ECB01/09/2026OBSERVED ACTIVE CONSTRUCTION WORK TAKING PLACE, OVER PUBLIC SIDEWALK ON TEMPORARY JACK SCAFFOLD PUMPS. WORK FOR ROOF AND SIDING WORK ON EXPOSURE 1 AND 2 HAS NOT BEEN PERMITTED. SCOPE OF WORK IS PROPOSING A SAFE$2K due
ECB01/09/2026OBSERVED ACTIVE CONSTRUCTION TAKING PLACE OVER PUBLIC SIDEWALK. CONDITIONS ARE CAUSING A OVERHEAR FALLING HAZARD FOR PUBLIC. ECB AND FULL STOP WORK ORDER ISSUED FOR FAILURE TO MAINTAIN. FAILURE TO PROVIDE SIDEW$12K due
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
ECB10/09/2025GC/ST WW/OP. ATOI OBSERVED AT MIXED-USE BLDG, 1-STORY COMMERCIAL PROJECTION AT 1ST FLR ALONG HERKIMER STR EXPANDED APRX. 10 FT, & STAIRS LEADING TO 2ND-FLR RESIDENTIAL ENTRY REMOVED. ALSO, A 40-FT-LONG & 12-FT-Hearing held — result not yet published$2K proposed