← Back
Two stories - detached, small or mid-size
45-30 170 STREET
QUEENS · BIN 4123524
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R2AZoning
1,216 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,500 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KUNDMUELLER807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CE ARCHITECT, PLLC302/16/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CE ARCHITECT, PLLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARISTON CONSTRUCTION CO INCGeneral Contractor304/09/2026
WATER DYNAMIC P & H CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495302/16/2026
Building Lifecycle
All (33)Filed (3)Permit Issued (4)Signed Off (2)Violation (5)Inspection (5)Special Inspection (14)
03/26/2026
Signed off — Alteration
HEREWITH FILED TO REPLACE FIXTURES IN EXISTING KITCHEN, BATHROOMS AND LAUNDRY. CONVERT EXISTING OIL FIRED COMBI. BOILER TO NEW GAS FIRED COMBI. BOILER.
Q01165658-S1
03/26/2026
Signed off — Alteration
HEREWITH FILED TO REPLACE FIXTURES IN EXISTING KITCHEN, BATHROOMS AND LAUNDRY. CONVERT EXISTING OIL FIRED COMBI. BOILER TO NEW GAS FIRED COMBI. BOILER.
Q01165658-I1
03/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/16/2026
Filed — Alteration
HEREWITH FILED TO REPLACE FIXTURES IN EXISTING KITCHEN, BATHROOMS AND LAUNDRY. CONVERT EXISTING OIL FIRED COMBI. BOILER TO NEW GAS FIRED COMBI. BOILER.
Q01165658-P1
02/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/12/2026
Permit issued — General Construction
Q01165658-I1-GC-CX
12/01/2025
Permit issued — Plumbing
Q01165658-S1-PL
10/15/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/09/2025
Permit issued — Plumbing
Q01165658-S1-PL
04/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/2025
Permit issued — General Construction
Q01165658-I1-GC-CX
03/14/2025
Filed — Alteration
HEREWITH FILED TO REPLACE FIXTURES IN EXISTING KITCHEN, BATHROOMS AND LAUNDRY. CONVERT EXISTING OIL FIRED COMBI. BOILER TO NEW GAS FIRED COMBI. BOILER.
Q01165658-S1
02/20/2025
Filed — Alteration
HEREWITH FILED TO REPLACE FIXTURES IN EXISTING KITCHEN, BATHROOMS AND LAUNDRY. CONVERT EXISTING OIL FIRED COMBI. BOILER TO NEW GAS FIRED COMBI. BOILER.
Q01165658-I1
01/13/2025
Special inspection requirement — Permanent certificate
Rajasekhar Sakhamuri
01/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
01/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
01/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
01/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Rajasekhar Sakhamuri
01/13/2025
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
01/13/2025
Special inspection requirement — Fenestration air leakage
Rajasekhar Sakhamuri
01/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Rajasekhar Sakhamuri
01/13/2025
Special inspection requirement — Interior lighting power
Rajasekhar Sakhamuri
01/13/2025
Special inspection requirement — Insulation placement and R values
Rajasekhar Sakhamuri
01/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Rajasekhar Sakhamuri
01/13/2025
Special inspection requirement — Air barrier - visual inspection
Rajasekhar Sakhamuri
01/10/2025
Special inspection requirement — Final
Rajasekhar Sakhamuri
01/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rajasekhar Sakhamuri
09/10/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/15/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/12/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offARISTON CONSTRUCTION CO I01/12/2026
DOB NOWPlumbingSigned-offHYDRO PLBG & HTG CORP12/01/2025
DOB NOWPlumbingSigned-offHYDRO PLBG & HTG CORP06/09/2025
DOB NOWGeneral ConstructionSigned-offARISTON CONSTRUCTION CO I03/18/2025
1 project · most recent 05/01/2026
General Wiring
FiledStatusContractorScope
05/01/2026CompleteKET ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/15/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/13/2025Permanent certificateRajasekhar Sakhamurienergy_progress
01/13/2025Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
01/13/2025Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
01/13/2025Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
01/13/2025HVAC-R and service water piping design and insulationRajasekhar Sakhamurienergy_progress
01/13/2025Fenestration areasRajasekhar Sakhamurienergy_progress
01/13/2025Fenestration air leakageRajasekhar Sakhamurienergy_progress
01/13/2025HVAC-R and service water heating equipmentRajasekhar Sakhamurienergy_progress
01/13/2025Interior lighting powerRajasekhar Sakhamurienergy_progress
01/13/2025Insulation placement and R valuesRajasekhar Sakhamurienergy_progress
01/13/2025HVAC-R and service water heating system controlsRajasekhar Sakhamurienergy_progress
01/13/2025Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
01/10/2025FinalRajasekhar Sakhamuriprogress
01/10/2025Structural Stability – Alterations of existing buildingsRajasekhar Sakhamurispecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026Q01165658-S1Request digital key ↗
08/17/2026Q01165658-I1Request digital key ↗
08/17/2026Q01165658-P1Request digital key ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q01165658-I1Open ↗
09/01/2026Q01165658-I1Open ↗
09/01/2026Q01165658-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q01165658-I1Open ↗
08/13/2026Q01165658-S1Open ↗
08/13/2026Q01165658-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01165658-I1Open ↗
09/01/2026Q01165658-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q01165658-I1Open ↗
08/13/2026Q01165658-P1Open ↗
08/13/2026Q01165658-S1Open ↗