← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Arcadia Sunnyside
45-07 45TH STREET · Name © OpenStreetMap contributors · Sunnyside · BIN 4624284
💬 Discuss this project
2023Year Built
8Stories
D7Building Class
C4-4AZoning
78,888 sfGross Floor Area
64Units
17 Active Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: 4502 Sunnyside · 13,018 sf lot · 6.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsPersonnel and Material Hoist Installation2 filings
Roof4502 Sunnyside, LLC3p · 3 filings
BulkheadTemporary suspended scaffolds installation1p · 1 filing
Floor 8Mobile equipment installation1 filing
Floor 7Mobile equipment installation1 filing
Floor 6Mobile equipment installation1 filing
Floor 5Mobile equipment installation1 filing
Floor 4Mobile equipment installation1 filing
Floor 3Mobile equipment installation1 filing
Floor 2Mobile equipment installation1 filing
Floor 1Spear Sunnyside4p · 5 filings · 9 docs
Site & exteriorSpear7 filings · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4502 Sunnyside9809/13/2026
Rasell Realty504/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2022$11.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting2203/21/2026
MY Architect1803/21/2026
Rigid Structural Design303/21/2026
Milrose Consultants403/21/2026
TWP Design Consulting603/21/2026
AE Design Solution403/21/2026
Ace-NYC Zoning and Code Consultants203/21/2026
Avalon Design203/21/2026
Kataria Builders203/21/2026
Lombardo Building Consultants103/21/2026
Ark Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JLS Group ConstructionGeneral Contractor1807/08/2026
JLS Group ConstructionScaffold707/08/2026
Dynamic Hoisting ScaffScaffold404/09/2026
Vip Fire SprinklerFire Protection407/08/2026
Safepipe PlumbingFire Protection307/08/2026
AL-Lectric Elect'l ContractingElectrical203/22/2026
LW Interior RemodelingGeneral Contractor204/09/2026
DPH Plumbing & HeatingPlumbing207/08/2026
JL WorksScaffold104/09/2026
JSB WorksScaffold104/09/2026
MC SuperstructureScaffold104/09/2026
PRD GroupScaffold107/08/2026
Right Angle ConstructionScaffold107/08/2026
Signstar NYCSign hanger107/08/2026
High Quality Electric ofElectrical103/22/2026
Orbit SprinklerFire Protection106/27/2026
Accord PowerGeneral Contractor104/09/2026
Safepipe PlumbingPlumbing107/08/2026
Top Plumbing and HeatingPlumbing107/08/2026
MY ArchitectGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Catalpa Special Inspectio2004405/08/2026
MEP Inspections1102205/08/2026
Ark Engineering72612304/21/2026
Spivak Architects6957402/25/2026
Skyline Rigging7880411/27/2024
Synergic Design8561110/29/2024
Building Lifecycle
All (195)Filed (46)Permit Issued (43)Signed Off (23)Violation (4)Inspection (21)Objection (25)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
09/16/2026
Signed off — Alteration
Mechanical modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01353586-I1
08/05/2026
Signed off — Alteration
Q01405784-I1
07/20/2026
Signed off — Alteration
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01353617-I1
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Lau
07/17/2026
Special inspection requirement — Insulation placement and R values
George Lau
07/17/2026
Special inspection requirement — Air barrier - visual inspection
George Lau
07/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
George Lau
07/17/2026
Special inspection requirement — Fenestration areas
George Lau
07/17/2026
Special inspection requirement — Preliminary
George Lau
07/17/2026
Special inspection requirement — Fenestration air leakage
George Lau
07/17/2026
Special inspection requirement — Protection of exposed foundation insulation
George Lau
07/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
George Lau
07/17/2026
Special inspection requirement — Air barrier continuity plan testing
George Lau
07/17/2026
Special inspection requirement — Vestibules
George Lau
07/17/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
George Lau
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
George Lau
06/15/2026
Signed off — Alteration
Q01353609-I1
06/02/2026
Objection resolved — Resolved
06/01/2026
Objection raised — Other
05/29/2026
Permit issued — Sign
Q01405784-I1-SG
05/22/2026
Filed — Alteration
Q01405784-I1
05/22/2026
Special inspection requirement — Final
ADITYA DESAI
05/19/2026
Signed off — Alteration
Q01353561-I1
05/12/2026
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
05/12/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
Howard Spivak
05/08/2026
Filed — Alteration
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01353617-P1
05/06/2026
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
05/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/06/2026
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
04/21/2026
Filed — New Building
Subsequently Filed Plumbing Scope of Work for New 8-story Mixed-Use Building in Conjunction with NB-GC # Q00718151-I1.
Q00718151-B2
04/17/2026
Special inspection requirement — Fenestration air leakage
George Lau
04/17/2026
Special inspection requirement — Preliminary
George Lau
04/17/2026
Special inspection requirement — Insulation placement and R values
George Lau
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Lau
04/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
George Lau
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
George Lau
04/17/2026
Special inspection requirement — Protection of exposed foundation insulation
George Lau
04/17/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
George Lau
04/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/25/2026
Objection raised — Admin
03/16/2026
Permit issued — Plumbing
Q01353609-I1-PL
03/13/2026
Permit issued — Sprinklers
Q01353617-I1-EW-SP
03/09/2026
Permit issued — General Construction
Q01353561-I1-GC
03/09/2026
Permit issued — Mechanical Systems
Q01353586-I1-MS
02/25/2026
Filed — Alteration
Mechanical modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01353586-I1
02/25/2026
Filed — Alteration
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Q01353617-I1
02/25/2026
Filed — Alteration
Q01353609-I1
02/23/2026
Filed — Alteration
Q01353561-I1
01/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2025
Filed — New Building
Subsequently Filed Plumbing Scope of Work for New 8-story Mixed-Use Building in Conjunction with NB-GC # Q00718151-I1.
Q00718151-B1
10/30/2025
Signed off — New Building
Subsequently Filed Plumbing Scope of Work for New 8-story Mixed-Use Building in Conjunction with NB-GC # Q00718151-I1.
Q00718151-S6
10/30/2025
Signed off — New Building
Subsequently Filed Plumbing Scope of Work for New 8-story Mixed-Use Building in Conjunction with NB-GC # Q00718151-I1.
Q00718151-S5
10/14/2025
Signed off — New Building
Subsequently Filed Plumbing Scope of Work for New 8-story Mixed-Use Building in Conjunction with NB-GC # Q00718151-I1.
Q00718151-S4
09/19/2025
Signed off — Alteration
New 16'-3" Curb Cut. Filed in conjunction with BPP 440713701 and New Building Q00718151
Q00721247-I1
09/18/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSignstar NYC05/29/2026
DOB NOWPlumbingSigned-offTop Plumbing and Heating03/16/2026
DOB NOWSprinklersSigned-offOrbit Sprinkler03/13/2026
DOB NOWGeneral ConstructionSigned-offLW Interior Remodeling03/09/2026
DOB NOWMechanical SystemsSigned-offLW Interior Remodeling03/09/2026
DOB NOWCurb CutSigned-offJLS Group Construction07/14/2025
DOB NOWConstruction FenceSigned-offJLS Group Construction04/23/2025
DOB NOWStandpipeSigned-offBellerose Plumbing & Heating04/03/2025
DOB NOWSprinklersSigned-offBellerose Plumbing & Heating04/03/2025
DOB NOWStandpipeSigned-offBellerose Plumbing & Heating04/02/2025
DOB NOWPlumbingSigned-offBellerose Plumbing & Heating02/06/2025
DOB NOWGeneral ConstructionPermit IssuedJLS Group Construction01/23/2025
DOB NOWSolarSigned-offAccord Power11/06/2024
DOB NOWMechanical SystemsSigned-offJLS Group Construction10/21/2024
DOB NOWStandpipeSigned-offVip Fire Sprinkler10/10/2024
DOB NOWProtection and Mechanical MethodsSigned-offJLS Group Construction09/20/2024
DOB NOWGeneral ConstructionPermit IssuedJLS Group Construction09/17/2024
DOB NOWSidewalk ShedSigned-offDynamic Hoisting Scaff08/06/2024
DOB NOWPlumbingSigned-offDPH Plumbing & Heating07/30/2024
DOB NOWSuspended ScaffoldSigned-offDoria07/01/2024
DOB NOWSidewalk ShedSigned-offDynamic Hoisting Scaff06/03/2024
DOB NOWConstruction FenceSigned-offJLS Group Construction04/30/2024
DOB NOWStandpipeSigned-offVip Fire Sprinkler12/28/2023
DOB NOWSprinklersSigned-offVip Fire Sprinkler12/28/2023
DOB NOWStandpipeSigned-offVip Fire Sprinkler11/09/2023
DOB NOWFoundationSigned-offJLS Group Construction10/18/2023
DOB NOWGeneral ConstructionPermit IssuedJLS Group Construction10/13/2023
DOB NOWSupport of ExcavationSigned-offJLS Group Construction10/13/2023
DOB NOWStructuralSigned-offJLS Group Construction10/11/2023
DOB NOWSidewalk ShedSigned-offPRD Group09/22/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC Superstructure09/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offJLS Group Construction08/31/2023
DOB NOWFoundationSigned-offJLS Group Construction07/19/2023
DOB NOWStructuralSigned-offJLS Group Construction07/19/2023
DOB NOWPlumbingSigned-offDPH Plumbing & Heating07/17/2023
DOB NOWFoundationSigned-offJLS Group Construction05/04/2023
DOB NOWConstruction FenceSigned-offJLS Group Construction05/03/2023
DOB NOWGeneral ConstructionPermit IssuedJLS Group Construction02/02/2023
DOB NOWSupport of ExcavationSigned-offJLS Group Construction12/22/2022
DOB NOWConstruction FenceSigned-offJLS Group Construction05/12/2022
+ 3 more permits on file
1 project · most recent 04/21/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/21/2026Permit IssuedJLS Group ConstructionHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg LMU361HHV 45,000 BTU · Vrf Outdoor ×74
LMU300HHV 28,600 BTU · Vrf Outdoor ×54
LUU240HHV 30,120 BTU · Heat Pump Outdoor ×2
Daikin RXYQ72TATJU 81,000 BTU · Vrf Outdoor ×6
RXSQ24TAVJU 27,000 BTU · Vrf Outdoor ×2
RXYQ120TATJU 135,000 BTU · Vrf Outdoor ×2
RXYQ96TATJU 108,000 BTU · Vrf Outdoor ×2
Aaon RN-013-8-0-EB09-3GB 292,500 BTU · Rooftop Unit ×4
Ventilation
Greenheck USF-08 620 CFM · Exhaust Fan ×4
CUE-099-VG 150 CFM · Exhaust Fan ×2
USF-10 650 CFM · Exhaust Fan ×2
USF-24 7,200 CFM · Exhaust Fan ×2
2 projects · most recent 05/08/2026
Sprinkler System
FiledStatusContractorScope
05/08/2026Signed-offOrbit Sprinkler—
04/21/2026Signed-offSafepipe PlumbingSprinkler System
1 project · most recent 04/21/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/21/2026Signed-offBellerose Plumbing & HeatingGas, Storm, Water/Sanitary
11 projects · most recent 03/13/2026
General Wiring
FiledStatusContractorScope
03/13/2026CompleteP & Z ElectricGeneral Wiring
11/04/2024CompleteAccord Power Electric—
10/03/2024CompleteAL-Lectric Elect'l ContractingGeneral Wiring
03/13/2024CompleteAL-Lectric Elect'l ContractingGeneral Wiring
11/09/2023CompleteAL-Lectric Elect'l Contracting—
11/07/2023CompleteUxedo Electrical Contracting—
09/27/2023CompleteHigh Quality Electric of—
09/12/2023CompleteNash Electric Services—
12/09/2022CompleteAL-Lectric Elect'l Contracting1 meters, 1 new_meters
08/22/2022CancelledAL-Lectric Elect'l Contracting1 meters, 1 new_meters
12/14/2018CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
04/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/18/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/23/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/28/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
04/28/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/25/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/23/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/10/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
11/16/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/02/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/17/2026Fenestration air leakageGeorge Lauenergy_progress
07/17/2026Fire-Resistant Penetrations and JointsGeorge Lauspecial
07/17/2026PreliminaryGeorge Lauprogress
07/17/2026Fire-Resistance Rated ConstructionGeorge Lauprogress
07/17/2026Wall Panels, Curtain Walls, and VeneersGeorge Lauspecial
07/17/2026Air barrier - visual inspectionGeorge Lauenergy_progress
07/17/2026Insulation placement and R valuesGeorge Lauenergy_progress
07/17/2026Air barrier continuity plan testingGeorge Lauenergy_progress
07/17/2026Fenestration and door U-factor and product ratingsGeorge Lauenergy_progress
07/17/2026Fenestration areasGeorge Lauenergy_progress
07/17/2026Protection of exposed foundation insulationGeorge Lauenergy_progress
07/17/2026Energy Code Compliance InspectionsGeorge Lauprogress
07/17/2026VestibulesGeorge Lauenergy_progress
05/22/2026FinalADITYA DESAIprogress
05/12/2026Sprinkler SystemsNicolas Crosettospecial
05/12/2026Post-installed AnchorsNicolas Crosettospecial
05/12/2026Tenant Protection Plan ComplianceHoward Spivakspecial
05/12/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
05/06/2026Tenant Protection Plan Compliance—special
05/06/2026Sprinkler SystemsNicolas Crosettospecial
05/06/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
05/06/2026Post-installed AnchorsNicolas Crosettospecial
04/17/2026Air barrier - visual inspectionGeorge Lauenergy_progress
04/17/2026Fenestration areasGeorge Lauenergy_progress
04/17/2026Air barrier continuity plan testingGeorge Lauenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SpearOffice—
Project Q01405784 Alteration · LOC Issued · 05/22/2026
Spear SunnysideMedical / HealthcareFloor 1
Project Q01353586 Alteration · LOC Issued · 02/25/2026
Project Q01353609 Alteration · LOC Issued · 02/25/2026
Project Q01353617 Alteration · LOC Issued · 02/25/2026
Project Q01353561 Alteration · LOC Issued · 02/23/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 218 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch40
08/26/2026Q00721247-I1Request digital key ↗
08/26/2026Q00711022-I1Request digital key ↗
08/25/2026Q00718151-A6Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/28/2026Q00110567-I1Request digital key ↗
08/28/2026Q00217841-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00110558-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION1
04/21/2022440713701Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
10/15/2025440713701Open ↗
▸BISDOT-410 PERMITS FOR ADA RAMPS1
01/15/2026440713701Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/21/2022440713701Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00718151-I1Open ↗
08/13/2026Q00718151-B2Open ↗
08/13/2026Q00718151-B1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00718151-B2Open ↗
08/13/2026Q00718151-B1Open ↗
08/13/2026Q00718151-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00718151-I1Open ↗
▸Seals & Professional Certifications102
▸DOB NOWDPL-1: Design Professional Seal & Signature45
08/28/2026Q00110567-I1Open ↗
08/26/2026Q00711022-I1Open ↗
08/25/2026Q00718151-P1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026Q00718151-A2Open ↗
09/02/2026Q01073896-P1Open ↗
09/01/2026Q00718151-A4Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/29/2026Q01405784-I1Open ↗
09/23/2026Q00718151-A2Open ↗
09/01/2026Q00718151-A4Open ↗
Showing 3 of 23 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/21/2022440713701Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/21/2022440713701Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00718151-B1Open ↗
08/13/2026Q00718151-P1Open ↗
08/13/2026Q00718151-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026Q00718151-I1—
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00718151-B2Open ↗
08/13/2026Q00718151-I1Open ↗
08/13/2026Q00718151-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
12/24/2024440713701Open ↗
04/21/2022440713701Open ↗
▸BISSTREET TREES SITE PLAN1
10/15/2025440713701Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/24/2024440713701Open ↗
▸BISSTREET TREE SIGNOFF1
01/12/2026440713701Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00718151-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00718151-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00718151-S4Open ↗
08/13/2026Q00718151-S5Open ↗
▸Inspections & Test Reports1
▸BISBPP: FIELD INSPECTION1
01/15/2026440713701Open ↗
▸Approvals, Objections & Sign-offs3
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
09/17/2025440713701Open ↗
▸BISDOT APPROVAL FOR APEX CORNER PED- RAMP1
02/25/2025440713701Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01125865-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
10/15/2025440713701Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
04/21/2022440713701Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/21/2022440713701Open ↗
▸Other Documents37
▸BISBPP - SUPPORTING DOCUMENTATION9
01/15/2026440713701Open ↗
01/15/2026440713701Open ↗
01/15/2026440713701Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00718151-P1Open ↗
08/13/2026Q00718151-B2Open ↗
08/13/2026Q00718151-B1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026Q01073896-I1Open ↗
08/13/2026Q01073896-P1Open ↗
08/13/2026Q01073896-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00718151-B1Open ↗
08/13/2026Q00718151-P1Open ↗
08/13/2026Q00718151-B2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/25/2026Q00718151-B1Open ↗
08/25/2026Q00718151-P1Open ↗
08/25/2026Q00718151-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications4
08/13/2026Q01073896-P2Open ↗
08/13/2026Q01073896-P3Open ↗
08/13/2026Q01073896-P1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
10/15/2025440713701Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
12/24/2024440713701Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
01/15/2026440713701Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/24/2024440713701Open ↗
▸BISDOT COMPLIANCES FOR THE ADA RAMPS AT THE CORNERS1
01/15/2026440713701Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
01/15/2026440713701Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00718151-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00718151-S1Open ↗