← Back
Two stories - detached, small or mid-size
45-34 PARSONS BOULEVARD
QUEENS · BIN 4117561
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3XZoning
2,028 sfGross Floor Area
1Units
1 Open Violation ▸
Two stories - detached, small or mid-size · Owner of record: 4534 PARSONS REALTY LLC · 5,441 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 6 docs
Floor 214p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
15411 ASH STREET2509/13/2026
GOLDEN TIME CONTRACTING I603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/03/2025$1.4M—— → —$690/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC108/05/2026
MEHDI GHAZI, P.E., P.C.606/19/2026
MEI ARCHITECT PLLC206/19/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN TIME CONTRACTING IGeneral Contractor1307/08/2026
AMERGY SOLAR INCGeneral Contractor108/08/2026
WASOFF PLBG & UTILITY COPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802108/05/2026
MEHDI GHAZI, P.E. P.C.7129606/19/2026
TRIANGLE INSPECTION & TES7495206/19/2026
Building Lifecycle
All (81)Filed (9)Permit Issued (7)Signed Off (3)Violation (6)Inspection (2)Objection (24)Special Inspection (30)
08/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/07/2026
Permit issued — Solar
Q01434520-I1-SL
08/05/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF STRUCTURAL WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201989-S3
08/05/2026
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01434520-I1
08/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
08/05/2026
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
08/05/2026
Special inspection requirement — Duct leakage testing, insulation and design
MEHDI GHAZI
08/05/2026
Special inspection requirement — Fenestration areas
MEHDI GHAZI
08/05/2026
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
08/05/2026
Special inspection requirement — Maintenance information
MEHDI GHAZI
08/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
08/05/2026
Special inspection requirement — Air barrier — testing
MEHDI GHAZI
08/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
08/05/2026
Special inspection requirement — Permanent certificate
MEHDI GHAZI
08/05/2026
Special inspection requirement — Interior lighting power
MEHDI GHAZI
08/05/2026
Special inspection requirement — Electric vehicle service equipment requirements
MEHDI GHAZI
08/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
08/05/2026
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
08/05/2026
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
08/05/2026
Special inspection requirement — Metering
MEHDI GHAZI
08/05/2026
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
08/05/2026
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
08/05/2026
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
08/05/2026
Special inspection requirement — Heating Systems
MEHDI GHAZI
08/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
08/05/2026
Special inspection requirement — Final
MEHDI GHAZI
08/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
07/27/2026
Objection resolved — Addressed
07/22/2026
Special inspection requirement — Final
Chun Feng
07/22/2026
Special inspection requirement — Air barrier - visual inspection
Chun Feng
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/08/2026
Objection raised — Zoning
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Other
06/29/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF STRUCTURAL WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201989-S4
06/25/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/19/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF STRUCTURAL WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201989-P2
06/19/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF STRUCTURAL WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201989-P1
06/11/2026
Permit issued — Curb Cut
Q01201989-S4-CC
04/20/2026
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201998-I1
03/04/2026
Violation issued (ECB, closed)
Construction
03/04/2026
Violation issued (ECB, closed)
Construction
03/04/2026
Violation issued (ECB, closed)
Construction
03/04/2026
Violation issued (ECB, open)
Site Safety
01/26/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF STRUCTURAL WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201989-S4
08/26/2025
Violation issued (ECB, closed)
Construction
08/26/2025
Violation issued (ECB, closed)
Construction
08/14/2025
Permit issued — Plumbing
Q01201989-S3-PL
08/13/2025
Permit issued — General Construction
Q01201989-I1-GC-CX
08/12/2025
Permit issued — Foundation
Q01201989-S1-FO-EA
08/11/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF STRUCTURAL WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201989-S3
08/11/2025
Permit issued — Structural
Q01201989-S2-ST
07/24/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF STRUCTURAL WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201989-S1
07/24/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF STRUCTURAL WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201989-S2
07/24/2025
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedAMERGY SOLAR INC08/07/2026
DOB NOWCurb CutSigned-offGOLDEN TIME CONTRACTING I06/11/2026
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO08/14/2025
DOB NOWGeneral ConstructionPermit IssuedGOLDEN TIME CONTRACTING I08/13/2025
DOB NOWFoundationPermit IssuedGOLDEN TIME CONTRACTING I08/12/2025
DOB NOWStructuralSigned-offGOLDEN TIME CONTRACTING I08/11/2025
DOB NOWConstruction FenceSigned-offGOLDEN TIME CONTRACTING I05/19/2025
1 project · most recent 06/19/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/19/2026Signed-offGOLDEN TIME CONTRACTING IHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAM2 48,000 BTU · Heat Pump Outdoor ×6
1 project · most recent 06/19/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/19/2026Signed-offWASOFF PLBG & UTILITY COStorm, Water/Sanitary
3 projects · most recent 07/24/2026
General Wiring
FiledStatusContractorScope
07/24/2026CompleteI.P. ELECTRIC INC—
04/17/2026CompleteSWITCH ELECT OF THE FIVEGeneral Wiring
08/15/2025Permit IssuedA.C. MORGAN ELECTRICGeneral Wiring
1 project · most recent 06/19/2026
Steel Masonry Wood
FiledStatusContractorScope
06/19/2026Signed-offGOLDEN TIME CONTRACTING ISteel, Masonry, Wood
1 project · most recent 08/05/2026
FiledStatusContractorScope
08/05/2026Permit IssuedAMERGY SOLAR INC78 panels, 35.1 kw, 2,783 roof_area_sqft
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/25/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
08/05/2026HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
08/05/2026Energy Code Compliance InspectionsMEHDI GHAZIprogress
08/05/2026Duct leakage testing, insulation and designMEHDI GHAZIenergy_progress
08/05/2026Fenestration areasMEHDI GHAZIenergy_progress
08/05/2026Insulation placement and R valuesMEHDI GHAZIenergy_progress
08/05/2026Maintenance informationMEHDI GHAZIenergy_progress
08/05/2026HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
08/05/2026Air barrier — testing MEHDI GHAZIenergy_progress
08/05/2026Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
08/05/2026Permanent certificateMEHDI GHAZIenergy_progress
08/05/2026Interior lighting powerMEHDI GHAZIenergy_progress
08/05/2026Electric vehicle service equipment requirementsMEHDI GHAZIenergy_progress
08/05/2026HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
08/05/2026Ventilation and air distribution systemMEHDI GHAZIenergy_progress
08/05/2026Fenestration air leakageMEHDI GHAZIenergy_progress
08/05/2026MeteringMEHDI GHAZIenergy_progress
08/05/2026Protection of exposed foundation insulationMEHDI GHAZIenergy_progress
08/05/2026Air barrier - visual inspectionMEHDI GHAZIenergy_progress
08/05/2026Mechanical SystemsMEHDI GHAZIspecial
08/05/2026Heating SystemsMEHDI GHAZIspecial
08/05/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/05/2026Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
08/05/2026Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
08/05/2026FinalMEHDI GHAZIprogress
08/05/2026Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
Latest 25 of 42.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026Q01201998-I1Request digital key ↗
08/19/2026Q01201989-S3Request digital key ↗
08/19/2026Q01201989-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/19/2026Q01201989-I1Open ↗
08/19/2026Q01201989-P1Open ↗
08/13/2026Q01201989-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/19/2026Q01201989-P1Open ↗
08/13/2026Q01201989-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01201989-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026Q01201998-I1Open ↗
08/19/2026Q01201989-S2Open ↗
08/19/2026Q01201989-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026Q01201989-I1Open ↗
08/29/2026Q01201989-I1Open ↗
08/28/2026Q01434520-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026Q01201989-I1Open ↗
08/29/2026Q01201989-I1Open ↗
08/28/2026Q01434520-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/19/2026Q01201989-S1Open ↗
08/19/2026Q01201989-S2Open ↗
08/19/2026Q01201989-I1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/19/2026Q01201989-P1Open ↗
08/13/2026Q01201989-I1Open ↗
08/13/2026Q01201989-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01201989-S1Open ↗
08/13/2026Q01201989-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/19/2026Q01201989-P1Open ↗
08/13/2026Q01201989-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/19/2026Q01201989-P1Open ↗
08/13/2026Q01201989-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026Q01201989-I1Open ↗
08/19/2026Q01201989-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01201989-S1Open ↗