← Back
Two stories - detached, small or mid-size
45-05 243 STREET
QUEENS · BIN 4170079
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R1-2Zoning
2,662 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 7,000 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/23/2022$1.6M—YELLOW RIVER HOLDING LLC → Private party$599/sf building
08/24/2021$1.1M—— → —$421/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT105/06/2024
MEHDI GHAZI, P.E., P.C.506/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING1003/21/2026
AMERGY SOLAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HY DESIGN & DEVELOPMENT LLC.General Contractor603/21/2026
I.P. ELECTRIC INCElectrical103/22/2026
AMERGY SOLAR INCGeneral Contractor107/08/2026
MPS PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802105/06/2024
MEHDI GHAZI, P.E. P.C.7129406/22/2022
Building Lifecycle
All (35)Filed (6)Permit Issued (4)Signed Off (4)Inspection (5)Special Inspection (16)
07/12/2024
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01042899-I1
05/08/2024
Permit issued — Solar
Q01042899-I1-SL
05/06/2024
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01042899-I1
04/29/2024
Special inspection requirement — Air barrier - visual inspection
Chun Feng
04/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
04/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
04/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
04/29/2024
Special inspection requirement — Final
Chun Feng
07/06/2022
Signed off — Alteration
INTERIOR AND EXTERIOR RENOVATION IN EXISTING SINGLE-FAMILY RESIDENCE AS PER PLAN HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q00600217-I1
07/05/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/30/2022
Signed off — Alteration
Q00604872-I1
06/30/2022
Signed off — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00600224-I1
06/22/2022
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION IN EXISTING SINGLE-FAMILY RESIDENCE AS PER PLAN HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q00600217-P1
06/22/2022
Special inspection requirement — Interior lighting power
MEHDI GHAZI
06/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
06/22/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
06/22/2022
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
06/22/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
06/20/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/20/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/15/2022
Special inspection requirement — Interior lighting power
MEHDI GHAZI
06/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
06/15/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
06/15/2022
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
06/15/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
01/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/12/2022
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00600224-P1
01/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
01/05/2022
Permit issued — Plumbing
Q00600224-I1-PL
10/06/2021
Permit issued — Construction Fence
Q00604872-I1-FN
10/04/2021
Filed — Alteration
Q00604872-I1
10/04/2021
Permit issued — General Construction
Q00600217-I1-GC
09/29/2021
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00600224-I1
09/28/2021
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION IN EXISTING SINGLE-FAMILY RESIDENCE AS PER PLAN HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q00600217-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAMERGY SOLAR INC05/08/2024
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN01/05/2022
DOB NOWConstruction FenceSigned-offFANG YE10/06/2021
DOB NOWGeneral ConstructionSigned-offFANG YE10/04/2021
2 projects · most recent 05/05/2024
General Wiring
FiledStatusContractorScope
05/05/2024CompleteI.P. ELECTRIC INC—
06/06/2022CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/05/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/20/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
04/29/2024Air barrier - visual inspectionChun Fengenergy_progress
04/29/2024Fire-Resistant Penetrations and JointsChun Fengspecial
04/29/2024Structural Stability – Alterations of existing buildingsChun Fengspecial
04/29/2024Energy Code Compliance InspectionsChun Fengprogress
04/29/2024FinalChun Fengprogress
06/22/2022Interior lighting powerMEHDI GHAZIenergy_progress
06/22/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
06/22/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
06/22/2022Fenestration air leakageMEHDI GHAZIenergy_progress
06/22/2022Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
06/15/2022Interior lighting powerMEHDI GHAZIenergy_progress
06/15/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
06/15/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
06/15/2022Fenestration air leakageMEHDI GHAZIenergy_progress
06/15/2022Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
01/07/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00600224-I1Request digital key ↗
08/27/2026Q00600224-P1Request digital key ↗
08/27/2026Q00604872-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00600224-I1Open ↗
08/13/2026Q00600224-P1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026Q00600217-P1Open ↗
09/01/2026Q00600217-P1Open ↗
08/27/2026Q01042899-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00600224-I1Open ↗
08/27/2026Q00600224-P1Open ↗
08/27/2026Q00604872-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q00600217-P1Open ↗
08/27/2026Q01042899-I1Open ↗
08/27/2026Q01042899-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00600224-I1Open ↗
08/27/2026Q00600224-P1Open ↗
08/26/2026Q00600217-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00600217-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01042899-I1Open ↗