← Back
Primarily 5-6 family with 1 store or office
445 NEW LOTS AVENUE
BROOKLYN · BIN 3085633
💬 Discuss this project
1930Year Built
3Stories
S5Building Class
R6Zoning
3,960 sfGross Floor Area
7Units
Rent Stabilized62 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: PANIM EL PANIM LLC · 1,835 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
Architecture
Floor 33p · 1 filing · 10 docs
Floor 24p · 1 filing · 10 docs
Floor 11p · 1 filing · 7 docs
Cellar3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PANIM EL PANIM LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/18/2022$1.1M—Private party → PANIM EL PANIM LLC$265/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC408/20/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108208/18/2025
Building Lifecycle
All (140)Filed (4)Permit Issued (1)Violation (60)Objection (54)Special Inspection (21)
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
C
09/07/2026
Violation issued (HPD, open)
A
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
C
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
C
09/07/2026
Violation issued (HPD, open)
A
09/07/2026
Violation issued (HPD, open)
B
05/30/2026
Violation issued (HPD, open)
C
05/30/2026
Violation issued (HPD, closed)
B
05/30/2026
Violation issued (HPD, closed)
B
05/30/2026
Violation issued (HPD, closed)
B
05/30/2026
Violation issued (HPD, closed)
B
05/30/2026
Violation issued (HPD, closed)
A
05/30/2026
Violation issued (HPD, open)
C
05/30/2026
Violation issued (HPD, open)
C
05/30/2026
Violation issued (HPD, closed)
B
05/24/2026
Violation issued (HPD, open)
C
05/24/2026
Violation issued (HPD, open)
C
05/24/2026
Violation issued (HPD, closed)
B
05/05/2026
Violation issued (HPD, open)
A
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection resolved — Open
04/27/2026
Objection resolved — Addressed
04/27/2026
Objection resolved — Open
04/27/2026
Objection resolved — Open
04/22/2026
Objection resolved — Addressed
04/21/2026
Objection resolved — Resolved
04/21/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Open
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection resolved — Open
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection resolved — Open
04/20/2026
Objection resolved — Open
04/16/2026
Special inspection requirement — Air barrier - visual inspection
04/16/2026
Special inspection requirement — Permanent certificate
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/16/2026
Special inspection requirement — Maintenance information
04/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/16/2026
Special inspection requirement — Fenestration air leakage
04/16/2026
Special inspection requirement — Interior lighting power
04/16/2026
Special inspection requirement — Protection of exposed foundation insulation
04/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/28/2025
Objection resolved — Addressed
08/27/2025
Objection raised — Scope
08/20/2025
Filed — Alteration
ADDING A 2-PIECE BATHROOM IN THE CELLAR AND INTERIOR RENOVATION ON 2ND &3RD FLOOR. NO CHANGE IN USE, OCCUPANCY, BULK, OR EGRESS
B01158635-S4
08/18/2025
Filed — Alteration
ADDING A 2-PIECE BATHROOM IN THE CELLAR AND INTERIOR RENOVATION ON 2ND &3RD FLOOR. NO CHANGE IN USE, OCCUPANCY, BULK, OR EGRESS
B01158635-P1
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC06/09/2025
1 project · most recent 05/17/2022
FiledStatusContractorScope
05/17/2022Permit IssuedOGC ELECTRICAL CONTRACTOR6 meters
1 project · most recent 04/25/2025
Masonry
FiledStatusContractorScope
04/25/2025——Masonry
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/16/2026Air barrier - visual inspection—energy_progress
04/16/2026Permanent certificate—energy_progress
04/16/2026HVAC-R and service water piping design and insulation—energy_progress
04/16/2026Maintenance information—energy_progress
04/16/2026Fenestration and door U-factor and product ratings—energy_progress
04/16/2026HVAC-R and service water heating system controls—energy_progress
04/16/2026Fenestration air leakage—energy_progress
04/16/2026Interior lighting power—energy_progress
04/16/2026Protection of exposed foundation insulation—energy_progress
04/16/2026HVAC-R and service water heating equipment—energy_progress
08/11/2025Fire-Resistant Penetrations and Jointssion hourizadehspecial
04/24/2025Structural Stability – Alterations of existing buildings—special
04/24/2025Concrete - Cast-In-Place—special
04/24/2025Fire-Resistant Penetrations and Joints—special
04/24/2025Fenestration areas—energy_progress
04/24/2025Insulation placement and R values—energy_progress
04/23/2025Tenant Protection Plan Compliance—special
02/28/2025Wood – Prefabricated I-Joists—special
02/27/2025Masonry—special
02/24/2025Footing and Foundation—progress
02/24/2025Final—progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01158635-I1Request digital key ↗
08/20/2026B01158635-P1Request digital key ↗
08/20/2026B01158635-S4Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026B01185427-I1Open ↗
08/13/2026B01185427-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026B01158635-I1Open ↗
08/13/2026B01158635-P1Open ↗
08/13/2026B01158635-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/30/2026B01158635-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026B01158635-I1Open ↗
08/13/2026B01185427-I1Open ↗
08/13/2026B01158635-P1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWSite Survey: Initial2
08/15/2026B01185427-I1Open ↗
08/13/2026B01185427-I1Open ↗