1969Year Built
15Stories
R4Building Class
R4Zoning
275,568 sfGross Floor Area
177Units
LL97 CoveredRent Stabilized11 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Condo, residential unit in elevator building · 385,500 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 15Unit 15L1 filing · 6 docs
Floor 14Unit 14G1 filing · 9 docs
Floor 13
Floor 12Unit 12G2 filings · 10 docs
Floor 11
Floor 10Unit 10C3 filings · 15 docs
Floor 9
Floor 8Unit 8K1 filing · 3 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Unit 3E, Unit 3F1 filing · 9 docs
Floor 2Renovation at Haydenon - Nova Ton Hudson Condominium2 filings · 12 docs
Floor 1Hayden On The Hudson Condominium3 filings · 13 docs
CellarRenovation at Hayden on Hudson Condominium1 filing · 6 docs
Sub-BasementRenovation at Haydenon - Nova Ton Hudson Condominium1 filing · 6 docs
Site & exteriorEbmg LLC5 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hayden-On Hudson-Condominium4110/13/2026
Ebmg1207/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M Expediting603/21/2026
Cdem603/21/2026
A1 Expediting Service603/21/2026
American Gotham Consultants403/21/2026
Leder-Luis Architectural Design603/21/2026
Lombardo Building Consultants403/21/2026
Nagan EX Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
York RestorationScaffold1207/08/2026
High End ConstructionGeneral Contractor907/08/2026
Hudson Plumbing and HeatingPlumbing807/08/2026
Phoenix Sutton STRScaffold507/08/2026
Ket ElectricElectrical403/22/2026
Astro Electrical ContngElectrical303/22/2026
National Restoration Groupspecialty_contractor207/08/2026
Robin ElectricalElectrical203/22/2026
York RestorationGeneral Contractor203/21/2026
George Bassolino PlumbingPlumbing203/21/2026
Henry Myers P & HPlumbing207/08/2026
Cedar EnterprisesGeneral Contractor103/21/2026
Plaza Building ServicesGeneral Contractor103/21/2026
Spring ScaffoldingGeneral Contractor103/21/2026
Tri City Mechanical GroupPlumbing107/08/2026
Haugland Energy GroupElectrical103/22/2026
National Restoration GroupScaffold104/08/2026
ABC Madison BuildersGeneral Contractor107/08/2026
Mase ElectricElectrical103/22/2026
Guinada DesignGeneral Contractor107/08/2026
Evista GroupGeneral Contractor103/21/2026
Industrial Cooling TCHGeneral Contractor103/21/2026
Aegis Energy ServicesGeneral Contractor107/13/2015
C.C.C. RenovationGeneral Contractor109/17/2013
Crystal ComfortGeneral Contractor105/16/2007
Orbit Plumbing & HeatingPlumbing207/09/2012
Reilly Plumbing & HeatingPlumbing109/22/2015
TCS Home ImprovementsGeneral Contractor202/23/2021
Tribute RestorationGeneral Contractor208/03/2017
Xinos ConstructionGeneral Contractor104/29/2013
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hal Dorfman Architect474201/29/2026
Mohammad Ahead - Professi9286211/14/2025
Leo Y Lee Associates2481103/11/2025
Structural Engineering BU5883103/11/2025
Jim Kusi, PE3757210/14/2024
HRF Services5616101/26/2022
Building Lifecycle
10/31/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X01327911-I1-GC
10/27/2026
Elevator Category 1 inspection report filed
09/18/2026
Signed off — Alteration
REPLACE EXISTING BATHROOM FIXTURES ON SAME LOCATION, RELOCATE KITCHEN FIXTURES, INSTALL NEW CLOTHES WASHING MACHINE _ electric model.
X08000853-I1
09/18/2026
Signed off — Alteration
Plumbing Work in conjunction with Alteration 2 application #X00982633
X00982661-I1
09/18/2026
Signed off — Alteration
Interior renovation of Unit 10C. No change in Egress, Use or Occupancy.
X00982633-I1
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHudson Plumbing and Heating02/20/2026
DOB NOWGeneral ConstructionPermit IssuedRandy Rose02/19/2026
DOB NOWStructuralSigned-offNational Restoration Group11/24/2025
DOB NOWPlumbingSigned-offHudson Plumbing and Heating11/18/2025
DOB NOWPlumbingSigned-offHudson Plumbing and Heating10/30/2025
DOB NOWGeneral ConstructionSigned-offNational Restoration Group10/10/2025
DOB NOWSuspended ScaffoldPermit IssuedKMM Construction of NY10/10/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedNational Restoration Group08/27/2025
DOB NOWPlumbingSigned-offHudson Plumbing and Heating03/13/2025
DOB NOWGeneral ConstructionSigned-offJMKCS11/14/2024
DOB NOWPlumbingSigned-offHudson Plumbing and Heating05/31/2024
DOB NOWGeneral ConstructionPermit IssuedRandy Rose05/30/2024
DOB NOWPlumbingSigned-offHudson Plumbing and Heating12/18/2023
DOB NOWGeneral ConstructionSigned-offRandy Rose12/13/2023
DOB NOWGeneral ConstructionSigned-offRandy Rose12/04/2023
DOB NOWPlumbingSigned-offFlavio Mechanical09/19/2023
DOB NOWGeneral ConstructionSigned-offGuinada Design09/15/2023
DOB NOWGeneral ConstructionSigned-offABC Madison Builders09/11/2023
DOB NOWGeneral ConstructionPermit IssuedRandy Rose06/06/2022
DOB NOWGeneral ConstructionPermit IssuedRandy Rose02/22/2022
DOB NOWPlumbingSigned-offHudson Plumbing and Heating02/15/2022
DOB NOWGeneral ConstructionPermit IssuedRandy Rose01/28/2022
DOB NOWPlumbingSigned-offHenry Myers P & H07/15/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR01/28/2021
DOB NOWPlumbingSigned-offHenry Myers P & H09/23/2020
DOB NOWPlumbingSigned-offHudson Plumbing and Heating09/21/2020
DOB NOWSidewalk ShedSigned-offYork Restoration03/20/2020
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR11/06/2019
DOB NOWSidewalk ShedSigned-offYork Restoration10/15/2019
DOB NOWSupported ScaffoldSigned-offYork Restoration09/30/2019
DOB NOWSupported ScaffoldSigned-offYork Restoration09/04/2019
DOB NOWSidewalk ShedSigned-offYork Restoration08/05/2019
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR10/29/2018
DOB NOWSupported ScaffoldSigned-offYork Restoration09/10/2018
DOB NOWSidewalk ShedSigned-offYork Restoration08/01/2018
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR03/08/2018
BIS—ISSUEDAshley Duignan, RA06/13/2024
BISOTISSUEDTCS Home Improvements02/23/2021
BISOTISSUEDTCS Home Improvements09/11/2020
BISOTISSUEDHigh End Construction08/18/2020
+ 27 more permits on file
6 projects · most recent 09/11/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/11/2026Permit IssuedHudson Plumbing and HeatingGas, Water/Sanitary
07/14/2026Signed-offHudson Plumbing and HeatingWater/Sanitary
03/18/2026Signed-offHudson Plumbing and HeatingGas, Water/Sanitary
01/03/2024Signed-offHudson Plumbing and HeatingWater/Sanitary
01/27/2022Signed-offHudson Plumbing and HeatingWater/Sanitary
01/03/2022——Water/Sanitary
25 projects · most recent 01/21/2026
General Wiring
FiledStatusContractorScope
01/21/2026CancelledRobin ElectricalGeneral Wiring
01/21/2026CompleteRobin ElectricalGeneral Wiring
12/31/2025CompleteRobin ElectricalGeneral Wiring
03/11/2025CancelledRobin ElectricalGeneral Wiring
08/19/2024CompleteKet ElectricGeneral Wiring
05/29/2024CompleteKet ElectricGeneral Wiring
05/22/2024CompleteKet ElectricGeneral Wiring
04/12/2024CompleteKet ElectricGeneral Wiring
04/10/2024CompleteHaugland Energy GroupGeneral Wiring
04/09/2024CompleteKet ElectricGeneral Wiring
02/12/2024CompleteLerco ElectricGeneral Wiring
02/02/2024Permit IssuedFraccavento ElectricGeneral Wiring
01/30/2024CompleteKet ElectricGeneral Wiring
01/23/2024CancelledAllstate ElectricalGeneral Wiring
01/17/2024CompleteKet ElectricGeneral Wiring
2 projects · most recent 03/18/2026
FiledStatusContractorScope
03/18/2026Signed-offHudson Plumbing and Heating—
03/11/2025Signed-offNational Restoration Group—
1 project · most recent 11/14/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/14/2025Permit IssuedKMM Construction of NYSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
09/02/2026Pass-Final General Construction Non-Directive 14PassView ↗
08/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/06/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
12/03/2025Lighting in dwelling unitsHal Dorfmanenergy_progress
12/03/2025Lighting controlsHal Dorfmanenergy_progress
12/03/2025FinalHal Dorfmanprogress
12/03/2025Fire-Resistant Penetrations and JointsHal Dorfmanspecial
11/20/2025Post-installed AnchorsMOHAMMAD AHEADspecial
11/11/2025Post-installed AnchorsMOHAMMAD AHEADspecial
09/25/2024Tenant Protection Plan ComplianceJim Kusispecial
09/25/2024FinalJim Kusiprogress
09/25/2024MasonryJim Kusispecial
09/25/2024Structural Stability – Alterations of existing buildingsJim Kusispecial
12/27/2023Fire-Resistant Penetrations and JointsHal Dorfmanspecial
12/27/2023Energy Code Compliance InspectionsHal Dorfmanprogress
12/04/2023Lighting in dwelling unitsClaude Hurtenergy_progress
12/04/2023Energy Code Compliance InspectionsClaude Hurtprogress
12/04/2023Fire-Resistance Rated ConstructionClaude Hurtprogress
03/23/2023MasonryJim Kusispecial
03/23/2023Tenant Protection Plan ComplianceJim Kusispecial
03/23/2023FinalJim Kusiprogress
03/23/2023Structural Stability – Alterations of existing buildingsJim Kusispecial
03/13/2023FinalJudith Kunoffprogress
11/22/2022Lighting in dwelling unitsQIUFAN JIANGenergy_progress
11/22/2022FinalQIUFAN JIANGprogress
01/26/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
01/26/2022FinalFAHAD FATEHprogress
01/26/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 30.
343 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account