← Back
BuildNYC
Two stories - detached, small or mid-size
45-21 ZION STREET
QUEENS · BIN 4170686
💬 Discuss this project
1920Year Built
2.75Stories
A1Building Class
R2AZoning
1,616 sfGross Floor Area
1Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 6,300 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof9p · 2 filings · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 110p · 2 filings · 20 docs
Cellar4p · 1 filing · 20 docs
Site & exterior5p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2017$815K—Private party → Private party$504/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Fang Architect305/19/2025
Agt Architecture201/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Fang Architect503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Home Style ImprovementsGeneral Contractor303/21/2026
Amm General ContractingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fang Architect5513505/19/2025
Triangle Inspection & Tes7495201/13/2025
Building Lifecycle
08/14/2025
Signed off — Alteration
PROPOSED A HORIZONTAL EXTENSION TO AN EXISTING 1-FAMILY HOUSE. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00793716-I1
08/14/2025
Signed off — Alteration
FILED PLUMBING WORK FOR A 1-FAMILY HOUSE EXTENSION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q08009605-I1
08/13/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/24/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
55 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAmm General Contracting09/20/2024
DOB NOWStructuralSigned-offHome Style Improvements09/05/2024
2 projects · most recent 10/07/2024
General Wiring
FiledStatusContractorScope
10/07/2024CompleteP.L. Electrical ContractingGeneral Wiring
01/09/2018CompleteP.L. Electrical Contracting—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/13/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/24/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/21/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
07/03/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
07/03/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
07/03/2025Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
07/03/2025Concrete - Cast-In-PlaceDEZHANG FANGspecial
07/03/2025Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
07/03/2025FinalDEZHANG FANGprogress
07/03/2025Fire-Resistance Rated ConstructionDEZHANG FANGprogress
07/03/2025Footing and FoundationDEZHANG FANGprogress
07/03/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
07/03/2025Structural Wood FrameDEZHANG FANGprogress
07/03/2025Fenestration air leakageDEZHANG FANGenergy_progress
07/03/2025Fenestration areasDEZHANG FANGenergy_progress
07/03/2025Insulation placement and R valuesDEZHANG FANGenergy_progress
07/03/2025Air barrier - visual inspectionDEZHANG FANGenergy_progress
07/03/2025Interior lighting powerDEZHANG FANGenergy_progress
07/03/2025Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
05/16/2025Structural Wood FrameDEZHANG FANGprogress
05/16/2025Concrete - Cast-In-PlaceDEZHANG FANGspecial
05/16/2025Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
05/16/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
05/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
05/16/2025Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
05/16/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
05/16/2025FinalDEZHANG FANGprogress
05/16/2025Fire-Resistance Rated ConstructionDEZHANG FANGprogress
Latest 25 of 54.
41 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account