Zoned residential, not Manhattan
449 BEACH 45TH STREET
QUEENS · BIN 4625293
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R4-1Zoning
0 sfGross Floor Area
0Units
0 Open Violations
Zoned residential, not Manhattan · Owner of record: 449 BEACH 45 ST LLC · 2,836 sf lot · 0 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 2 filings · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
19 BARBEY1704/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2025$970K—449 BEACH 45 ST LLC → Private party— not available
10/24/2018$35K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RISHON HOMES CORPGeneral Contractor404/09/2026
SUNRUN INSTALLATION SVCGeneral Contractor106/28/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272206/24/2026
D&E BUILD EVERGREEN I9342310/22/2025
TRIANGLE INSPECTION & TES7495111/19/2024
Building Lifecycle
All (78)Filed (7)Permit Issued (6)Signed Off (4)Violation (5)Inspection (10)Objection (16)Special Inspection (30)
06/24/2026
Filed — Alteration
Q01398870-P1
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/16/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
06/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/16/2026
Special inspection requirement — Final
Walid Abdulla
06/16/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/28/2026
Permit issued — Solar
Q01398870-I1-SL
05/21/2026
Filed — Alteration
Q01398870-I1
02/13/2026
Signed off — New Building
FILED HEREWITH PLUMBING WORK TYPES WITH SPRINKLER-PLUMBING (30-HEADS OR LESS) IN CONJUNCTION WITH DOB APPLICATION #Q01126046-I1. (N.B. THREE-STORY, TWO FAMILY BUILDING.)
Q01126046-I1
12/30/2025
Signed off — New Building
FILED HEREWITH PLUMBING WORK TYPES WITH SPRINKLER-PLUMBING (30-HEADS OR LESS) IN CONJUNCTION WITH DOB APPLICATION #Q01126046-I1. (N.B. THREE-STORY, TWO FAMILY BUILDING.)
Q01126046-S1
12/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
11/24/2025
Special inspection requirement — Structural Cold-Formed Steel
Danny Chen
11/24/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Danny Chen
11/24/2025
Special inspection requirement — Mechanical Systems
Danny Chen
11/24/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Danny Chen
11/24/2025
Special inspection requirement — Masonry
Danny Chen
11/24/2025
Special inspection requirement — Concrete - Cast-In-Place
Danny Chen
11/24/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Danny Chen
11/24/2025
Special inspection requirement — Final
PETER CHO
11/24/2025
Special inspection requirement — Structural Wood Frame
Danny Chen
11/24/2025
Special inspection requirement — Lowest Floor Elevation
Danny Chen
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Danny Chen
11/24/2025
Special inspection requirement — Footing and Foundation
Danny Chen
11/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Danny Chen
11/24/2025
Special inspection requirement — Maintenance information
Danny Chen
11/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Danny Chen
11/24/2025
Special inspection requirement — Air barrier - visual inspection
Danny Chen
11/24/2025
Special inspection requirement — Interior lighting power
Danny Chen
11/24/2025
Special inspection requirement — Insulation placement and R values
Danny Chen
11/24/2025
Special inspection requirement — Subgrade Inspections
Danny Chen
11/24/2025
Special inspection requirement — Fenestration areas
Danny Chen
11/24/2025
Special inspection requirement — Fenestration air leakage
Danny Chen
11/24/2025
Special inspection requirement — Metering
Danny Chen
11/24/2025
Special inspection requirement — Air barrier — testing
Danny Chen
11/10/2025
Signed off — New Building
FILED HEREWITH PLUMBING WORK TYPES WITH SPRINKLER-PLUMBING (30-HEADS OR LESS) IN CONJUNCTION WITH DOB APPLICATION #Q01126046-I1. (N.B. THREE-STORY, TWO FAMILY BUILDING.)
Q01126046-S2
10/29/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/23/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01126046-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q01126023-I1
10/22/2025
Filed — New Building
FILED HEREWITH PLUMBING WORK TYPES WITH SPRINKLER-PLUMBING (30-HEADS OR LESS) IN CONJUNCTION WITH DOB APPLICATION #Q01126046-I1. (N.B. THREE-STORY, TWO FAMILY BUILDING.)
Q01126046-P1
10/06/2025
Permit issued — Curb Cut
Q01126046-S2-CC
10/03/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/07/2025
Inspection — Fail-Final House Connection
Fail
View inspection ↗
06/02/2025
Violation issued (ECB, closed)
Construction
06/02/2025
Violation issued (ECB, closed)
Construction
06/02/2025
Violation issued (ECB, closed)
Unknown
06/02/2025
Violation issued (ECB, closed)
Unknown
05/12/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/12/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/06/2025
Permit issued — Plumbing
Q01126046-S1-PL
04/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/20/2025
Permit issued — Earth Work
Q01126046-I1-FO-EA
03/20/2025
Permit issued — Foundation
Q01126046-I1-GC-CX
03/11/2025
Permit issued — Construction Fence
Q01126023-I1-FN
02/05/2025
Objection resolved — Addressed
01/24/2025
Objection resolved — Addressed
12/18/2024
Objection raised — Structural
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC05/28/2026
DOB NOWCurb CutSigned-offRISHON HOMES CORP10/06/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR05/06/2025
DOB NOWEarth WorkSigned-offRISHON HOMES CORP03/20/2025
DOB NOWFoundationPermit IssuedRISHON HOMES CORP03/20/2025
DOB NOWConstruction FenceSigned-offRISHON HOMES CORP03/11/2025
BISOTISSUEDA.INTERNATIONAL LTD07/07/1999
1 project · most recent 10/22/2025
Sprinkler System
FiledStatusContractorScope
10/22/2025——Sprinkler System
1 project · most recent 10/22/2025
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
10/22/2025Signed-offINFINITI ESC PLUMBING CORPlumbing-Sprinkler, Storm, Water/Sanitary
2 projects · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026CompleteSUNRUN SOLAR ELECTL CORP—
05/20/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 10/22/2025
Steel Wood
FiledStatusContractorScope
10/22/2025Signed-offRISHON HOMES CORPSteel, Wood
1 project · most recent 10/22/2025
Earthwork
FiledStatusContractorScope
10/22/2025Signed-offRISHON HOMES CORPEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/29/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/03/2025Fail-Final CND-Occupancy InspectionFailView ↗
08/07/2025Fail-Final House ConnectionFailView ↗
05/12/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/12/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/16/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/16/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
06/16/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/16/2026Energy Code Compliance InspectionsWalid Abdullaprogress
06/16/2026FinalWalid Abdullaprogress
06/16/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
11/24/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
11/24/2025Structural Cold-Formed SteelDanny Chenspecial
11/24/2025Excavations - Sheeting, Shoring, and BracingDanny Chenspecial
11/24/2025Mechanical SystemsDanny Chenspecial
11/24/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Danny Chenspecial
11/24/2025MasonryDanny Chenspecial
11/24/2025Concrete - Cast-In-PlaceDanny Chenspecial
11/24/2025Structural Steel - High Strength BoltingDanny Chenspecial
11/24/2025FinalPETER CHOprogress
11/24/2025Structural Wood FrameDanny Chenprogress
11/24/2025Lowest Floor ElevationDanny Chenprogress
11/24/2025Energy Code Compliance InspectionsDanny Chenprogress
11/24/2025Footing and FoundationDanny Chenprogress
11/24/2025Fire-Resistance Rated ConstructionDanny Chenprogress
11/24/2025Maintenance informationDanny Chenenergy_progress
11/24/2025HVAC-R and service water piping design and insulationDanny Chenenergy_progress
11/24/2025Air barrier - visual inspectionDanny Chenenergy_progress
11/24/2025Interior lighting powerDanny Chenenergy_progress
11/24/2025Insulation placement and R valuesDanny Chenenergy_progress
Latest 25 of 41.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026Q01126023-I1Request digital key ↗
08/18/2026Q01126046-I1Request digital key ↗
08/18/2026Q01126046-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
11/16/2024400992011Open ↗
11/15/2024400992011Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01126046-I1Open ↗
08/13/2026Q01126046-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01126046-P1Open ↗
08/13/2026Q01126046-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01126046-P1Open ↗
08/13/2026Q01126046-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q01398870-P1Open ↗
09/02/2026Q01398870-P1Open ↗
09/02/2026Q01398870-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/18/2026Q01126046-S2Open ↗
08/18/2026Q01126046-S1Open ↗
08/18/2026Q01126046-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q01398870-P1Open ↗
09/02/2026Q01398870-P1Open ↗
09/02/2026Q01398870-P1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01126046-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01126046-I1Open ↗
08/13/2026Q01126046-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q01126046-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01126046-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q01126046-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWOER: Notice to Proceed3
08/13/2026Q01126046-I1Open ↗
08/13/2026Q01126046-P1Open ↗
08/13/2026Q01126046-S1Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026Q01126046-I1Open ↗
08/13/2026Q01126046-S1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q01126046-I1Open ↗
08/13/2026Q01126046-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01126046-I1Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
11/15/2024400992011Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/13/2026Q01126046-I1Open ↗
08/13/2026Q01126046-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01126046-I1Open ↗
08/13/2026Q01126046-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/18/2026Q01126046-I1Open ↗
08/18/2026Q01126046-P1Open ↗
▸DOB NOWTR5H Test Report1
08/13/2026Q01126046-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01126046-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01126046-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q01126046-I1Open ↗