← Back
Elevator apt, semi-fireproof with stores
Estela
445 GERARD AVENUE · BIN 2001095
💬 Discuss this project
2021Year Built
12Stories
D7Building Class
M1-4/R8AZoning
330,933 sfGross Floor Area
85Units
LL97 CoveredRent Stabilized11 Open Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: 445 GERARD OWNER LLC · 38,024 sf lot · 8.7 FAR built · Flood zone X
Locations of Work
Electrical
Cellar1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CELTIC SERVICES NYC807/08/2026
VOREA2007/08/2026
COSAN CONSTRUCTION907/08/2026
445 GERARD OWNER LLC103/22/2026
MONADNOCK CONSTRUCTION IN103/22/2026
THE VOREA GROUP LLC203/21/2026
445 GERARD AVE HOLDINGS203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/16/2016$5.6M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASSOCIATES803/21/2026
EUROCELT EXPEDITING, INC603/21/2026
A1 EXPEDITING SERVICE803/21/2026
PATUXENT ENGINEERING203/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
ARCHI PRO GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCKLEDGE SCAFFOLD CORPGeneral Contractor1007/08/2026
COSAN CONSTRUCTION CORPGeneral Contractor907/08/2026
CELTIC SERVICES NYC INCGeneral Contractor707/08/2026
MONADNOCK CONSTRUCTION INGeneral Contractor407/08/2026
MONADNOCK GEN'L CONT INCGeneral Contractor404/09/2026
RAEL AUTOMATIC SPR. CO.INFire Protection307/08/2026
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor107/08/2026
BARONE STEEL INCGeneral Contractor107/08/2026
ANTHONY G FERRY INCElectrical103/22/2026
ECNY ELEC'L CONTR'S, INCElectrical103/22/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor107/08/2026
AMBER LITE ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUNICIPAL TESTING LABORAT230209/23/2021
Building Lifecycle
All (71)Filed (18)Permit Issued (25)Signed Off (12)Violation (3)Inspection (4)Objection (6)Special Inspection (3)
03/31/2026
Signed off — Alteration
IT IS PROPOSED TO FILE FOR A CURB CUT APPLICATION IN CONJUNCTION WITH NB APPLICATION 220630137
X00224495-I1
10/23/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/06/2025
Signed off — Alteration
IT IS PROPOSED TO FILE CURB BUT APPLICATION IN CONJUNCTION WITH NB APPLICATION 220630137
X00224478-I1
08/01/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/01/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/03/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
06/17/2025
Permit issued — Curb Cut
X00224478-I1-CC
06/17/2025
Permit issued — Curb Cut
X00224495-I1-CC
03/24/2025
Signed off — Alteration
IT IS PROPOSED TO FILE FOR TEMP STANDPIPE WORK AS SHOWN ON PLANS. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB APPLICATION 220630137.
X00357096-I1
02/25/2025
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
X00340425-I1
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2024
Signed off — Alteration
X00791144-I1
02/29/2024
Signed off — Alteration
INSTALL CONSTRUCTION FENCE AS PER PLANS FILED. FILED IN CONJUNCTION WITH NEW BUILDING #220630137.
X00450852-I1
09/28/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
X00535951-I1
09/26/2023
Permit issued — Supported Scaffold
X00535951-I1-SF
01/09/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00529480-I1
12/01/2022
Permit issued — Supported Scaffold
X00535951-I1-SF
10/24/2022
Signed off — Alteration
NORTH HOIST: INSTALLATION OF DUAL 6000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPL SUBMITTED SEP
X00529536-I1
10/19/2022
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00621393-I1
09/29/2022
Permit issued — Construction Fence
X00450852-I1-FN
08/18/2022
Signed off — Alteration
SOUTH HOIST: INSTALLATION OF DUAL 6000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
X00529517-I1
08/11/2022
Permit issued — Protection and Mechanical Methods
X00791144-I1-PM
08/10/2022
Filed — Alteration
X00791144-I1
08/03/2022
Permit issued — Protection and Mechanical Methods
X00529517-I1-PM
08/02/2022
Permit issued — Protection and Mechanical Methods
X00529536-I1-PM
07/12/2022
Violation issued (ECB, closed)
Construction
06/23/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00621393-P2
06/23/2022
Special inspection requirement — Final
Sunil Saigal
06/10/2022
Permit issued — Standpipe
X00357096-I1-EW-SD
06/02/2022
Permit issued — Sidewalk Shed
X00529480-I1-SH
02/28/2022
Permit issued — Supported Scaffold
X00535951-I1-SF
02/03/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00621393-P1
01/04/2022
Permit issued — Standpipe
X00357096-I1-EW-SD
11/24/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
X00535951-P2
11/23/2021
Permit issued — Supported Scaffold
X00535951-I1-SF
11/15/2021
Permit issued — Supported Scaffold
X00621393-I1-SF
11/13/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00621393-I1
10/25/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
X00535951-P1
10/14/2021
Violation issued (ECB, closed)
Unknown
10/04/2021
Permit issued — Construction Fence
X00450852-I1-FN
09/24/2021
Special inspection requirement — Standpipe Systems
STEPHEN LATUS
09/23/2021
Filed — Alteration
IT IS PROPOSED TO FILE FOR TEMP STANDPIPE WORK AS SHOWN ON PLANS. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB APPLICATION 220630137.
X00357096-P1
08/04/2021
Permit issued — Protection and Mechanical Methods
X00529536-I1-PM
08/04/2021
Permit issued — Protection and Mechanical Methods
X00529517-I1-PM
08/02/2021
Filed — Alteration
NORTH HOIST: INSTALLATION OF DUAL 6000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPL SUBMITTED SEP
X00529536-I1
08/02/2021
Filed — Alteration
SOUTH HOIST: INSTALLATION OF DUAL 6000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
X00529517-I1
07/30/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00529480-P1
06/10/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
X00535951-I1
06/10/2021
Permit issued — Supported Scaffold
X00535951-I1-SF
06/04/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00529480-I1
06/04/2021
Permit issued — Sidewalk Shed
X00529480-I1-SH
05/26/2021
Special inspection requirement — Final
MD TOHFAZ UDDIN
03/29/2021
Signed off — Alteration
X00283615-I1
01/19/2021
Permit issued — Construction Fence
X00450852-I1-FN
01/19/2021
Objection resolved — Addressed
01/09/2021
Filed — Alteration
INSTALL CONSTRUCTION FENCE AS PER PLANS FILED. FILED IN CONJUNCTION WITH NEW BUILDING #220630137.
X00450852-I1
01/07/2021
Permit issued — Standpipe
X00357096-I1-EW-SD
07/01/2020
Permit issued — Construction Fence
X00283615-I1-FN
06/25/2020
Objection raised — Structural
06/25/2020
Objection resolved — Addressed
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMONADNOCK GEN'L CONT INC06/17/2025
DOB NOWCurb CutSigned-offMONADNOCK GEN'L CONT INC06/17/2025
DOB NOWSupported ScaffoldSigned-offCOSAN CONSTRUCTION09/26/2023
DOB NOWSupported ScaffoldSigned-offCOSAN CONSTRUCTION12/01/2022
DOB NOWConstruction FenceSigned-offMONADNOCK CONSTRUCTION IN09/29/2022
DOB NOWProtection and Mechanical MethodsSigned-offBARONE STEEL08/11/2022
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP08/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP08/02/2022
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR. CO.IN06/10/2022
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP06/02/2022
DOB NOWSupported ScaffoldSigned-offCOSAN CONSTRUCTION02/28/2022
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR. CO.IN01/04/2022
DOB NOWSupported ScaffoldSigned-offCOSAN CONSTRUCTION11/23/2021
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC11/15/2021
DOB NOWConstruction FenceSigned-offMONADNOCK CONSTRUCTION IN10/04/2021
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP08/04/2021
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP08/04/2021
DOB NOWSupported ScaffoldSigned-offCOSAN CONSTRUCTION06/10/2021
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP06/04/2021
DOB NOWConstruction FenceSigned-offMONADNOCK CONSTRUCTION IN01/19/2021
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR. CO.IN01/07/2021
DOB NOWConstruction FenceSigned-offCELTIC SERVICES NYC INC07/01/2020
DOB NOWConstruction FenceSigned-offCELTIC SERVICES NYC INC05/04/2020
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C04/07/2020
DOB NOWConstruction FenceSigned-offCELTIC SERVICES NYC INC01/24/2020
BISOTISSUED770 ELECTRIC CORP11/07/2022
BIS—ISSUEDCELTIC SERVICES NYC INC03/02/2020
9 projects · most recent 03/15/2023
General Wiring Lighting HVAC Wiring
FiledStatusContractorScope
03/15/2023CompleteECNY ELEC'L CONTR'S, INC—
03/15/2023CompleteECNY ELEC'L CONTR'S, INC—
07/07/2022CompleteAMBER LITE ELECTRIC CORP.1 meters, 1 new_meters
04/11/2022Permit IssuedCORPORATE ELEC. GROUP INC—
04/11/2022CompleteGRID CITY ELECTRIC, CORP339 meters, 1 new_meters
08/06/2021CompleteGLO ELECTRIC LLCGeneral Wiring, Lighting, HVAC Wiring
07/28/2021CompleteANTHONY G FERRY INCGeneral Wiring
06/04/2021CompleteANTHONY G FERRY INC—
04/06/2020CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/23/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/01/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
08/01/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/03/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/23/2022FinalSunil Saigalprogress
09/24/2021Standpipe SystemsSTEPHEN LATUSspecial
05/26/2021FinalMD TOHFAZ UDDINprogress
▾Documents — 128 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch11
08/25/2026X00529480-P1Request digital key ↗
08/25/2026X00529480-I1Request digital key ↗
08/25/2026X00529517-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut3
08/15/2026X00224495-I1Request digital key ↗
08/14/2026X00224478-I1Request digital key ↗
08/14/2026X00224495-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
08/25/2026X00357096-P1Request digital key ↗
08/15/2026X00357096-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/26/2026X00283615-I1Request digital key ↗
08/25/2026X00450852-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00340425-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION10
09/30/2025240262078Open ↗
07/29/2024240262078Open ↗
04/12/2023240262078Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION2
11/07/2022240316662Open ↗
03/03/2020220635098Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/02/2019240262078Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/21/2021240262078Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/26/2026X00283615-I1Open ↗
08/26/2026X00340425-I1Open ↗
08/25/2026X00529480-I1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/03/2020220635098Open ↗
03/03/2020220635098Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
03/28/2022240316662Open ↗
10/02/2019240262078Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X00621393-I1Open ↗
08/23/2026X00529536-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/28/2022240316662Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026X00357096-I1Open ↗
▸Safety & Tenant Protection9
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM4
03/03/2020220635098Open ↗
03/03/2020220635098Open ↗
03/03/2020220635098Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
04/21/2021240262078Open ↗
▸BISSTREET TREE CHECKLIST1
04/21/2021240262078Open ↗
▸BISSTREET TREE SIGNOFF1
10/20/2025240262078Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
03/03/2020220635098Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
11/04/2022240316662Open ↗
▸Environmental & Asbestos13
▸DOB NOWOER: Notice to Proceed8
08/15/2026X00357096-I1Open ↗
08/13/2026X00283615-I1Open ↗
08/13/2026X00450852-I1Open ↗
Showing 3 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
03/28/2022240316662Open ↗
05/17/2021240262078Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
10/20/2025240262078Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/03/2020220635098Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026X00283615-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/02/2024240316662Open ↗
11/04/2022240316662Open ↗
03/28/2022240316662Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/28/2022240316662Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/02/2024240316662Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/02/2024240316662Open ↗
11/04/2022240316662Open ↗
03/28/2022240316662Open ↗
▸BISCertificate of Inspection Construct Manhole or Catch Basin and Basin Connection1
03/03/2020220635098Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION10
04/21/2021240262078Open ↗
04/21/2021240262078Open ↗
03/03/2020220635098Open ↗
Showing 3 of 10 on file for this type
▸BISLANDMARKS APPROVAL1
03/03/2020220635098Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/03/2024240316662Open ↗
▸BISBPP-UTILITY APPROVAL TO RELOCATE POLE1
05/17/2021240262078Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT (FINAL): PW31
05/02/2024240316662Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
10/23/2025240262078Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
03/03/2020220635098Open ↗
▸BISCOST AFFIDAVIT1
03/28/2022240316662Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION12
10/23/2025240262078Open ↗
07/31/2024240262078Open ↗
05/04/2023240262078Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM2
03/19/2020220635098Open ↗
01/08/2020220635098Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
03/28/2022240316662Open ↗
10/02/2019240262078Open ↗
▸BISEFILING COVER SHEET1
03/03/2020220635098Open ↗
▸Other Documents3
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/21/2021240262078Open ↗
▸BISTax Abatement Miscellaneous1
05/03/2024240316662Open ↗
▸BISBPP-PARKS: REMOVE MATURE TREE1
04/21/2021240262078Open ↗