← Back
Primarily 2 family with 1 store or office
45-04 VERNON BOULEVARD
QUEENS · Long Island City-Hunters Point · BIN 4307104
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
M1-6A/R9Zoning
4,402 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: DRAGON LAND REALTY · 2,309 sf lot · 1.91 FAR built
Locations of Work
ArchitectureStructuralElectricalFire Protection
Floor 114p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INDETAIL2607/08/2026
DRAGON LAND REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HTX BUILDING CONSULTING INC801/27/2026
INDETAIL ARCHITECTURAL AND ENGIN111/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INDETAIL LLCGeneral Contractor407/08/2026
SAFEPIPE PLUMBING INCPlumbing207/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INDETAIL DESIGN ARCHITECT4828301/27/2026
HRF SERVICES CORP5616512/10/2025
Building Lifecycle
All (63)Filed (9)Permit Issued (6)Violation (1)Inspection (12)Objection (5)Special Inspection (30)
02/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2026
Filed — Alteration CO
File PL work for the eating and drinking establisment with new commercial cooking equipments at 001 .
Q00853981-P5
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jonathan Chin
01/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jonathan Chin
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jonathan Chin
01/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jonathan Chin
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Jonathan Chin
01/13/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/07/2026
Objection raised — Admin
12/22/2025
Filed — Alteration CO
File PL work for the eating and drinking establisment with new commercial cooking equipments at 001 .
Q00853981-P4
12/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jonathan Chin
12/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jonathan Chin
12/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jonathan Chin
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Jonathan Chin
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jonathan Chin
12/18/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/16/2025
Objection raised — Scope
12/16/2025
Objection raised — Admin
12/10/2025
Filed — Alteration CO
File PL work for the eating and drinking establisment with new commercial cooking equipments at 001 .
Q00853981-P3
12/05/2025
Permit issued — Plumbing
Q00853981-S1-PL
12/03/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/03/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
12/03/2025
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
12/03/2025
Special inspection requirement — Structural Steel - High Strength Bolting
FAHAD FATEH
12/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/03/2025
Special inspection requirement — Final
FAHAD FATEH
12/03/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/03/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/03/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
12/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/26/2025
Objection resolved — Resolved
06/12/2025
Permit issued — General Construction
Q00853981-I1-GC-CX
03/05/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/28/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/17/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/13/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/13/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
11/06/2024
Filed — Alteration CO
File PL work for the eating and drinking establisment with new commercial cooking equipments at 001 .
Q00853981-P2
11/04/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/04/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
10/23/2024
Permit issued — Plumbing
Q00853981-S1-PL
10/09/2024
Permit issued — Sprinklers
Q00853981-S3-EW-SP
09/25/2024
Objection raised — Energy
09/24/2024
Filed — Alteration CO
File PL work for the eating and drinking establisment with new commercial cooking equipments at 001 .
Q00853981-S1
09/24/2024
Filed — Alteration CO
File PL work for the eating and drinking establisment with new commercial cooking equipments at 001 .
Q00853981-S2
09/24/2024
Filed — Alteration CO
File PL work for the eating and drinking establisment with new commercial cooking equipments at 001 .
Q00853981-S3
09/24/2024
Permit issued — Structural
Q00853981-I1-GC-CX
09/24/2024
Special inspection requirement — Maintenance information
09/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
09/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
09/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
09/19/2024
Special inspection requirement — Final
FAHAD FATEH
09/19/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/10/2024
Permit issued — General Construction
Q00869296-I1-GC
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG12/05/2025
DOB NOWGeneral ConstructionPermit IssuedINDETAIL LLC06/12/2025
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG10/23/2024
DOB NOWSprinklersPermit IssuedCITYWIDE PLBG, HTG &SPRKL10/09/2024
DOB NOWStructuralPermit IssuedINDETAIL LLC09/24/2024
DOB NOWGeneral ConstructionPermit IssuedINDETAIL LLC05/10/2024
BISPLISSUEDWAGMER ZIV03/22/2007
BISPLISSUEDWAGNER ZIV PLUMBING & HEATING09/06/2005
BIS—ISSUEDJECC INC08/19/2005
BISPLISSUEDSILVANO PLUMB. & HEATG. CO.,INC.09/29/1994
BISOTISSUEDLAO TEH HUNG ARCHITECT07/27/1994
BIS—ISSUEDW.C.L. CONTRUCTION INC.10/12/1993
BISPLISSUEDKIN CHI PLUMBING & HEATING CORP.10/28/1992
BIS—ISSUEDW.C.L. CONTRUCTION INC.10/08/1992
1 project · most recent 01/27/2026
Sprinkler System
FiledStatusContractorScope
01/27/2026Permit IssuedDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 01/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/27/2026Signed-offBELLEROSE PLBG & HTGGas, Water/Sanitary
1 project · most recent 01/27/2026
Steel
FiledStatusContractorScope
01/27/2026Signed-offBELLEROSE PLBG & HTGSteel
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
02/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/18/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/05/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/28/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/04/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
01/23/2026Fire-Resistant Penetrations and JointsJonathan Chinspecial
01/23/2026HVAC-R and service water heating equipmentJonathan Chinenergy_progress
01/23/2026HVAC-R and service water piping design and insulationJonathan Chinenergy_progress
01/23/2026HVAC-R and service water heating system controlsJonathan Chinenergy_progress
01/23/2026Energy Code Compliance InspectionsJonathan Chinprogress
12/19/2025HVAC-R and service water heating equipmentJonathan Chinenergy_progress
12/19/2025HVAC-R and service water piping design and insulationJonathan Chinenergy_progress
12/19/2025HVAC-R and service water heating system controlsJonathan Chinenergy_progress
12/19/2025Energy Code Compliance InspectionsJonathan Chinprogress
12/19/2025Fire-Resistant Penetrations and JointsJonathan Chinspecial
12/03/2025Interior lighting powerFAHAD FATEHenergy_progress
12/03/2025Lighting controlsFAHAD FATEHenergy_progress
12/03/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/03/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/03/2025Structural Steel - DetailsFAHAD FATEHspecial
12/03/2025Structural Steel - High Strength BoltingFAHAD FATEHspecial
12/03/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/03/2025FinalFAHAD FATEHprogress
12/03/2025Fenestration areasFAHAD FATEHenergy_progress
12/03/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
12/03/2025Fenestration air leakageFAHAD FATEHenergy_progress
12/03/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
11/13/2024Sprinkler SystemsFAHAD FATEHspecial
11/04/2024Sprinkler SystemsFAHAD FATEHspecial
09/24/2024Maintenance information—energy_progress
Latest 25 of 42.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026Q00869296-I1Request digital key ↗
08/18/2026Q00853981-S3Request digital key ↗
08/18/2026Q00853981-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026Q00869296-I1Open ↗
08/18/2026Q00853981-I1Open ↗
08/18/2026Q00853981-P4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q00853981-P4Open ↗
09/01/2026Q00853981-P4Open ↗
08/29/2026Q00853981-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q00853981-P2Open ↗
09/01/2026Q00853981-P4Open ↗
08/29/2026Q00853981-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/18/2026Q00853981-I1Open ↗
08/13/2026Q00853981-P3Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/24/2026Q00869296-I1Open ↗
08/18/2026Q00853981-P4Open ↗
08/18/2026Q00853981-S3Open ↗
Showing 3 of 9 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/18/2026Q00853981-I1Open ↗
08/13/2026Q00853981-P3Open ↗
▸DOB NOWWaiver Document1
08/13/2026Q00869296-I1Open ↗