← Back
One family attached or semi-detached
446 ROBINSON AVENUE
STATEN ISLAND · Great Kills-Eltingville · BIN 5175138
💬 Discuss this project
2022Year Built
2Stories
A5Building Class
R3-2Zoning
1,442 sfGross Floor Area
1Units
One family attached or semi-detached · 2,375 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JVM ARCHITECT1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES V MORRI511/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAMES V MORRI, RA503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAVAGNARO CONTRACTING LLCGeneral Contractor403/21/2026
ALISON PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738211/04/2022
JAMES V MORRI, RA1042211/04/2022
Building Lifecycle
All (39)Filed (5)Permit Issued (3)Signed Off (2)Inspection (6)Special Inspection (23)
11/09/2022
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00605429-S1
11/09/2022
Special inspection requirement — Concrete - Cast-In-Place
James Morri
11/09/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
11/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Morri
11/09/2022
Special inspection requirement — Subgrade Inspections
James Morri
11/09/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
11/09/2022
Special inspection requirement — Final
James Morri
11/09/2022
Special inspection requirement — Fire-Resistance Rated Construction
James Morri
11/09/2022
Special inspection requirement — Structural Wood Frame
James Morri
11/09/2022
Special inspection requirement — Energy Code Compliance Inspections
James Morri
11/09/2022
Special inspection requirement — Footing and Foundation
James Morri
11/09/2022
Special inspection requirement — Air barrier — testing
anthony santoro
11/09/2022
Special inspection requirement — Electric vehicle service equipment requirements
James Morri
11/09/2022
Special inspection requirement — Fenestration areas
James Morri
11/09/2022
Special inspection requirement — Permanent certificate
James Morri
11/09/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
James Morri
11/09/2022
Special inspection requirement — Air barrier - visual inspection
James Morri
11/09/2022
Special inspection requirement — Lighting in dwelling units
James Morri
11/09/2022
Special inspection requirement — Fenestration air leakage
James Morri
11/09/2022
Special inspection requirement — Lighting controls
James Morri
11/09/2022
Special inspection requirement — Insulation placement and R values
James Morri
11/09/2022
Special inspection requirement — Metering
James Morri
11/09/2022
Special inspection requirement — Maintenance information
James Morri
11/09/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
James Morri
11/04/2022
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00605429-P2
10/11/2022
Signed off — Alteration
S00608466-I1
10/07/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/04/2022
Permit issued — Curb Cut
S00608466-I1-CC
09/30/2022
Filed — Alteration
S00608466-I1
08/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2022
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00605429-P1
05/17/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/13/2022
Permit issued — Plumbing
S00605429-S1-PL
03/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/15/2022
Permit issued — Plumbing
S00605429-S1-PL
02/22/2022
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00605429-S1
11/08/2021
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00605429-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCAVAGNARO CONTRACTING LLC10/04/2022
DOB NOWPlumbingSigned-offALISON PLBG & HTG INC05/13/2022
DOB NOWPlumbingSigned-offALISON PLBG & HTG INC03/15/2022
1 project · most recent 11/04/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/04/2022Signed-offALISON PLBG & HTG INCGas, Storm, Water/Sanitary
1 project · most recent 05/25/2022
General Wiring
FiledStatusContractorScope
05/25/2022CompleteFICHERA ELECTRIC, INCGeneral Wiring
1 project · most recent 11/04/2022
Concrete Wood
FiledStatusContractorScope
11/04/2022Signed-offALISON PLBG & HTG INCConcrete, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/07/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
08/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/17/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/24/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
11/09/2022Concrete - Cast-In-PlaceJames Morrispecial
11/09/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/09/2022Fire-Resistant Penetrations and JointsJames Morrispecial
11/09/2022Subgrade InspectionsJames Morrispecial
11/09/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
11/09/2022FinalJames Morriprogress
11/09/2022Fire-Resistance Rated ConstructionJames Morriprogress
11/09/2022Structural Wood FrameJames Morriprogress
11/09/2022Energy Code Compliance InspectionsJames Morriprogress
11/09/2022Footing and FoundationJames Morriprogress
11/09/2022Air barrier — testing anthony santoroenergy_progress
11/09/2022Electric vehicle service equipment requirementsJames Morrienergy_progress
11/09/2022Fenestration areasJames Morrienergy_progress
11/09/2022Permanent certificateJames Morrienergy_progress
11/09/2022Fenestration and door U-factor and product ratingsJames Morrienergy_progress
11/09/2022Air barrier - visual inspectionJames Morrienergy_progress
11/09/2022Lighting in dwelling unitsJames Morrienergy_progress
11/09/2022Fenestration air leakageJames Morrienergy_progress
11/09/2022Lighting controlsJames Morrienergy_progress
11/09/2022Insulation placement and R valuesJames Morrienergy_progress
11/09/2022MeteringJames Morrienergy_progress
11/09/2022Maintenance informationJames Morrienergy_progress
11/09/2022HVAC-R and service water piping design and insulationJames Morrienergy_progress
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026S00605429-P2Request digital key ↗
08/24/2026S00605429-P1Request digital key ↗
08/24/2026S00605429-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/05/2021540207792Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/05/2021540207792Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00605429-I1Open ↗
08/13/2026S00605429-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00605429-P2Open ↗
08/13/2026S00605429-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/15/2021540207792Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00605429-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026S00605429-P2Open ↗
08/24/2026S00605429-P1Open ↗
08/24/2026S00605429-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026S00605429-I1Open ↗
08/27/2026S00605429-I1Open ↗
08/27/2026S00605429-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026S00605429-I1Open ↗
08/27/2026S00605429-I1Open ↗
08/27/2026S00605429-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/05/2021540207792Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/05/2021540207792Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00605429-I1Open ↗
08/13/2026S00605429-P2Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00605429-I1—
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00605429-I1Open ↗
08/13/2026S00605429-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00605429-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00605429-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00605429-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00605429-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/13/2026S00605429-I1Open ↗
08/13/2026S00605429-P2Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
10/05/2021540207792Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/05/2021540207792Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00605429-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00605429-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
12/15/2021540207792Open ↗
10/05/2021540207792Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/05/2021540207792Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification3
08/24/2026S00605429-I1Open ↗
08/24/2026S00605429-P2Open ↗
08/24/2026S00605429-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00605429-P2Open ↗
08/13/2026S00605429-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00605429-I1Open ↗
08/13/2026S00605429-P2Open ↗
▸BISWAIVER OF THE 7 FT DISTANCE TO UTILITYPOLES OR TREES1
12/15/2021540207792Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
10/05/2021540207792Open ↗
▸BISWAIVER OF CURBE ALIGNMENT1
12/15/2021540207792Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/05/2021540207792Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00605429-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00605429-I1Open ↗