12/09/2025
Objection raised — Cost
12/09/2025
Objection raised — Scope
12/05/2025
Permit issued — General Construction
M01298816-I1-GC
11/19/2025
Filed — Alteration
Garage repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01268754-I1
11/03/2025
Objection raised — Scope
11/03/2025
Objection resolved — Addressed
10/07/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS,. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01298816-I1
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANASTASIOS GIANNOPOULOS
10/07/2025
Special inspection requirement — Interior lighting power
ANASTASIOS GIANNOPOULOS
07/15/2025
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES IN THE LOBBY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00961347-I1
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/28/2024
Signed off — Alteration
GENERAL CONSTRUCTION WORK TO RENOVATE APARTMENT 14G ON 14TH FLOOR. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00819529-I1
04/25/2024
Permit issued — General Construction
M00961347-I1-GC
02/15/2024
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES IN THE LOBBY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00961347-P1
02/15/2024
Special inspection requirement — Final
William Lenart
02/15/2024
Special inspection requirement — Air barrier - visual inspection
Thomas Veltre
02/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Thomas Veltre
02/15/2024
Special inspection requirement — Lighting controls
Thomas Veltre
02/15/2024
Special inspection requirement — Interior lighting power
Thomas Veltre
02/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Thomas Veltre
02/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Thomas Veltre
02/15/2024
Special inspection requirement — Fenestration areas
Thomas Veltre
02/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Veltre
02/13/2024
Special inspection requirement — Lighting controls
Thomas Veltre
02/13/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Thomas Veltre
02/13/2024
Special inspection requirement — Air barrier - visual inspection
Thomas Veltre
02/13/2024
Special inspection requirement — Fenestration areas
Thomas Veltre
02/13/2024
Special inspection requirement — Final
William Lenart
02/13/2024
Special inspection requirement — Interior lighting power
Thomas Veltre
Latest 60 of 208 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVertex P & H06/12/2026
DOB NOWGeneral ConstructionPermit IssuedNY Construction & Stone06/10/2026
DOB NOWStructuralPermit IssuedExo Industries04/29/2026
DOB NOWGeneral ConstructionPermit IssuedStar Construction & Des03/09/2026
DOB NOWGeneral ConstructionSigned-offStar Construction & Des12/05/2025
DOB NOWGeneral ConstructionSigned-offAlban Construction04/25/2024
DOB NOWGeneral ConstructionSigned-offP K Remodeling09/14/2023
DOB NOWPlumbingSigned-offAlklem Plumbing07/21/2023
DOB NOWGeneral ConstructionSigned-offNY Construction & Stone01/09/2023
DOB NOWPlumbingSigned-offAlklem Plumbing08/19/2022
DOB NOWPlumbingSigned-offNew York Standard Mechanical07/23/2022
DOB NOWGeneral ConstructionSigned-offH & D Maintenance Co07/14/2022
DOB NOWPlumbingSigned-offHydro Plumbing & Heating07/06/2022
DOB NOWGeneral ConstructionSigned-offNY Construction & Stone06/21/2022
DOB NOWGeneral ConstructionSigned-offNY Construction & Stone05/11/2022
DOB NOWGeneral ConstructionSigned-offArctic HVAC08/05/2021
DOB NOWGeneral ConstructionSigned-offLawrence Exterior Restoration05/20/2021
DOB NOWPlumbingSigned-offH Bronner & Son Plumbing & HT05/06/2021
DOB NOWPlumbingSigned-offDrilon Plumbing & Heating03/15/2021
DOB NOWSupported ScaffoldPermit IssuedLawrence Exterior Restoration03/11/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding01/26/2021
DOB NOWStructuralSigned-offNY Construction & Stone01/14/2021
DOB NOWPlumbingSigned-offH Bronner & Son Plumbing & HT09/17/2020
DOB NOWStructuralSigned-offNY Construction & Stone09/01/2020
DOB NOWPlumbingSigned-offH Bronner & Son Plumbing & HT07/02/2020
DOB NOWPlumbingSigned-offDrilon Plumbing & Heating03/03/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding06/12/2019
BISOTISSUEDNY Construction & Stone01/03/2021
BISOTISSUED3-Rt's General Contractor06/15/2020
BISOTISSUEDLawrence Exterior Restoration03/03/2020
BISOTISSUEDNY Construction & Stone02/14/2020
BISOTISSUEDNY Construction & Stone01/13/2020
BISPLISSUEDOrbit Plumbing & Heating12/12/2019
BISOTISSUEDNY Construction & Stone09/30/2019
BISOTISSUEDLawrence Exterior Restoration06/14/2019
BISOTISSUEDNY Construction & Stone05/20/2019
BISOTISSUEDCrystal Comfort02/07/2018
BISOTISSUEDNY Construction & Stone01/12/2018
BISSPISSUEDPrecision Plumbing Services12/19/2017
BISOTISSUEDCrystal Comfort11/30/2017
+ 37 more permits on file
2 projects · most recent 09/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/15/2026Permit IssuedVertex P & HGas, Water/Sanitary
06/07/2022Signed-offNew York Standard Mechanical CoGas, Water/Sanitary
25 projects · most recent 08/10/2026
General Wiring
FiledStatusContractorScope
08/10/2026Permit IssuedArcPoint ElectricalGeneral Wiring
07/02/2026Permit IssuedAni ElectricGeneral Wiring
06/18/2026CompleteAni Electric—
03/17/2026CompleteAmsterdam ElectricGeneral Wiring
03/04/2026CompleteAmsterdam ElectricGeneral Wiring
02/13/2026Permit IssuedAmsterdam ElectricGeneral Wiring
02/02/2026Permit IssuedAmsterdam ElectricGeneral Wiring
11/05/2025Permit IssuedRM Electric CoGeneral Wiring
09/16/2025CompleteLimitless Electric Resources—
07/11/2025CompleteAmsterdam ElectricGeneral Wiring
04/23/2025CompleteAxcel Electric Co—
03/13/2025CompletePK ElectricGeneral Wiring
01/08/2025Permit IssuedPK ElectricGeneral Wiring
12/09/2024Permit IssuedPK ElectricGeneral Wiring
06/18/2024CompleteEinstein ElectricalGeneral Wiring
1 project · most recent 06/30/2026
Concrete
FiledStatusContractorScope
06/30/2026Permit IssuedExo IndustriesConcrete
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2026Pass-Final General Construction Non-Directive 14PassView ↗
08/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
09/15/2026Energy Code Compliance InspectionsNICHOLAS CICHANOWSKIprogress
05/20/2026Lighting in dwelling unitsNICHOLAS CICHANOWSKIenergy_progress
05/20/2026Energy Code Compliance InspectionsNICHOLAS CICHANOWSKIprogress
04/08/2026Fire-Resistant Penetrations and JointsNICHOLAS CICHANOWSKIspecial
04/08/2026FinalNICHOLAS CICHANOWSKIprogress
10/07/2025Fire-Resistant Penetrations and JointsANASTASIOS GIANNOPOULOSspecial
10/07/2025Interior lighting powerANASTASIOS GIANNOPOULOSenergy_progress
02/15/2024Air barrier - visual inspectionThomas Veltreenergy_progress
02/15/2024FinalWilliam Lenartprogress
02/15/2024Energy Code Compliance InspectionsThomas Veltreprogress
02/15/2024Fire-Resistant Penetrations and JointsThomas Veltrespecial
02/15/2024Tenant Protection Plan ComplianceThomas Veltrespecial
02/15/2024Lighting controlsThomas Veltreenergy_progress
02/15/2024Fenestration areasThomas Veltreenergy_progress
02/15/2024Interior lighting powerThomas Veltreenergy_progress
02/15/2024Fenestration and door U-factor and product ratingsThomas Veltreenergy_progress
02/13/2024Fire-Resistant Penetrations and JointsThomas Veltrespecial
02/13/2024Tenant Protection Plan Compliance—special
02/13/2024Energy Code Compliance InspectionsThomas Veltreprogress
02/13/2024FinalWilliam Lenartprogress
02/13/2024Fenestration areasThomas Veltreenergy_progress
02/13/2024Air barrier - visual inspectionThomas Veltreenergy_progress
02/13/2024Interior lighting powerThomas Veltreenergy_progress
02/13/2024Fenestration and door U-factor and product ratingsThomas Veltreenergy_progress
02/13/2024Lighting controlsThomas Veltreenergy_progress
Latest 25 of 61.
▾Documents — 582 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch20
09/04/2026M00480552-I1Request digital key ↗
09/03/2026M00485369-I1Request digital key ↗
09/03/2026M00548595-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00306449-I1Request digital key ↗
09/05/2026M00323344-P1Request digital key ↗
08/15/2026M00306449-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00171782-I1Request digital key ↗
09/04/2026M00459004-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00339802-I1Request digital key ↗
▸Applications & Permits87
▸BISWORK PERMIT APPLICATION48
06/02/2021102225058Open ↗
06/15/2020140888797Open ↗
03/03/2020140888671Open ↗
Showing 3 of 48 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION39
11/18/2021122708132Open ↗
06/02/2021122456608Open ↗
05/26/2021102225058Open ↗
Showing 3 of 39 on file for this type
▸Seals & Professional Certifications149
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION48
04/06/2020140835540Open ↗
04/06/2020140835540Open ↗
02/19/2020123791165Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
10/14/2026M01384477-P1Open ↗
09/23/2026M00725030-I1Open ↗
09/23/2026M00725030-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
10/14/2026M01384477-P1Open ↗
09/05/2026M00306449-I1Open ↗
09/05/2026M00323344-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026M00725030-I1Open ↗
09/02/2026M00339802-I1Open ↗
09/02/2026M00339802-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
02/24/2020140888671Open ↗
05/23/2019140850372Open ↗
Showing 2 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
02/28/2020140888797Open ↗
06/28/2019140857428Open ↗
04/15/2019140835540Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
02/24/2020140888671Open ↗
05/23/2019140850372Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
02/24/2020140888671Open ↗
05/23/2019140850372Open ↗
Showing 2 of 3 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment39
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING9
05/26/2021102225058Open ↗
06/28/2019140857428Open ↗
04/15/2019140835540Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
05/21/2018122846894Open ↗
12/28/2017122846894Open ↗
Showing 2 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT4
12/05/2018140706868Open ↗
06/08/2018122846894Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
12/05/2018140706868Open ↗
06/08/2018122846894Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/02/2021123791165Open ↗
▸Safety & Tenant Protection15
▸BISTenant Protection Plan and Notes12
02/19/2020123791165Open ↗
02/05/2020123791165Open ↗
01/30/2020123791165Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTenant Protection Plan3
09/05/2026M00323344-P1Open ↗
09/05/2026M00339802-I1Open ↗
08/15/2026M00323344-I1Open ↗
▸Environmental & Asbestos50
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
10/14/2026M01384477-P1Open ↗
09/05/2026M00306449-I1Open ↗
09/05/2026M00323344-P1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
02/28/2020140888797Open ↗
02/24/2020140888671Open ↗
02/05/2020123791165Open ↗
Showing 3 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/09/2019140857428Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/28/2026M00961347-I1Open ↗
▸Energy Compliance60
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
04/06/2020140835540Open ↗
04/06/2020140835540Open ↗
02/19/2020123791165Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
11/18/2021122708132Open ↗
10/22/2021140888797Open ↗
04/02/2021123791165Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
11/18/2021122708132Open ↗
10/22/2021140888797Open ↗
04/02/2021123791165Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWEN2: As Built Energy Analysis5
09/02/2026M00725030-I1Open ↗
08/15/2026M00685781-I1Open ↗
08/13/2026M00705577-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/14/2020140857428Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/24/2020140888671Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY17
11/18/2021122708132Open ↗
10/22/2021140888797Open ↗
10/22/2021140888797Open ↗
Showing 3 of 17 on file for this type
▸Approvals, Objections & Sign-offs42
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
11/18/2021122708132Open ↗
10/22/2021140888797Open ↗
06/16/2021102225058Open ↗
Showing 3 of 24 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/06/2020140835540Open ↗
Showing 1 of 4 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS APPROVAL1
04/06/2020140835540Open ↗
▸BISSUPERSEDING LETTER1
06/02/2021102225058Open ↗
▸Cost, Insurance & Ownership44
▸BISCOST AFFIDAVIT42
11/18/2021122708132Open ↗
10/22/2021140888797Open ↗
04/02/2021123791165Open ↗
Showing 3 of 42 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/14/2020140857428Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms48
▸BISEFILING COVER SHEET17
02/05/2020123791165Open ↗
01/30/2020123791165Open ↗
04/12/2019123734370Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION13
04/09/2020140888797Open ↗
03/13/2020140888797Open ↗
09/03/2019140857428Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM10
06/02/2021102225058Open ↗
04/06/2020140835540Open ↗
12/12/2019123734370Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
02/28/2020140888797Open ↗
02/24/2020140888671Open ↗
06/28/2019140857428Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00323344-I1Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/14/2019123734370Open ↗