Elevator apt, semi-fireproof with stores
45-02 QUEENS BOULEVARD
QUEENS · BIN 4624284
💬 Discuss this project
2023Year Built
8Stories
D7Building Class
C4-4AZoning
78,888 sfGross Floor Area
64Units
17 Open Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: 4502 SUNNYSIDE LLC · 13,018 sf lot · 6.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof3p · 3 filings · 7 docs
Bulkhead1p · 1 filing · 19 docs
Floor 264p · 1 filing · 20 docs
Floor 167p · 4 filings · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4502 SUNNYSIDE9809/13/2026
JLS GROUP CONSTRUCTION1807/08/2026
DORIA1007/08/2026
RASELL REALTY504/09/2026
TRI BOROUGH SCAFFOLDING404/09/2026
YOEL LANDAU-JL WORKS INC103/22/2026
OWNERS REP203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2022$11.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2203/21/2026
MY ARCHITECT1803/21/2026
Rigid Structural Design, LLC303/21/2026
A1 EXPEDITING SERVICE CORP.403/21/2026
TWP DESIGN CONSULTING603/21/2026
AE DESIGN SOLUTION403/21/2026
ACE CONSULTANTS203/21/2026
AVALON DESIGN203/21/2026
KATARIA BUILDERS203/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JLS GROUP CONSTRUCTION LLGeneral Contractor2507/08/2026
VIP FIRE SPRINKLER INCFire Protection407/08/2026
DYNAMIC HOISTING SCAFF INGeneral Contractor404/09/2026
SAFEPIPE PLUMBING INCFire Protection307/08/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
LW INTERIOR REMODELING INGeneral Contractor204/09/2026
AL-LECTRIC ELECT'L CONTRGElectrical203/22/2026
MY ARCHITECTGeneral Contractor103/22/2026
PRD GROUP INCGeneral Contractor107/08/2026
RIGHT ANGLE CONSTRUCTIONGeneral Contractor107/08/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
TOP PLUMBING AND HEATINGPlumbing107/08/2026
SIGNSTAR NYCScaffold107/08/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
ORBIT SPRINKLER CORPFire Protection106/27/2026
ACCORD POWER INCGeneral Contractor104/09/2026
JL WORKS INCGeneral Contractor104/09/2026
JSB WORKS INCGeneral Contractor104/09/2026
MC SUPERSTRUCTURE INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004405/08/2026
MEP INSPECTIONS, INC1102205/08/2026
ARK ENGINEERING PC72612304/21/2026
SPIVAK ARCHITECTS PC6957402/25/2026
SKYLINE RIGGING7880411/27/2024
SYNERGIC DESIGN LLC8561110/29/2024
Building Lifecycle
All (197)Filed (46)Permit Issued (44)Signed Off (22)Violation (4)Inspection (23)Objection (25)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
08/05/2026
Signed off — Alteration
Q01405784-I1
07/20/2026
Signed off — Alteration
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01353617-I1
07/17/2026
Special inspection requirement — Air barrier - visual inspection
George Lau
07/17/2026
Special inspection requirement — Fenestration areas
George Lau
07/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
George Lau
07/17/2026
Special inspection requirement — Protection of exposed foundation insulation
George Lau
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
George Lau
07/17/2026
Special inspection requirement — Insulation placement and R values
George Lau
07/17/2026
Special inspection requirement — Preliminary
George Lau
07/17/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
George Lau
07/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
George Lau
07/17/2026
Special inspection requirement — Air barrier continuity plan testing
George Lau
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Lau
07/17/2026
Special inspection requirement — Vestibules
George Lau
07/17/2026
Special inspection requirement — Fenestration air leakage
George Lau
06/15/2026
Signed off — Alteration
Q01353609-I1
06/02/2026
Objection resolved — Resolved
06/01/2026
Objection raised — Other
05/29/2026
Permit issued — Sign
Q01405784-I1-SG
05/22/2026
Filed — Alteration
Q01405784-I1
05/22/2026
Special inspection requirement — Final
ADITYA DESAI
05/19/2026
Signed off — Alteration
Q01353561-I1
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
05/12/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
Howard Spivak
05/12/2026
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
05/08/2026
Filed — Alteration
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01353617-P1
05/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/06/2026
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
05/06/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
04/21/2026
Filed — New Building
Subsequently Filed Plumbing Scope of Work for New 8-story Mixed-Use Building in Conjunction with NB-GC # Q00718151-I1.
Q00718151-B2
04/17/2026
Special inspection requirement — Insulation placement and R values
George Lau
04/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
George Lau
04/17/2026
Special inspection requirement — Preliminary
George Lau
04/17/2026
Special inspection requirement — Protection of exposed foundation insulation
George Lau
04/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
George Lau
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Lau
04/17/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
George Lau
04/17/2026
Special inspection requirement — Air barrier - visual inspection
George Lau
04/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/25/2026
Objection raised — Admin
03/16/2026
Permit issued — Plumbing
Q01353609-I1-PL
03/13/2026
Permit issued — Sprinklers
Q01353617-I1-EW-SP
03/09/2026
Permit issued — Mechanical Systems
Q01353586-I1-MS
03/09/2026
Permit issued — General Construction
Q01353561-I1-GC
02/25/2026
Filed — Alteration
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01353617-I1
02/25/2026
Filed — Alteration
Q01353609-I1
02/25/2026
Filed — Alteration
Mechanical modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01353586-I1
02/23/2026
Filed — Alteration
Q01353561-I1
01/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2025
Filed — New Building
Subsequently Filed Plumbing Scope of Work for New 8-story Mixed-Use Building in Conjunction with NB-GC # Q00718151-I1.
Q00718151-B1
10/30/2025
Signed off — New Building
Subsequently Filed Plumbing Scope of Work for New 8-story Mixed-Use Building in Conjunction with NB-GC # Q00718151-I1.
Q00718151-S5
10/30/2025
Signed off — New Building
Subsequently Filed Plumbing Scope of Work for New 8-story Mixed-Use Building in Conjunction with NB-GC # Q00718151-I1.
Q00718151-S6
10/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/14/2025
Signed off — New Building
Subsequently Filed Plumbing Scope of Work for New 8-story Mixed-Use Building in Conjunction with NB-GC # Q00718151-I1.
Q00718151-S4
09/19/2025
Signed off — Alteration
New 16'-3" Curb Cut. Filed in conjunction with BPP 440713701 and New Building Q00718151
Q00721247-I1
09/18/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
Latest 60 of 197 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSIGNSTAR NYC05/29/2026
DOB NOWPlumbingSigned-offTOP PLUMBING AND HEATING03/16/2026
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP03/13/2026
DOB NOWMechanical SystemsSigned-offLW INTERIOR REMODELING IN03/09/2026
DOB NOWGeneral ConstructionSigned-offLW INTERIOR REMODELING IN03/09/2026
DOB NOWCurb CutSigned-offJLS GROUP CONSTRUCTION LL07/14/2025
DOB NOWConstruction FenceSigned-offJLS GROUP CONSTRUCTION LL04/23/2025
DOB NOWStandpipeSigned-offBELLEROSE PLBG & HEATING04/03/2025
DOB NOWStandpipeSigned-offBELLEROSE PLBG & HEATING04/03/2025
DOB NOWSprinklersSigned-offBELLEROSE PLBG & HEATING04/02/2025
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG02/06/2025
DOB NOWGeneral ConstructionPermit IssuedJLS GROUP CONSTRUCTION LL01/23/2025
DOB NOWSolarSigned-offACCORD POWER INC11/06/2024
DOB NOWMechanical SystemsSigned-offJLS GROUP CONSTRUCTION LL10/21/2024
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC10/10/2024
DOB NOWProtection and Mechanical MethodsSigned-offJLS GROUP CONSTRUCTION LL09/20/2024
DOB NOWGeneral ConstructionPermit IssuedJLS GROUP CONSTRUCTION LL09/17/2024
DOB NOWSidewalk ShedSigned-offDYNAMIC HOISTING SCAFF IN08/06/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP07/30/2024
DOB NOWSuspended ScaffoldSigned-offDORIA, INC07/01/2024
DOB NOWSidewalk ShedSigned-offDYNAMIC HOISTING SCAFF IN06/03/2024
DOB NOWConstruction FenceSigned-offJLS GROUP CONSTRUCTION LL04/30/2024
DOB NOWSprinklersSigned-offVIP FIRE SPRINKLER INC12/28/2023
DOB NOWSprinklersSigned-offVIP FIRE SPRINKLER INC12/28/2023
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC11/09/2023
DOB NOWFoundationSigned-offJLS GROUP CONSTRUCTION LL10/18/2023
DOB NOWGeneral ConstructionPermit IssuedJLS GROUP CONSTRUCTION LL10/13/2023
DOB NOWSupport of ExcavationSigned-offJLS GROUP CONSTRUCTION LL10/13/2023
DOB NOWStructuralSigned-offJLS GROUP CONSTRUCTION LL10/11/2023
DOB NOWSidewalk ShedSigned-offPRD GROUP INC09/22/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC09/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offJLS GROUP CONSTRUCTION LL08/31/2023
DOB NOWStructuralSigned-offJLS GROUP CONSTRUCTION LL07/19/2023
DOB NOWFoundationSigned-offJLS GROUP CONSTRUCTION LL07/19/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP07/17/2023
DOB NOWFoundationSigned-offJLS GROUP CONSTRUCTION LL05/04/2023
DOB NOWConstruction FenceSigned-offJLS GROUP CONSTRUCTION LL05/03/2023
DOB NOWGeneral ConstructionPermit IssuedJLS GROUP CONSTRUCTION LL02/02/2023
DOB NOWSupport of ExcavationSigned-offJLS GROUP CONSTRUCTION LL12/22/2022
DOB NOWFoundationSigned-offJLS GROUP CONSTRUCTION LL05/31/2022
+ 4 more permits on file
1 project · most recent 04/21/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/21/2026Permit IssuedJLS GROUP CONSTRUCTION LLHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg LMU361HHV 45,000 BTU · Vrf Outdoor ×74
LMU300HHV 28,600 BTU · Vrf Outdoor ×54
LUU240HHV 30,120 BTU · Heat Pump Outdoor ×2
Daikin RXYQ72TATJU 81,000 BTU · Vrf Outdoor ×6
RXSQ24TAVJU 27,000 BTU · Vrf Outdoor ×2
RXYQ120TATJU 135,000 BTU · Vrf Outdoor ×2
RXYQ96TATJU 108,000 BTU · Vrf Outdoor ×2
Aaon RN-013-8-0-EB09-3GB 292,500 BTU · Rooftop Unit ×4
Ventilation
Greenheck USF-08 620 CFM · Exhaust Fan ×4
CUE-099-VG 150 CFM · Exhaust Fan ×2
USF-10 650 CFM · Exhaust Fan ×2
USF-24 7,200 CFM · Exhaust Fan ×2
2 projects · most recent 05/08/2026
Sprinkler System
FiledStatusContractorScope
05/08/2026Signed-offORBIT SPRINKLER CORP—
04/21/2026Signed-offSAFEPIPE PLUMBING INCSprinkler System
1 project · most recent 04/21/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/21/2026Signed-offBELLEROSE PLBG & HTGGas, Storm, Water/Sanitary
11 projects · most recent 03/13/2026
General Wiring
FiledStatusContractorScope
03/13/2026CompleteP & Z ELECTRIC CORPGeneral Wiring
11/04/2024CompleteACCORD POWER ELECTRIC LLC—
10/03/2024CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
03/13/2024CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
11/09/2023CompleteAL-LECTRIC ELECT'L CONTRG—
11/07/2023Complete.UXEDO ELEC'L CONTR'G INC—
09/27/2023CompleteHIGH QUALITY ELECTRIC OF—
09/12/2023CompleteNASH ELECTRIC SERVICES IN—
12/09/2022CompleteAL-LECTRIC ELECT'L CONTRG1 meters, 1 new_meters
08/22/2022CancelledAL-LECTRIC ELECT'L CONTRG1 meters, 1 new_meters
12/14/2018CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
04/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/18/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/23/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/28/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
04/28/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/25/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/23/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/10/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
11/16/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/02/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/17/2026Air barrier continuity plan testingGeorge Lauenergy_progress
07/17/2026Fire-Resistance Rated ConstructionGeorge Lauprogress
07/17/2026Wall Panels, Curtain Walls, and VeneersGeorge Lauspecial
07/17/2026PreliminaryGeorge Lauprogress
07/17/2026Energy Code Compliance InspectionsGeorge Lauprogress
07/17/2026Fire-Resistant Penetrations and JointsGeorge Lauspecial
07/17/2026Protection of exposed foundation insulationGeorge Lauenergy_progress
07/17/2026Fenestration areasGeorge Lauenergy_progress
07/17/2026Insulation placement and R valuesGeorge Lauenergy_progress
07/17/2026Air barrier - visual inspectionGeorge Lauenergy_progress
07/17/2026Fenestration air leakageGeorge Lauenergy_progress
07/17/2026VestibulesGeorge Lauenergy_progress
07/17/2026Fenestration and door U-factor and product ratingsGeorge Lauenergy_progress
05/22/2026FinalADITYA DESAIprogress
05/12/2026Tenant Protection Plan ComplianceHoward Spivakspecial
05/12/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
05/12/2026Post-installed AnchorsNicolas Crosettospecial
05/12/2026Sprinkler SystemsNicolas Crosettospecial
05/06/2026Sprinkler SystemsNicolas Crosettospecial
05/06/2026Tenant Protection Plan Compliance—special
05/06/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
05/06/2026Post-installed AnchorsNicolas Crosettospecial
04/17/2026Air barrier continuity plan testingGeorge Lauenergy_progress
04/17/2026VestibulesGeorge Lauenergy_progress
04/17/2026Air barrier - visual inspectionGeorge Lauenergy_progress
Latest 25 of 150.
▾Documents — 218 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch40
08/26/2026Q00721247-I1Request digital key ↗
08/26/2026Q00711022-I1Request digital key ↗
08/25/2026Q00718151-A6Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/28/2026Q00110567-I1Request digital key ↗
08/28/2026Q00217841-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00110558-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION1
04/21/2022440713701Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
10/15/2025440713701Open ↗
▸BISDOT-410 PERMITS FOR ADA RAMPS1
01/15/2026440713701Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/21/2022440713701Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00718151-I1Open ↗
08/13/2026Q00718151-B2Open ↗
08/13/2026Q00718151-B1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00718151-B2Open ↗
08/13/2026Q00718151-B1Open ↗
08/13/2026Q00718151-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00718151-I1Open ↗
▸Seals & Professional Certifications102
▸DOB NOWDPL-1: Design Professional Seal & Signature45
08/28/2026Q00110567-I1Open ↗
08/26/2026Q00711022-I1Open ↗
08/25/2026Q00718151-P1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026Q00718151-A2Open ↗
09/02/2026Q01073896-P1Open ↗
09/01/2026Q00718151-A4Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/29/2026Q01405784-I1Open ↗
09/23/2026Q00718151-A2Open ↗
09/01/2026Q00718151-A4Open ↗
Showing 3 of 23 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/21/2022440713701Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/21/2022440713701Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00718151-B1Open ↗
08/13/2026Q00718151-P1Open ↗
08/13/2026Q00718151-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026Q00718151-I1—
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00718151-B2Open ↗
08/13/2026Q00718151-I1Open ↗
08/13/2026Q00718151-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
12/24/2024440713701Open ↗
04/21/2022440713701Open ↗
▸BISSTREET TREES SITE PLAN1
10/15/2025440713701Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/24/2024440713701Open ↗
▸BISSTREET TREE SIGNOFF1
01/12/2026440713701Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00718151-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00718151-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00718151-S4Open ↗
08/13/2026Q00718151-S5Open ↗
▸Inspections & Test Reports1
▸BISBPP: FIELD INSPECTION1
01/15/2026440713701Open ↗
▸Approvals, Objections & Sign-offs3
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
09/17/2025440713701Open ↗
▸BISDOT APPROVAL FOR APEX CORNER PED- RAMP1
02/25/2025440713701Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01125865-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
10/15/2025440713701Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
04/21/2022440713701Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/21/2022440713701Open ↗
▸Other Documents37
▸BISBPP - SUPPORTING DOCUMENTATION9
01/15/2026440713701Open ↗
01/15/2026440713701Open ↗
01/15/2026440713701Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00718151-P1Open ↗
08/13/2026Q00718151-B2Open ↗
08/13/2026Q00718151-B1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026Q01073896-I1Open ↗
08/13/2026Q01073896-P1Open ↗
08/13/2026Q01073896-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00718151-B1Open ↗
08/13/2026Q00718151-P1Open ↗
08/13/2026Q00718151-B2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/25/2026Q00718151-B1Open ↗
08/25/2026Q00718151-P1Open ↗
08/25/2026Q00718151-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications4
08/13/2026Q01073896-P2Open ↗
08/13/2026Q01073896-P3Open ↗
08/13/2026Q01073896-P1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
10/15/2025440713701Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
12/24/2024440713701Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
01/15/2026440713701Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/24/2024440713701Open ↗
▸BISDOT COMPLIANCES FOR THE ADA RAMPS AT THE CORNERS1
01/15/2026440713701Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
01/15/2026440713701Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00718151-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00718151-S1Open ↗