← Back
Zoned commercial or Manhattan residential
215-16 NORTHERN BOULEVARD
QUEENS · BIN 4623241
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R6BZoning
0 sfGross Floor Area
0Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: DAKOTA UNITED GROUP LLC · 10,075 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof26p · 4 filings · 20 docs
Floor 522p · 4 filings · 20 docs
Floor 422p · 3 filings · 20 docs
Floor 319p · 2 filings · 20 docs
Floor 224p · 4 filings · 20 docs
Floor 1Under Construction53p · 5 filings · 20 docs
Cellar23p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST EGG DEVELOPMENT1009/13/2026
DAKOTA UNITED GROUP5507/08/2026
RELIABLE ENTERPRISES1807/08/2026
LIONS GROUP II1103/22/2026
LIONS GROUP 2 LLC103/22/2026
GROUP II LLC LIONS203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN803/21/2026
GERALD J. CALIENDO R.A., P.C.203/21/2026
GERALD J CALIENDO R A P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LIONS GROUP II LLCGeneral Contractor2407/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor307/08/2026
D.D.S. MECH PBG&HTG CORPPlumbing307/08/2026
DDS MECHANICAL FPS CORPFire Protection207/08/2026
HUDSON BLACK INCGeneral Contractor207/08/2026
JEN-AIRGeneral Contractor107/08/2026
RRP PLUMBING CORPFire Protection107/09/2026
RRP PLUMBING CORPPlumbing107/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983306/17/2026
REGIONAL TESTING CORP.3941303/30/2026
MJE CONSULTING ENGINEERIN8522306/10/2025
Building Lifecycle
All (190)Filed (25)Permit Issued (25)Signed Off (6)Violation (18)Inspection (25)Objection (58)Special Inspection (30)Tax Incentive (3)
09/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/30/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2026
Permit issued — Plumbing
Q01412228-S2-PL
07/07/2026
Permit issued — Sprinklers
Q01412228-S3-EW-SP
06/18/2026
Permit issued — Mechanical Systems
Q01412228-S1-MS
06/17/2026
Filed — Alteration
Sprinkler work as shown on plans
Q01412228-S2
06/17/2026
Filed — Alteration
Sprinkler work as shown on plans
Q01412228-S3
06/17/2026
Filed — Alteration
Sprinkler work as shown on plans
Q01412228-S1
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
06/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
06/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
06/16/2026
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
06/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
06/15/2026
Permit issued — General Construction
Q01412228-I1-GC
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
06/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
06/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
06/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
06/12/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
06/12/2026
Special inspection requirement — Shutoff dampers
ALEXIS SCHLESSINGERMAN
06/12/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
06/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
ALEXIS SCHLESSINGERMAN
06/12/2026
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
06/11/2026
Filed — Alteration
Sprinkler work as shown on plans
Q01412228-I1
06/08/2026
Special inspection requirement — Fenestration areas
ALEXIS SCHLESSINGERMAN
06/08/2026
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
06/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEXIS SCHLESSINGERMAN
06/08/2026
Special inspection requirement — Air barrier - visual inspection
ALEXIS SCHLESSINGERMAN
06/08/2026
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
06/04/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
06/04/2026
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
06/04/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
06/04/2026
Special inspection requirement — Sprinkler Systems
ALEXIS SCHLESSINGERMAN
05/26/2026
Signed off — Alteration
HEREWITH FILING FOR HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 440608941.
Q00654735-I1
04/30/2026
Signed off — Alteration
FOUNDATION & STRUCTURAL WORK FOR NEW FIVE (5) STORY THIRTY- RESIDENTIAL WITHCOMMERICAL @ FIRST FLOOR. FOUNDATION & STRUCTURAL WORK IN CONJUNCTION WITH ARCHITECTURAL APPLICATION # 440608941.
Q00621863-I1
04/29/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/24/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2026
Permit issued — Mechanical Systems
Q00622444-I1-MS
04/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/14/2026
Signed off — Alteration
Herewith filed for an 8 ft plywood construction fence.
Q00731468-I1
04/07/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
04/07/2026
Special inspection requirement — Maintenance information
Paul Raymond
04/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
04/03/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/30/2026
Filed — Alteration
HEREWITH FILING PLUMBING SYSTEM ASSOCIATED WITH NEW FIVE (5) STORY THIRTY-EIGHT (38) DWELLING UNIT RESIDENTIAL WITH COMMERICAL @ FIRST FLOOR.
Q00622431-P2
03/23/2026
Permit issued — General Construction
Q00621863-I1-GC-CX
03/12/2026
Permit issued — Plumbing
Q00622431-I1-PL
01/15/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01075017-I1
12/05/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
12/02/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
10/31/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 190 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP07/07/2026
DOB NOWSprinklersPermit IssuedRRP PLUMBING CORP07/07/2026
DOB NOWMechanical SystemsPermit IssuedHUDSON BLACK INC06/18/2026
DOB NOWGeneral ConstructionPermit IssuedHUDSON BLACK INC06/15/2026
DOB NOWMechanical SystemsPermit IssuedJEN-AIR INC04/15/2026
DOB NOWGeneral ConstructionSigned-offLIONS GROUP II LLC03/23/2026
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP03/12/2026
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC06/10/2025
DOB NOWConstruction FenceSigned-offLIONS GROUP II LLC04/09/2025
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP03/11/2025
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP03/11/2025
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC10/29/2024
DOB NOWConstruction FenceSigned-offLIONS GROUP II LLC10/25/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC07/08/2024
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP03/14/2024
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP03/12/2024
DOB NOWStructuralSigned-offLIONS GROUP II LLC12/08/2023
DOB NOWConstruction FenceSigned-offLIONS GROUP II LLC11/13/2023
DOB NOWSupport of ExcavationSigned-offLIONS GROUP II LLC10/31/2023
DOB NOWSupport of ExcavationSigned-offLIONS GROUP II LLC08/02/2022
DOB NOWGeneral ConstructionSigned-offLIONS GROUP II LLC07/27/2022
DOB NOWConstruction FenceSigned-offLIONS GROUP II LLC07/26/2022
DOB NOWSupport of ExcavationSigned-offLIONS GROUP II LLC06/04/2022
DOB NOWConstruction FenceSigned-offLIONS GROUP II LLC06/03/2022
DOB NOWStructuralSigned-offLIONS GROUP II LLC06/03/2022
BIS—ISSUEDLIONS GROUP II LLC04/21/2025
BIS—ISSUEDLIONS GROUP II LLC04/09/2025
BIS—ISSUEDLIONS GROUP II LLC04/23/2024
BIS—ISSUEDLIONS GROUP II LLC04/23/2024
2 projects · most recent 06/17/2026
Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2026Permit IssuedHUDSON BLACK INCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems—
08/06/2024Permit IssuedJEN-AIR INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin RXSQ24TAVJUA 24,000 BTU · Vrf Outdoor ×74
RXL18TAVJU 18,000 BTU · Heat Pump Outdoor ×2
RXSQ36TAVJUA 36,000 CFM · Vrf Outdoor ×2
RXSQ60TAVJUA 60,000 BTU · Vrf Outdoor ×2
Carrier 24ACC448A 43,200 BTU · Condensing Unit ×8
Heating
Carrier 59SP5A100E21 100,000 BTU · Furnace ×8
Ventilation
Greenheck RV-10-7IG 200,000 BTU · Exhaust Fan ×2
2 projects · most recent 06/17/2026
Sprinkler System
FiledStatusContractorScope
06/17/2026Permit IssuedRRP PLUMBING CORPSprinkler System
05/29/2024Signed-offDDS MECHANICAL FPS CORP545 heads
2 projects · most recent 06/17/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
06/17/2026Permit IssuedRRP PLUMBING CORPGas, Water/Sanitary
03/30/2026Signed-offD.D.S. MECH PBG&HTG CORPGas, Storm, Water/Sanitary
5 projects · most recent 04/27/2026
General Wiring
FiledStatusContractorScope
04/27/2026CompleteSOLID STATE ELECTRIC LLCGeneral Wiring
01/12/2026Permit IssuedHESO ELECTRICAL INCGeneral Wiring
10/29/2024CompleteTUXEDO ELEC'L CONTR'G INC—
10/01/2024CompleteRICHARD NEU—
09/25/2024CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
09/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/24/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/05/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/02/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
10/31/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/31/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/07/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/16/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
06/16/2026Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
06/16/2026HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
06/16/2026Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
06/16/2026HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
06/16/2026HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
06/16/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
06/12/2026HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
06/12/2026HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
06/12/2026Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
06/12/2026Shutoff dampersALEXIS SCHLESSINGERMANenergy_progress
06/12/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
06/12/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
06/12/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
06/12/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
06/12/2026Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
06/12/2026HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
06/12/2026Duct leakage testing, insulation and designALEXIS SCHLESSINGERMANenergy_progress
06/08/2026Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
06/08/2026Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
06/08/2026Fenestration areasALEXIS SCHLESSINGERMANenergy_progress
06/08/2026Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
06/08/2026Fenestration and door U-factor and product ratingsALEXIS SCHLESSINGERMANenergy_progress
06/08/2026Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
06/04/2026Mechanical SystemsALEXIS SCHLESSINGERMANspecial
06/04/2026Sprinkler SystemsALEXIS SCHLESSINGERMANspecial
Latest 25 of 89.
▾Documents — 225 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/26/2026Q00622444-P1Request digital key ↗
08/26/2026Q00622444-I1Request digital key ↗
08/26/2026Q00621838-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits37
▸BISPLAN / WORK APPROVAL APPLICATION24
09/09/2025440608941Open ↗
07/09/2025440608941Open ↗
07/03/2025440608941Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION12
12/26/2025440608941Open ↗
07/14/2025440608941Open ↗
07/14/2025440608941Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
03/05/2021440655961Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
03/04/2024440608941Open ↗
05/02/2022440608941Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/11/2022440608941Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/11/2022440608941Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/03/2020440608941Open ↗
▸Seals & Professional Certifications95
▸DOB NOWSpecial Inspector Seal & Signature41
09/28/2026Q00622431-I1Open ↗
09/18/2026Q00622431-P1Open ↗
09/01/2026Q00621863-P1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/26/2026Q00622444-I1Open ↗
08/26/2026Q00621838-P2Open ↗
08/26/2026Q00621838-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/28/2026Q00622431-I1Open ↗
09/28/2026Q00622431-I1Open ↗
09/28/2026Q00622431-I1Open ↗
Showing 3 of 24 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/05/2021440655961Open ↗
12/03/2020440608941Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/05/2021440655961Open ↗
12/03/2020440608941Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/29/2025440608941Open ↗
▸Trade Schedules & Equipment1
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
10/18/2021440608941Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
03/19/2025440608941Open ↗
03/05/2021440655961Open ↗
12/03/2020440608941Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/22/2024440608941Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
03/01/2024440608941Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
12/27/2023440608941Open ↗
12/27/2023440608941Open ↗
05/02/2022440608941Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/29/2025440608941Open ↗
04/29/2025440608941Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/03/2020440608941Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/22/2026Q00622431-I1Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/27/2023440608941Open ↗
01/05/2021440608941Open ↗
01/05/2021440608941Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
04/29/2025440608941Open ↗
04/01/2024440608941Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
04/29/2025440608941Open ↗
04/01/2024440608941Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/05/2021440608941Open ↗
▸BISSOIL REPORT1
01/05/2021440608941Open ↗
▸Approvals, Objections & Sign-offs18
▸BISSCHEDULE A - OCCUPANCY / USE9
07/09/2025440608941Open ↗
05/07/2025440608941Open ↗
03/24/2025440608941Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
04/29/2025440608941Open ↗
04/29/2025440608941Open ↗
03/01/2024440608941Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER2
07/03/2025440608941Open ↗
06/30/2025440608941Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
04/29/2025440608941Open ↗
12/27/2023440608941Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
04/09/2025440608941Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION6
10/01/2025440608941Open ↗
07/09/2025440608941Open ↗
03/19/2025440608941Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
12/01/2025440608941Open ↗
07/14/2025440608941Open ↗
05/23/2025440608941Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/05/2021440655961Open ↗
12/03/2020440608941Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/05/2021440655961Open ↗
▸Other Documents4
▸BISSUSTAINABLE ROOF ZONE FORM1
12/03/2020440608941Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
03/28/2023440655961Open ↗
▸BISPLOT DIAGRAM1
12/03/2020440608941Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00621838-I1Open ↗