← Back
Elevator apt, semi-fireproof with stores
Sunny View Condominium
45-29 47 STREET · BIN 4518762
💬 Discuss this project
2022Year Built
6Stories
D7Building Class
R6AZoning
—Gross Floor Area
12Units
0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: SUNNYSIDE 47TH STREET LLC · 3.88 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALL STATE 12 GENERAL CONT2303/22/2026
ARMAAN HOLDINGS203/22/2026
ARMAAN HOLDINSG LLC103/22/2026
SUNNYSIDE 47TH STREET LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VIP FIRE SPRINKLER INCFire Protection107/03/2026
LASER ELECTRICAL CONTRACTGeneral Contractor107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOMATED DESIGN CONSULTA895209/25/2023
AA BUILDING & INSPECTION1519802/01/2023
Building Lifecycle
All (141)Filed (20)Permit Issued (15)Signed Off (12)Violation (40)Inspection (2)Objection (22)Special Inspection (30)
03/10/2025
Signed off — Alteration
Install mechanical systems per the plans filed herewith and in conjunction with NB#421921460. There is no change in use occupancy or egress.
Q00371646-I1
02/03/2025
Signed off — Alteration
PROPOSED STRUCTURAL DESIGN 6 STORY NEW BUILDING IN CONJUNCTION WITH APPLICATION NUMBER 421921460. NO CHANGE IN USE, EGRESS, BULK, AND/OR OCCUPANCY.
Q00369628-I1
02/03/2025
Signed off — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#421921460. The system is hydraulically calculated. There is no change in use occupancy or egress.
Q00372188-I1
01/28/2025
Signed off — Alteration
Provide excavation, underpinning, footing and foundation for mixed use six story and cellar new building in conjunction with NB application # 421921460. No change in use, egress, bulk, and/or occupancy.
Q00750560-I1
11/26/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/28/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00276564-I1
09/06/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/10/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/09/2024
Permit issued — Mechanical Systems
Q00371646-I1-MS
03/19/2024
Signed off — Alteration
Q00179637-I1
03/08/2024
Signed off — Alteration
FILED HEREWITH TO INSTALL TEMPORARY 8' CONSTRUCTION FENCE IN CONJUNCTION WITH NB 421921460
Q08050321-I1
10/27/2023
Violation issued (ECB, closed)
Construction
10/27/2023
Violation issued (ECB, closed)
Construction
10/27/2023
Violation issued (ECB, closed)
Construction
10/16/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00901240-I1
10/16/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00859074-I1
10/16/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00829816-I1
10/16/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00911839-I1
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/25/2023
Filed — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#421921460. The system is hydraulically calculated. There is no change in use occupancy or egress.
Q00372188-P1
09/21/2023
Special inspection requirement — Sprinkler Systems
Gregory Mortman
09/16/2023
Violation issued (ECB, closed)
Construction
09/16/2023
Violation issued (ECB, closed)
Construction
08/24/2023
Permit issued — Construction Fence
Q08050321-I1-FN
07/31/2023
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00911839-I1
07/31/2023
Permit issued — Protection and Mechanical Methods
Q00911839-I1-PMM
07/19/2023
Violation issued (ECB, closed)
Construction
07/07/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00901240-I1
07/07/2023
Permit issued — Supported Scaffold
Q00901240-I1-SF
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2023
Violation issued (ECB, closed)
Construction
06/02/2023
Violation issued (ECB, closed)
Construction
05/12/2023
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00859074-P2
05/08/2023
Signed off — Alteration
Q00745972-I1
05/02/2023
Violation issued (ECB, closed)
Construction
05/02/2023
Violation issued (ECB, closed)
Construction
05/02/2023
Violation issued (ECB, closed)
Construction
05/02/2023
Violation issued (ECB, closed)
Construction
05/02/2023
Violation issued (ECB, closed)
Construction
05/02/2023
Violation issued (ECB, closed)
Site Safety
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/18/2023
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00859074-P1
04/13/2023
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00859074-I1
04/13/2023
Permit issued — Protection and Mechanical Methods
Q00859074-I1-PMM
04/13/2023
Violation issued (ECB, closed)
Construction
04/13/2023
Violation issued (ECB, closed)
Construction
03/29/2023
Violation issued (ECB, closed)
Construction
03/29/2023
Violation issued (ECB, closed)
Construction
03/29/2023
Violation issued (ECB, closed)
Construction
03/29/2023
Violation issued (ECB, closed)
Construction
03/28/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00829816-P1
03/09/2023
Permit issued — Sprinklers
Q00372188-I1-EW-SP
02/20/2023
Special inspection requirement — Underpinning
Younes Abouyaala
02/20/2023
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
02/20/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
02/20/2023
Special inspection requirement — Final
NAVEEN KUMAR
02/20/2023
Special inspection requirement — Footing and Foundation
Younes Abouyaala
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offL & VHVAC CORP05/09/2024
DOB NOWConstruction FenceSigned-offALL STATE 12 GENERAL CONT08/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offRELIABLE ENTERPRISES INC07/31/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC07/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offRELIABLE ENTERPRISES INC04/13/2023
DOB NOWSprinklersSigned-offVIP FIRE SPRINKLER INC03/09/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC02/17/2023
DOB NOWConstruction FenceSigned-offALL STATE 12 GENERAL CONT12/12/2022
DOB NOWSupport of ExcavationSigned-offALL STATE 12 GENERAL CONT09/30/2022
DOB NOWFoundationSigned-offALL STATE 12 GENERAL CONT09/30/2022
DOB NOWStructuralSigned-offALL STATE 12 GENERAL CONT09/21/2022
DOB NOWConstruction FenceSigned-offLASER ELECTRICAL CONTRACT09/13/2021
DOB NOWConstruction FenceSigned-offLASER ELECTRICAL CONTRACT05/18/2021
DOB NOWSidewalk ShedSigned-offLASER ELECTRICAL CONTRACT12/11/2019
DOB NOWConstruction FenceSigned-offLASER ELECTRICAL CONTRACT08/02/2019
BISPLISSUEDDPH PLUMBING & HTG CORP08/29/2024
BIS—ISSUEDALL STATE 12 GENERAL CONTRACTING09/05/2023
BIS—ISSUEDALL STATE 12 GENERAL CONTRACTING09/04/2023
BISPLISSUEDDPH PLUMBING & HTG CORP02/03/2023
BIS—ISSUEDALL STATE 12 GENERAL CONTRACTING08/26/2022
BIS—ISSUEDALL STATE 12 GENERAL CONTRACTING08/26/2022
BIS—ISSUEDALL STATE 12 GENERAL CONTRACTING06/01/2022
BIS—ISSUEDALL STATE 12 GENERAL CONTRACTING05/18/2022
BISPLISSUEDBILLHARZ PLUMBING, INC02/01/2013
BISPLISSUEDBILLHARZ PLUMBING INC05/16/2003
BIS—ISSUEDNEW YORK CONCRETE PUMPING03/27/2003
5 projects · most recent 10/15/2024
General Wiring
FiledStatusContractorScope
10/15/2024CompleteJD ELECTRICAL ENTERPRISESGeneral Wiring
08/11/2023CompleteR.C.M. ELECTRIC CORP.—
03/25/2023CompleteJD ELECTRICAL ENTERPRISES—
02/17/2023CompleteRICHARD NEU—
12/06/2019CompleteLASER ELEC'L CONTR'G INC—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
09/21/2023Sprinkler SystemsGregory Mortmanspecial
02/20/2023UnderpinningYounes Abouyaalaspecial
02/20/2023Subgrade InspectionsYounes Abouyaalaspecial
02/20/2023Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
02/20/2023FinalNAVEEN KUMARprogress
02/20/2023Footing and FoundationYounes Abouyaalaprogress
02/20/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
02/20/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/20/2023Post-installed AnchorsYounes Abouyaalaspecial
02/01/2023UnderpinningYounes Abouyaalaspecial
02/01/2023FinalNAVEEN KUMARprogress
02/01/2023Footing and FoundationYounes Abouyaalaprogress
02/01/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
02/01/2023Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
02/01/2023Post-installed AnchorsYounes Abouyaalaspecial
02/01/2023Subgrade InspectionsYounes Abouyaalaspecial
02/01/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
01/26/2023FinalVatche Ghazarianprogress
01/26/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/26/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/26/2023MasonryYounes Abouyaalaspecial
12/09/2022MasonryYounes Abouyaalaspecial
12/09/2022Concrete - Cast-In-PlaceYounes Abouyaalaspecial
12/09/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/09/2022FinalVatche Ghazarianprogress
Latest 25 of 42.
▾Documents — 232 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch12
08/26/2026Q00745972-I1Request digital key ↗
08/25/2026Q00750560-I1Request digital key ↗
08/25/2026Q08050321-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Structural3
08/15/2026Q00369628-P2Request digital key ↗
08/15/2026Q00369628-P1Request digital key ↗
08/14/2026Q00369628-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/24/2026Q00372188-I1Request digital key ↗
08/24/2026Q00372188-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00371646-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00179637-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00276564-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION19
08/04/2025421921460Open ↗
07/31/2025421921460Open ↗
06/11/2025421921460Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION8
09/20/2023421921460Open ↗
02/03/2023421921460Open ↗
06/30/2022421921460Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
04/05/2023421903630Open ↗
11/06/2019421903630Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
04/21/2025421903630Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/09/2020421921460Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISRESTRICTION: RESTRICTIVE DECLARATION2
10/17/2019421921460Open ↗
10/17/2019421921460Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/26/2025421805185Open ↗
▸BISZONING DIAGRAM ACCEPTANCE1
06/10/2020421921460Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/26/2025421805185Open ↗
▸BISVERIFY TAX LOT1
04/28/2025421921460Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/28/2025421921460Open ↗
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/25/2026Q00750560-P2Open ↗
08/25/2026Q00750560-I1Open ↗
08/25/2026Q00750560-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/26/2026Q00369628-P2Open ↗
09/01/2026Q00745972-I1Open ↗
08/30/2026Q00750560-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/26/2026Q00369628-P2Open ↗
08/30/2026Q00750560-P2Open ↗
08/30/2026Q00750560-P2Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
06/30/2022421921460Open ↗
10/17/2019421921460Open ↗
10/17/2019421921460Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment19
▸BISSELF-CERT PLUMBING NOTICE6
11/23/2013401449287Open ↗
11/01/2013401449287Open ↗
10/28/2013401449287Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
06/10/2024421921460Open ↗
06/04/2024421921460Open ↗
06/03/2024421921460Open ↗
Showing 3 of 4 on file for this type
▸BISGAS CUT-OFF1
08/20/2019421862602Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/27/2025421921460Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
05/07/2025421921460Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/27/2025421921460Open ↗
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
06/09/2020421921460Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/26/2019421921460Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/28/2025421921460Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
08/03/2013401449287Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
04/28/2025421921460Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
11/06/2019421903630Open ↗
09/13/2019421921460Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/20/2019421862602Open ↗
08/20/2019421862602Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/30/2022421921460Open ↗
06/26/2019421921460Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
03/27/2025421921460Open ↗
▸BISINTERIOR LIGHTING POWER1
03/27/2025421921460Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/27/2025421921460Open ↗
▸BISFENESTRATION AREAS1
03/27/2025421921460Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/04/2025421921460Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/27/2025421921460Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00371646-I1Open ↗
▸Inspections & Test Reports17
▸DOB NOWSOIL REPORT3
08/13/2026Q00750560-P2Open ↗
08/13/2026Q00750560-P1Open ↗
08/13/2026Q00750560-I1Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
04/30/2025421921460Open ↗
05/18/2022421921460Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/09/2026421921460Open ↗
06/30/2022421903630Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
05/18/2022421921460Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/27/2025421921460Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/27/2025421921460Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/27/2025421921460Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/27/2025421921460Open ↗
▸BISMASONRY1
04/04/2025421921460Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
05/01/2025421921460Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/10/2020421921460Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00750560-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00750560-I1Open ↗
▸Approvals, Objections & Sign-offs19
▸BISSCHEDULE A - OCCUPANCY / USE8
08/26/2025421805185Open ↗
08/04/2025421921460Open ↗
07/31/2025421921460Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/26/2025421805185Open ↗
08/26/2025421805185Open ↗
06/30/2022421921460Open ↗
Showing 3 of 7 on file for this type
▸BISHOUSE CONNECTION SIGNOFF2
08/20/2019421862602Open ↗
08/20/2019421862602Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
08/20/2019421862602Open ↗
▸BISLANDMARKS APPROVAL1
08/20/2019421862602Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
08/30/2022421921460Open ↗
08/20/2019421862602Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION6
08/26/2025421805185Open ↗
08/05/2025421921460Open ↗
06/11/2025421921460Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET3
11/06/2019421903630Open ↗
06/26/2019421921460Open ↗
06/14/2019421862602Open ↗
▸BISBOROUGH INTAKE FORM3
09/20/2023421921460Open ↗
06/29/2022421921460Open ↗
06/24/2022421921460Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/06/2019421903630Open ↗
▸Other Documents14
▸BISBPP - SUPPORTING DOCUMENTATION3
04/21/2025421903630Open ↗
04/21/2025421903630Open ↗
04/21/2025421903630Open ↗
▸BISPLOT DIAGRAM3
08/26/2025421805185Open ↗
08/02/2019421921460Open ↗
06/26/2019421921460Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00745972-I1Open ↗
08/13/2026Q00750560-I1Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
04/21/2025421903630Open ↗
▸BISSHUTOFF DAMPERS1
03/27/2025421921460Open ↗
▸BISUNDERPINNING (2014)1
03/27/2025421921460Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
04/15/2025421921460Open ↗
▸BISMAINTENANCE INFORMATION1
03/27/2025421921460Open ↗
▸BISPERMANENT CERTIFICATE1
03/27/2025421921460Open ↗